HomeMy WebLinkAboutMiron Change Order No 1 17-03City of� Oshkosh February 2, 2018 Ms. Jessica Mayer Miron Construction Co. PO Box 509 Neenah, WI 54957-0509 RE: Change Order No.1 Contract 17-03 Dear Ms. Mayer Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Miron Construction Co. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, Jame be, P.E , PESC Director of Pu 'c Works JER/tlt Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) Paul Timm, AECOM (w/copy) File (w/original) L\ Engineering \ 2017 CONTRACTS \ 17-03 Oshkosh Ave Swr\ Project_Information \ Contract Info \ Change Orders\17-03 Executed CO #1 Ltr_2-1-18.docx Page 1 of 1 City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us TO: MIRON CONSTRUCTION CO. PO BOX 509 NEENAH, WI 54957-0509 CHANGE ORDER #1 DATE: JANUARY 9, 2018 Your present contract with the City of Oshkosh, Contract No. 17-03, awarded October 24, 2017, is hereby amended and changed as follows.- NET ollows: NET INCREASE TO: CONTRACT NET INCREASE TO CONTRACT BID TOTAL CO #1 CONTRACT TOTAL CITY OF OSHKOSH $112,427.00 $112,427.00 CONTRACT TOTALS $2,981,403.60 $2,981,403.60 $112,427.00 $112,427.00 $3,093,830.60 $3,093,830.60 BY: =Managewr. , yClerk A roved and accept d: Contractor I certify that provision has been made to pay the liability that will accrue to the City DaysoG. Voss jr.Pre f Oshkosh, Wisconsin, under the within Change Order. i 04.UR i_ 2�.J Approved as torm: City Attor CONTRACT 17-03 CHANGE ORDER #1 ADDITIONAL WORK REQUIRED: CO #1 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY ADDITIONAL NET NET UNIT INCREASE IN DECREASE IN WORK INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Revise roof dormers from one (1) to six (6) and increase size of dormers, Lump 1-10001 complete asspecified Sum 0.00 1.00 1.00 $19,509.00 $19,509.00 Replace Split Face Concrete Masonry Unit (CMU) with stone veneer, complete as Lump 1-10002 specified Sum 0.00 1.00 1.00 $25,368.00 $25,368.00 Increase height of stone veneer, replacing cement board siding, complete as Lump 1-10003 specified Sum 0.00 1.00 1.00 $28,994.00 $28,994.00 Add stone veneer and sill to wood posts, complete as Lump 1-10004 s ecified Sum 0.00 1.00 1.00 $22,781.00 $22,781.00 Revise roof trusses to lower roof approximately two feet Lump 1-10005 (Z), complete asspecified Sum 0.00 1.00 1.00 $13,312.00 $13,312.00 Replace cement board siding on gabled building ends with wood, complete as specified Lump 1-10006 Sum 0.00 1.00 1.00 $2,463.00 $2,463.00 ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1-10001 - 1-10006) - SUBTOTAL $112,427.00 $0.00 NET INCREASE TO: CONTRACT $112,427.00 $0.00 NET INCREASE TO CONTRACT $112,427.00 NET DECREASE TO CONTRACT $0.00 NET INCREASE TO CONTRACT: $112,427.00 Page 1 of 1