HomeMy WebLinkAboutDorner Change Order No 2 17-12r i
3�3
"AA&
City
of
Oshkosh
February 1, 2018
Mr. Todd Dorner
Dorner, Inc.
PO Box 129
Luxemburg, WI 54217
RE: Change Order No. 2
Contract 17-12
Dear Mr. Dorner:
Enclosed is an executed copy of Change Order No. 2 between the City of Oshkosh and Dorner,
Inc. regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
J es Rabe, P.E., CPESC
Director of Public Works
JER/tlt
Enclosure: Change Order No. 2
cc: Pam Ubrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director (w/copy)
File (w/original)
I:\ Engineering\2017 CONTRACTS\ 17-12 Wtr Mn Relays\ Project_Information\Contract Info\Change
Orders\17-12 Executed CO #2 Ltr_2-1-18.docx Page 1 Of 1
City Hall, 215 Church Avenue P.O. Box 1 130 Oshkosh, WI 54903-1130 http://vvww.ci.oshkosh.wi.us
TO: DORNER INC.
E506 LUXEMBURG ROAD
LUXEMBURG, WI 54217
CHANGE ORDER #2
DATE: JANUARY 11. 2017
Your present contract with the City of Oshkosh, Contract No. 17-12, awarded June 13, 2017, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION 1 $251,156.32
NET DECREASE TO: SECTION 1 ($151,646.57)
NET INCREASE TO CONTRACT $99,509.75
TOTALS
BID TOTAL
$1,978,062.15
$1,978,062.15
CO #1
$116,607.05
$116,607.05
PREVIOUS CONTRACT
$2,094,669.20
$2,094,669.20
CO #2
$99,509.75
$99,509.75
CONTRACT TOTAL
$2,194,178.95
$2,194,178.95
CITY OF OSHKOSH
BY: _
City Manager
City Clerk
p oved and ac ept d:
Contr ctor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the
within Change Order.
Comptroller
CONTRACT 17-12 CHANGE ORDER 42
17-12 MISCELLANEOUS UTILITY IMPROVEMENTS
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
Removing pavement;
Square
1100
complete asspecified
Yards
911.00
1,187.32
276.32
$8.15
$2,252.01
Removing curb & gutter;
Linear
1110
complete as specified
Feet
145.00
465.54
320.54
$5.10
$1,634.75
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
1120
specified
Feet 7,770.00 7,551.39
-218.61 $0.60 ($131.17)
Unclassified excavation;
Cubic
1200
complete as specified
Yards 786.00 0.00
-786.00 $14.30 ($11,239.80)
7" concrete pavement
removal and replacement;
including sawing; pavement
ties; integral curb and fine
grading; turf restoration; and
traffic control; complete as
Square
1308
specified
Yards 781.00 1,272.97 491.97
$62.75 $30,871.12
7" concrete pavement HES
removal and replacement;
including sawing; pavement
ties; integral curb and fine
grading; turf restoration; and
traffic control; complete as
Square
1309
specified
Yards 75.00 0.00
-75.00 $68.85 ($5,163.75)
8" concrete pavement
removal and replacement;
including sawing; pavement
ties; integral curb and fine
grading; turf restoration; and
traffic control; complete as
Square
1318
specified
Yards 7,305.00 6,825.58
-479.42 $55.60 ($26,655.75)
8'' concrete pavement HES
removal and replacement;
including sawing; pavement
ties; integral curb and fine
grading; turf restoration; and
traffic control; complete as
Square
1319
specified
Yards 75.00 756.81 681.81
$61.70 $42,067.70
Adjust manholes and inlets;
1360
complete as specified
Each 36.00 34.00
-2.00 $210.00 ($420.00)
Turf restoration on West
Murdock Avenue; complete
Square
1370A
as specified
Yards 387.00 451.00 64.00
$8.15 $521.60
Turf restoration on Clairville
Square
1370B
Road; complete as specified
Yards 1,814.00 0.00
-1,814.00 $8.15 ($14,784.10)
Turf
restoration on Oshkosh
Avenue;
complete as
Square
1370C specified
Yards 65.00 108.79 43.79
$8.15 $356.89
Turf
restoration on West 6th
Avenue;
complete as
Square
1370D specified
Yards
298.00
309.50
11.50
$8.15
$93.73
Restore
gravel driveway/
