HomeMy WebLinkAbout27. 18-86 FEBRUARY 13, 2018 18-86 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT NO. 17-06 CONCRETE SIDEWALK (NEW & REHABILITATION) (+$231,840.58) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: AL DIX CONCRETE, INC. 401 Gertrude Street Kaukauna, WI 54130 Net Increase to contract: $231,840.58 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. Nos.311-0410-7480-00000 Sidewalk Construction Fund 317-0410-7480-03304 Special Assessments Fund — Sidewalks 315-0410-7480-00000 Street Improvement Fund - Streets 541-1867-6401-08673 Water Utility—Maintenance of Mains 541-1867-6401-08675 Water Utility—Maintenance of Services 323-0740-7216-06316 Property Improvement Fund —Land Improvements 02230460-6565 Street Lighting Fund — Concrete/Asphalt City of� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works -"-J DATE: February 8, 2018 RE: Change Order No. 2 for Public Works Contract No. 17-06 Concrete Sidewalk (New and Rehabilitation) Al Dix Concrete, Inc. (+$231,840.58) BACKGROUND Change Order No. 2 for Contract 17-06 is scheduled for consideration by the Common Council at the February 13, 2018 meeting. The contract was originally awarded to Al Dix Concrete, Inc. in March of 2017 and Change Order No. 1 was approved by the Common Council in September of 2017. This change order includes additional services that were required which were outside of the original scope of services for the contract. ANALYSIS Following is a summary of the significant changes to each section of the Capital Improvements Program (CIP): • Sidewalk - Additional sidewalks and driveway approaches requested by adjacent property owners and an underestimation of some quantities in the bidding documents. • Water Utility Operating - Quantities adjusted to match final field conditions. • Electrical Operating - Quantities adjusted to match final field conditions. I:\Engineering\2017 CONTRACTS\17-06 Sidewalk Page 1 OE 2 Prog\Project_Information\Correspondence\Memo\17-06 Memo for CO #2_2-8-18.docx FISCAL IMPACT Contract Section Change Order Amount New Contract Total CIP Budget Amount Concrete Paving $0.00 $72,841.65 $90,000.00 Sanitary Sewer $0.00 $10,098.00 $13,000.00 CIP - Sidewalk $233,655.09 $985,825.09 *$985,825.00 Water Utility Operating $2,154.95 $204,254.95 $226,352.00 Property Improvements -$4,725.46 $72,090.44 $86,034.00 Park Improvements $0.00 $10,625.00 $11,900.00 Electrical Operating $756.001 $756.001 $756.00 Total $231,840.581 $1,3561491.13 $1,413,867.00 *Budget amount reflects the new total after proposed amendment (Res. No. 18-85) to the 2017 Capital Improvement Program (CIP). Funding for the sidewalk rehabilitation portion of the project is available in the 2017 CIP. Funding for the Water Utility and Electrical Division portions of the projects is included in the respective Operating Budgets. Funding for the overage in the Sidewalk section of the 2017 CIP is all work for which the City will be reimbursed from adjacent property owners. Property owners will be billed for work done abutting their property. RECOMMENDATIONS I recommend approval of Change Order No. 2 to Contact No. 17-06 in the amount of +$231,840.58 to Al Dix Concrete, Inc. Approved: Mark A. Rohloff City Manager SMG/dt l:\Engineering\2017 CONTRACTS\17-06 Sidewalk Page 2 of 2 Prog \ Project_Wormation\ Correspondence \ Memo \ 17-06 Memo for CO p2_2-8-18.dooc TO: AL DIX CONCRETE, INC. 401 GERTRUDE STREET KAUKAUNA, WI 54130 CHANGE ORDER #2 DATE: JANUARY 17, 2018 Your present contract with the City of Oshkosh, Contract No. 17-06, awarded March 28, 2017, is hereby amended and changed as follows: NET INCREASE TO: SECTION I $231,840.58 SECTION I TOTALS BID TOTAL $1,041,710.90 $1,041,710.90 CO #1 (N EAGLE ST) $82,939.65 $82,939.65 PREVIOUS CONTRACT TOTAL $1,124,650.55 $1,124,650.55 CO #2 $231,840.58 $231,840.58 CONTRACT TOTAL $1,356,491.13 $1,356,491.13 CITY OF OSHKOSH BY: City Manager City Clerk proved and accepted: g&" P1, Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney Comptroller CONTRACT 17-06 CHANGE ORDER #2 SECTION I: Work Unit A ITEM DESCRIPTIONUNIT UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Removing concrete and asphalt sidewalk and driveway, complete as Square A-1120 specified Feet 84,180.00 119,616.28 35,436.28 $1.10 $38,979.91 4" concrete sidewalk with 3" CABC and grading, complete Square A-1500 asspecified Feet 59,712.00 73,160.35 13,448.35 $3.70 $49,758.90 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading, complete as Square A-1510 specified Feet 21,468.00 55,914.49 34,446.49 $4.00 $137,785.96 SECTION I - WORK UNIT A (BID ITEMS A-1120 - A-1510) - SUBTOTAL SECTION I - ADDITIONAL WORK REQUIRED: CO #2 $226,524.77 $0.00 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 8" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete Square 2-A-1524 asspecified Yards 0.00 557.50 557.50 $5.50 $3,066.25 8" concrete pavement removal and replacement; including sawing; pavement ties; integral curb and fine grading; turf restoration; and traffic control; complete as Linear 2-B-1318 specified Feet 0.00 16.67 16.67 $68.00 $1,133.56 No. 4 reinforcing rods - deformed, epoxy -coated, Linear 2-C-1550 complete as specified Feet 0.00 1,000.00 1,000.00 $1.10 $1,100.00 Drilled No. 4 sidewalk tie bars - deformed, epoxy -coated, 2-C-1560 complete as specified Each 0.00 4.00 4.00 $4.00 $16.00 SECTION I -(ADDITIONAL WORK REQUIRED: CO #2 ITEMS 2-A-1524 - 2-C-1560) -SUBTOTAL $5,315.81 $0.00 NET INCREASE TO: SECTION 1 $231,840.58 NET INCREASE TO SECTION 1 $231,840.58 NET DECREASE TO SECTION 1 $0.00 NET INCREASE TO CONTRACT: $231,840.58 Page 1 of 1