Loading...
HomeMy WebLinkAbout0104412-Building (steel stud wall)OSHKOSH ON THE WATER Job Address 1641 S MAIN ST Designer Category '141 - Extedor Remodeling Type · Building O Sign CITY OF OSHKOSH No t044'12 BUILDING PERMIT - APPLICATION AND RECORD Owner ROBERT/SHIRLEY STAUFFER Create Date 09/26/2003 Contractor OWNER Canopy (~ Fence C) Raze Plan Zoning Class of Const: Unfinished/Basement 0 Sq, Ft. Rooms 0 Height Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq, Ft. Baths 0 Foundation · Poured Concrete C) Floating Slab C) Pier (~) Other (~) Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain No Park Dedication Not Required # Dwelling Units 0 0 Ft. Size [] Projection J Canopies Signs Height Permit Not Required # Structures 0 Use/Nature Warehouse/Construct steel stud, steel wall in place of overhead door opening on North elevation as per plans. of Work HVAC Contractor Electric Contractor Fees: Valuation ~,...,,-~00 Issued By:~ Plan Approval Plumbing Contractor $0.00 Permit Fee Paid [] Permit Voided I $25.00 Park Dedication $0.00 Date 09/26/2003 Final/O.P, 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure.~essary ap,~al~fore starting such activity. Signature ~ J~.~ //~/...'"~-~ ~ Date ~-- i Agent/Owner Address 1641 S MAIN ST OSHKOSH WI 54902 - 6988 Telephone Number To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.