Loading...
HomeMy WebLinkAbout0104473-Building (footing & foundation)OSHKOSH ON THE WATER Job Address Designer Category Type Zoning Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication 2480 SECURITY DR CITY OF OSHKOSH No '104473 BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN & AMY SCHICK Create Date 09/29/2003 Contractor DAVIS CONCRETE CONSTRUCTION 112 - Foundation Permit Single Family · Building O Sign Canopy O Fence (~ Raze Class of Const: 0 Sq. Ft. Rooms 0 Height 0 Sq. Ft. Bedrooms 0 Stories 0 Sq. Ft. Baths 0 · Poured Concrete (~ Floating Slab (~ Pier (~ Other O Concrete Block (~ Post (~) Treated Wood Not Required Flood Plain # Dwelling Units 0 Plan 0 Ft. Size [] Projection Canopies Signs Height Permit # Structures 0 0 '0 Use/Nature -_-ARLY START PERMIT/Footing and Foundation only!! of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: $10,000.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $140.00 Park Dedication $0.00 Date 09/30/2003 Final/O.P. 00/00/0000 [] Permit Voided j in the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a par[y, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) an~d to. cure any nece~aW~revals before starting such activity. Signatur~J~C.~/.~f ~-~'~ Date ¢/j~_~ Y/~ Yl/ Agent/Own er ~/ ' Addre.~ 2740 LEILA'MAE-LN OSHKOSH WI 54902 - 0000 Telephone Number 426-3339 426-1809 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request Es received. Work may continue if the inspection is not performed within two business days from the time the project is ready.