HomeMy WebLinkAbout_Staff PresentationOutline of Staff Presentation
Review of Options for Oshkosh Avenue Corridor
1. Background
a. Current Roadway / Right-of-way Profiles
b. TIF Budget Assumptions
2. Options From Workshop
a. Base Model: 4 Lanes With Turning Lanes At Westfield
b. Other Options Above Base Model — Not In TIF Budget
c. Wider Street Options May Require Full Reconstruct (Greater
Cost)
3. Special Assessments
a. Base Model: No Special Assessments Along Oshkosh Avenue
b. Full Reconstruction Of Oshkosh Avenue Would Trigger Special
Assessments
c. Streets To North Will Warrant Special Assessments
4. Next Steps
a. Traffic Review Advisory Board (February 13)
b. Plan Commission Neighborhood Information Meeting
(February 20)
c. Council Action (February 27)
5. Questions/Additional Information Sought By Council
For additional information beyond this outline, please refer to
the video of the "Joint Workshop on Traffic Impact Analysis for
Oshkosh Avenue" (1/30/18) available on Oshkosh Media and
handouts provided prior to the workshop.
2/13/2018
Staff Presentation for Oshkosh Avenue
Corridor Traffic Impact Analysis
February 13, 2018
Looking East at Koeller Looking West at Sawyer
i
Looking West at Westfield
Oshkosh
Overview
• Background
• Corridor Options Presented at Workshop
• Special Assessments
• Next Steps
• Questions/Additional Information Desired
L
Oshkosh
1
2/13/2018
Background
• Current Oshkosh Avenue Configuration
J
MW - _
Oshkosh
Background
• Current Oshkosh Avenue Configuration
• Sixty-six foot right of way
• Four lane street (two lanes in each direction)
• No turning movement separation (turn lanes)
• Six foot sidewalk adjacent to curb (no terrace)
A:
Oshkosh
2
2/13/2018
Background
• Current Oshkosh Avenue Configuration
;y.oy ROW-My
65'
6' i! 17 12'
PNEYGIK _0 S.
O5'—{ o-W11N
CIhiU CIVRIB
Entire Corridor
,�
Oshkosh
Background
• TIF 34 & 35 Budget Assumptions
• Maintain four lane undivided cross section between Koeller
Street and Sawyer Street
• Obtain additional right of way necessary to construct turn
lanes at Westfield Street and establish terrace on north side of
Oshkosh Avenue
• Develop left turn lanes at Westfield Street
• Obtain additional right of way necessary to construct
additional south bound lane at Koeller Street roundabout
• Develop additional southbound lane at Koeller Street
Oshkosh
3
2/13/2018
Background
• TIF 34 & 35 Budget Assumptions
Cn
Oshkosh Avenue _.
y -
Oshkosh
Background
• TIF 34 & 35 Budget Assumptions
• Base Model Assumption
--� ,as III
16 5f ASTIQIIU I.b
Turn Lanes at Westfield Street a�
esas.,a�grtWawy
co.w—IIs os „ {—Ir�,z�u• os �a�xw+. 1 Ij�
(Remainder of Corridor Os` '
hkosh
4
2/13/2018
Background
• TIF 34 & 35 Budget Assumptions
• Corridor wide improvements: $345,000 (street lights and
streetscaping) (TIF 34 & 35)
• Westfield Street turn lane development: $595,000 (TIF 34 & 35)
• Koeller Street southbound lane development: $385,000 (TIF 34
& 35)
• Sawyer Street intersection improvements: $5,797,300 (TIF 35)
L
Oshkosh
Corridor Options Presented at Workshop
• Four Lane Undivided
• Two - Way Left Turn Lane (TWLTL)
• Four Lane Divided
Four Lane Divided
Four Lane Undivided
s�
Five Lane TWLI'L Oshkosh
5
2/13/2018
Corridor Options Presented at Workshop
• Four Lane Undivided
z.s�An
ul zs � o I >� ix
ter.-,uw ux.�
Turn Lanes at Westfield Street
Remainder of Corridor Oshkosh
Corridor Options Presented at Workshop
• Two — Way Left Turn Lane (TWLTL)
_U
TWO-WAY
LEFT-TURN LANE
S Five-Lane TWLTL
Koeller St.to Eagle St,
Oshkosh
6
2/13/2018
Corridor Options Presented at Workshop
• Two - Way Left Turn Lane (TWLTL)
ex�snHc exsnuc
fuv TWO-WAY rw,
LEFT-TURN LANE
6n[� G.ws� lrn
Three-Lane TWLTL
Eagle St.to Fox River
: �
Oshkosh
Corridor Options Presented at Workshop
• Four Lane Divided
L_q"7Y�'�
wnA Corridor
Koeller St.to Eagle St.Only
MwF
,�a> 1
eoe Iievve6E r__11 12 f- t w,e�s� Zane` 12 I 11' —1+ Jrtwrtc[�m vwx
Westfield St Intersection Oshkosh
7
2/13/2018
Corridor Options Presented at Workshop
• Four Lane Undivided
• Very similar to Base Model assumption in TIF Plan
• Estimated cost included in TIF Plan: $940,000 (Westfield Street
turn lanes, street lights and streetscaping)
• Two — Way Left Turn Lane (TWLTL)
• Full reconstruction of Oshkosh Avenue likely required
• Four Lane Divided
• Full reconstruction of Oshkosh Avenue likely required
• Estimated cost of reconstruction: $4,200,000 r
Oshkosh
Special Assessments
• Base Corridor Model (Four Land Undivided)
• No Special Assessments Levied
• Full Reconstruction of Oshkosh Avenue (TWLTL and
Four Lane Divided)
• Special Assessments would be levied in accordance with
Special Assessment Policy
• New Streets North of Oshkosh Avenue (Westfield Street
and extension of Koeller Street)
• No Special Assessments would be levied to Oshkosh Corp:
• Special Assessments would be levied to other properties Oshkosh
8
2/13/2018
Next Steps
• Traffic Review Advisory Board
• February 131h
• Plan Commission Neighborhood Meeting
• February 201h
• Common Council Action
• February 2711-1
Oshkosh
Questions/Additional Information Desired
Looking East at Koeller Looking West at Sawyer
Looking West at Westfield
Oshkosh
9