HomeMy WebLinkAbout_Staff PresentationOutline of Staff Presentation Review of Options for Oshkosh Avenue Corridor 1. Background a. Current Roadway / Right-of-way Profiles b. TIF Budget Assumptions 2. Options From Workshop a. Base Model: 4 Lanes With Turning Lanes At Westfield b. Other Options Above Base Model — Not In TIF Budget c. Wider Street Options May Require Full Reconstruct (Greater Cost) 3. Special Assessments a. Base Model: No Special Assessments Along Oshkosh Avenue b. Full Reconstruction Of Oshkosh Avenue Would Trigger Special Assessments c. Streets To North Will Warrant Special Assessments 4. Next Steps a. Traffic Review Advisory Board (February 13) b. Plan Commission Neighborhood Information Meeting (February 20) c. Council Action (February 27) 5. Questions/Additional Information Sought By Council For additional information beyond this outline, please refer to the video of the "Joint Workshop on Traffic Impact Analysis for Oshkosh Avenue" (1/30/18) available on Oshkosh Media and handouts provided prior to the workshop. 2/13/2018 Staff Presentation for Oshkosh Avenue Corridor Traffic Impact Analysis February 13, 2018 Looking East at Koeller Looking West at Sawyer i Looking West at Westfield Oshkosh Overview • Background • Corridor Options Presented at Workshop • Special Assessments • Next Steps • Questions/Additional Information Desired L Oshkosh 1 2/13/2018 Background • Current Oshkosh Avenue Configuration J MW - _ Oshkosh Background • Current Oshkosh Avenue Configuration • Sixty-six foot right of way • Four lane street (two lanes in each direction) • No turning movement separation (turn lanes) • Six foot sidewalk adjacent to curb (no terrace) A: Oshkosh 2 2/13/2018 Background • Current Oshkosh Avenue Configuration ;y.oy ROW-My 65' 6' i! 17 12' PNEYGIK _0 S. O5'—{ o-W11N CIhiU CIVRIB Entire Corridor ,� Oshkosh Background • TIF 34 & 35 Budget Assumptions • Maintain four lane undivided cross section between Koeller Street and Sawyer Street • Obtain additional right of way necessary to construct turn lanes at Westfield Street and establish terrace on north side of Oshkosh Avenue • Develop left turn lanes at Westfield Street • Obtain additional right of way necessary to construct additional south bound lane at Koeller Street roundabout • Develop additional southbound lane at Koeller Street Oshkosh 3 2/13/2018 Background • TIF 34 & 35 Budget Assumptions Cn Oshkosh Avenue _. y - Oshkosh Background • TIF 34 & 35 Budget Assumptions • Base Model Assumption --� ,as III 16 5f ASTIQIIU I.b Turn Lanes at Westfield Street a� esas.,a�grtWawy co.w—IIs os „ {—Ir�,z�u• os �a�xw+. 1 Ij� (Remainder of Corridor Os` ' hkosh 4 2/13/2018 Background • TIF 34 & 35 Budget Assumptions • Corridor wide improvements: $345,000 (street lights and streetscaping) (TIF 34 & 35) • Westfield Street turn lane development: $595,000 (TIF 34 & 35) • Koeller Street southbound lane development: $385,000 (TIF 34 & 35) • Sawyer Street intersection improvements: $5,797,300 (TIF 35) L Oshkosh Corridor Options Presented at Workshop • Four Lane Undivided • Two - Way Left Turn Lane (TWLTL) • Four Lane Divided Four Lane Divided Four Lane Undivided s� Five Lane TWLI'L Oshkosh 5 2/13/2018 Corridor Options Presented at Workshop • Four Lane Undivided z.s�An ul zs � o I >� ix ter.-,uw ux.� Turn Lanes at Westfield Street Remainder of Corridor Oshkosh Corridor Options Presented at Workshop • Two — Way Left Turn Lane (TWLTL) _U TWO-WAY LEFT-TURN LANE S Five-Lane TWLTL Koeller St.to Eagle St, Oshkosh 6 2/13/2018 Corridor Options Presented at Workshop • Two - Way Left Turn Lane (TWLTL) ex�snHc exsnuc fuv TWO-WAY rw, LEFT-TURN LANE 6n[� G.ws� lrn Three-Lane TWLTL Eagle St.to Fox River : � Oshkosh Corridor Options Presented at Workshop • Four Lane Divided L_q"7Y�'� wnA Corridor Koeller St.to Eagle St.Only MwF ,�a> 1 eoe Iievve6E r__11 12 f- t w,e�s� Zane` 12 I 11' —1+ Jrtwrtc[�m vwx Westfield St Intersection Oshkosh 7 2/13/2018 Corridor Options Presented at Workshop • Four Lane Undivided • Very similar to Base Model assumption in TIF Plan • Estimated cost included in TIF Plan: $940,000 (Westfield Street turn lanes, street lights and streetscaping) • Two — Way Left Turn Lane (TWLTL) • Full reconstruction of Oshkosh Avenue likely required • Four Lane Divided • Full reconstruction of Oshkosh Avenue likely required • Estimated cost of reconstruction: $4,200,000 r Oshkosh Special Assessments • Base Corridor Model (Four Land Undivided) • No Special Assessments Levied • Full Reconstruction of Oshkosh Avenue (TWLTL and Four Lane Divided) • Special Assessments would be levied in accordance with Special Assessment Policy • New Streets North of Oshkosh Avenue (Westfield Street and extension of Koeller Street) • No Special Assessments would be levied to Oshkosh Corp: • Special Assessments would be levied to other properties Oshkosh 8 2/13/2018 Next Steps • Traffic Review Advisory Board • February 131h • Plan Commission Neighborhood Meeting • February 201h • Common Council Action • February 2711-1 Oshkosh Questions/Additional Information Desired Looking East at Koeller Looking West at Sawyer Looking West at Westfield Oshkosh 9