Square
1372 apron;
complete as specified
Yar261.00
238.89
-22.11
$4.10
($90.65)
30"
curb and gutter, 8"; with
6"
CABC and grading;
:Feelt
1442 complete
as specified
150.00
1,071.00
921.00
$23.75
$21,873.75
Page 1 of 9
CONTRACT 17-12 CHANGE ORDER #2
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE /N
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
complete as specified Feet 2,277.00 1,670.45 -606.55 $0.60
4" concrete sidewalk with 3"
Drilled No. 4 sidewalk tie bars
- deformed; epoxy -coated;
1560
complete as specified Each 220.00 272.00 52.00 $5.10 $265.20
]($363
CABC and grading; complete
Square
Linear
1500
as specified
Feet
5,120.00
4,227.81
2,141.74
-892.19
$5.00
$2.30
($4,460.95)
6" concrete sidewalk/
Tack coat; complete as
driveway/ramp with 3" CABC
specified
Gallons
68.00
0.00
-68.00
$7.00
and grading; complete as
Square
1510
specified
Feet
576.00
1,433.58
857.58
$5.70
$4,888.21
Curb ramp detectable
complete as specified
Yards
580.00
684.57
104.57
$37.50
$3,921.38
warning field (natural/non-
4" asphaltic pavement with
painted); complete as
Square
Square
1,940
Gnarifiari
r.,,,.
Yards
366.00
522.53
156.53
$37.15
$5,815.09
Page 2 of 9
-- vc.vv �au.bu
($979.20)
No. 4 reinforcing rods -
deformed; epoxy -coated; Linear
1550
complete as specified Feet 2,277.00 1,670.45 -606.55 $0.60
Drilled No. 4 sidewalk tie bars
- deformed; epoxy -coated;
1560
complete as specified Each 220.00 272.00 52.00 $5.10 $265.20
]($363
Sawing existing pavement;
Linear
1700
complete as specified
Feet
2,110.00
2,141.74
31.74
$2.30
$73.00
Tack coat; complete as
1900
specified
Gallons
68.00
0.00
-68.00
$7.00
5" asphaltic pavement with
10" CABC and grading;
Square
1905
complete as specified
Yards
580.00
684.57
104.57
$37.50
$3,921.38
4" asphaltic pavement with
10" CABC and grading;
Square
1911
complete as specified
Yards
366.00
522.53
156.53
$37.15
$5,815.09
4" asphaltic pavement with 6"
CABC and grading; complete
Square
1916
as specified
Yards
228.00
197.50
-30.50
$36.20
($1,104.10)
Furnish and install 15" storm
Linear
2006
sewer; complete as specified
Feet
25.00
19.90
-5.10
$115.00
$586.50
Reconstruct 4' diameter
storm sewer manhole;
Vertical
2246
complete as specified
Feet
5.00
0.00
-5.00
$500.00
$2,500.00
Rebuild 6'x 6' storm sewer
box manhole; complete as
Vertical
2283
specified
Feet
21.00
1.82
-19.18
$825.00
$15,823.50
Furnish and install 6" storm
sewer lateral; complete as
Linear
2400
specified
Feet
142.00
116.00
-26.00
$45.00
$1,170.00
Furnish and install storm
sewer marker balls; complete
2404
as specified
Each
8.00
12.00
4.00
$25.00
$100.00
Furnish and install storm
sewer clay dams; complete
2406
as specified
Each
4.00
4.00
$100.00
Furnish and install storm
sewer lateral inlet; complete
2408
as specified
Each
3.00
3.00
$400.00
Furnish; install; maintain; and
remove Type D modified inlet
protection; complete as
2508
specified
Each
72.00
48.00
-24.00
$75.00
$1,800.00
Sediment removal - Type D
modified inlet protection;
2510
complete as specified
Each
72.00
0.00
-72.00 1
$5.00
$360.00
Page 2 of 9
CONTRACT 17-12 CHANGE ORDER #2
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
Furnish; install; maintain; and
remove stone bag; complete
2516
as specified
Each
15.00
10.00
-5.00
$5.00
$25.00
Furnish; install; maintain; and
remove 12" diameter
sediment logs; complete as
Linear
2518
specified
Furnish; install; maintain; and
Feet
60.00
85.00
25.00
$5.00
$125.00
remove ditch check;
2522
complete as specified
Each
21.00
18.00
-3.00
$150.00$45000
Install salvaged topsoil 6"
Square
.
