Loading...
HomeMy WebLinkAbout0104451-Building (basement bedroom)OSHKOSH ON THE WATER Job Address 424 N EAGLE ST 140 - Intador Remodeling CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner ERIC D Y BURNARD/KAY A QUINNE Create Date Contractor OWNER No 104451 09/29/2003 Designer Category Type · Building (~) Sign (~ Canopy O Fence (~) Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies __ Garage 0 Sq. Ft. Baths 0 Signs Foundation · Poured Concrete (~ Floating Slab (~) Pier (~) Other O Concrete Block (~) Post C) Treated Wood Occupancy Permit Not Required Flood Plain __ Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Plan Use/Nature SFPJ Creating a bedroom in the basement· An egress window has been installed under a previous building permit· A minimum of 7' of Work ~eiling height will be provided and 8% light. HVAC Contractor Electric Contractor Fees: $2,000.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided Plumbing Contractor $25.00 Park Dedication $0.00 Date 09/29/2003 Fioal/O.P. 00/00/0000 In the pe[formance of this work I agree to perform ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approves before starting such a,~Civity. Signature (..~' Agent/Owne¢ Address 424 N E~AGLE ST OSHKOSH WI 54902 - 4226 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.