Loading...
HomeMy WebLinkAbout0104493-Building (bathroom remodel)No 104493 CITY OF OSHKOSH OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 707 E IRVING AVE Owner ARTHUR J HAZEN JR Create Date 10/01/2003 Designer Contractor TOM WILLIAMS BUILDING CONTRACTOR Category 140 - Interior Remodeling Plan Type 10 Building ~ Sign ~ Canopy ~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Remodeling the bathroom to include removal and replacement of drywall. No structural changes or walls will be relocated. of Work HVAC Contractor Plumbing Contractor ZENTNER PLUMBING Electric Contractor TRUCK ELEC Fees: Valuation $1,500.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Issued By: Date 10/01/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 501 IOWA STREET OSHKOSH WI 54902 - 0000 Telephone Number 233-7817 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.