HomeMy WebLinkAbout0104412-Building (steel stud wall)OSHKOSH
ON THE WATER
Job Address 1641 S MAIN ST
Designer
Category '141 - Extedor Remodeling
Type · Building O Sign
CITY OF OSHKOSH No t044'12
BUILDING PERMIT - APPLICATION AND RECORD
Owner ROBERT/SHIRLEY STAUFFER Create Date 09/26/2003
Contractor OWNER
Canopy (~ Fence C) Raze
Plan
Zoning Class of Const:
Unfinished/Basement 0 Sq, Ft. Rooms 0 Height
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories
Garage 0 Sq, Ft. Baths 0
Foundation · Poured Concrete C) Floating Slab C) Pier (~) Other
(~) Concrete Block (~ Post (~ Treated Wood
Occupancy Permit Not Required Flood Plain No
Park Dedication Not Required # Dwelling Units 0
0 Ft.
Size
[] Projection J
Canopies
Signs
Height Permit Not Required
# Structures 0
Use/Nature Warehouse/Construct steel stud, steel wall in place of overhead door opening on North elevation as per plans.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation ~,...,,-~00
Issued By:~
Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid
[] Permit Voided I
$25.00 Park Dedication $0.00
Date 09/26/2003 Final/O.P, 00/00/0000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure.~essary ap,~al~fore starting such activity.
Signature ~ J~.~ //~/...'"~-~ ~ Date ~--
i Agent/Owner
Address 1641 S MAIN ST OSHKOSH WI 54902 - 6988 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.