HomeMy WebLinkAbout0104459-Building (shed)OSHKOSH
ON THE WATER
Job Address 1241 SPRUCE ST
Designer
Category
Type · Building
Zoning
CITY OF OSHKOSH
BUILDING PERMIT ~ APPLICATION AND RECORD
Owner RAINBOW ENTERPRISES Create Date
Contractor OWNER
151 - New Utility Buildings-Sheds (Residential) Plan
C) Sign (~ Canopy (~ Fence (~ Raze
Class of Const: Size
No '104459
09/29/2003
Unfinished/Basement
Finished/Living
Garage
Foundation
Occupancy Permit
Park Dedication
0 Sq. Ft. Rooms
0 Sq. Ft. Bedrooms
0 Sq. Ft. Baths
Poured Concrete (~ Floating Slab (~ Pier
Concrete Block (~ Post ~) Treated Wood
Not Required Flood Plain
# Dwelling Units
0 Height
0 Stories
0
· Other
0 Ft.
[~Pr~ecfionj
Canopies 0
Signs 0
Treated floor secured to ground
Height Permit
# Structures 0
Use/Nature RES/Install a 4x6 shed in rear yard.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: ~ h~
$500.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid $20.00 Park Dedication $0.00
Date 09/30/2003 Final/O.P. 00/00/0000
[] Perrni[ Voided j
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an ea~r)nent, the City strongly urges the permit applicant to contact the easement
Signatureh°lder(s) and/to,~/,secure,¢ ~'~'any necessary~approy~s/~~efore.~tarting such ~actiyJ, ty. Bate 4~'/~,/~,--~
I'~- - Agent/Owne-- r ' -/
Address 3~OAKLAND LN OSHKOSH WI 54902 - 7328 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.