2602
depth; complete as specified
Furnish and install native
Yards
25.00
3,866.13
3,841.13
$15.00
$57,616.95
seeding; complete as
Square
2610
specified
Furnish and install Class I;
Yards
3,000.00
3,866.13
866.13
$3.50
$3,031.46
Type A erosion control mat;
Square
2630
complete as specified
Yards
25.00
0.00
-25.00
$5.00
$125.00
Urban; Type A erosion
control mat; complete as
Square
2632
specified
Connect to existing storm
Yards
3,000.00
3,866.13
866.13
$1.50
$1,299.20
sewer main; complete as
2850
specified
Each
4.00
4.00
$550.00
Connect lateral to existing
storm sewer main; complete
2854
as specified
Each
4.00
4.00
$900.00
Furnish and install 8" sanitary
sewer (relay); complete as
Linear
3000
specified
Furnish and install 15"
Feet
510.00
525.90
15.90
$100.00
$1,590.00
sanitary sewer (relay);
Linear
3006
complete as specified
Furnish and install 15"
Feet
682.00
684.00
2.00
$160.00
$320.00
sanitary sewer (new);
Linear
3036
complete as specified
Furnish and install 8" sanitary
Feet
6.00
86.0104
87.00
1.00
$160.00
$160.00
sewer drop; complete as
Vertical
3060
specified
Feet
3.00
0.00
-3.00
$325.00
$975.00
Furnish and install standard
sanitary sewer manhole (4'
diameter);
complete as
Vertical
3100 specified
Feet
53.00
52.42
-0.58
$250.00
$145.00
Furnish and install external
sanitary
sewer manhole
chimney
seal; complete as
3114 specified
Furnish
and install external
Each
1.00
12.00
11.00
$500.00
$5,500.00
sanitary
sewer manhole
chimney
seal extension;
3116 complete
as specified
Each
1.00
0.00
-1.00
$400.00
$400.00
Furnish
and install internal
sanitary
sewer manhole
chimney
seal; complete as
3118 specified
Each
1.00 1
0.00
-1.00
$325.00
$325.00
Page 3 of 9
CONTRACT 17-12 CHANGE ORDER #2
Page 4 of 9
ITEM
NUMBER
DESCRIPTIONCONTRACT
UNIT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install internal
sanitary sewer manhole
chimney seal extension;
3120
complete as specified
Each
1.00
0.00
-1.00
$250.00
$250.00
Rebuild sanitary sewer
manhole (4' diameter);
Vertical
3136
complete as specified
Feet
7.00
6.75
-0.25
$420.00
$105.00
Furnish and install 8" x 6"
sanitary sewer factory wyes
or tees; complete as
3210
specified
Each
20.00
12.00
-8.00
$150.00
$1,200.00
Furnish and install 6" sanitary
sewer "Insert -A -Tee" or Xor-
N-Tee"; complete as
3222
specified
Each
3.00
3.00
$250.00
Furnish and install 4"/6"
sanitary sewer lateral (relay);
Linear
3234
complete as specified
Feet
41.00
134.00
93.00
$100.00
$9,300.00
Furnish and install 4"/6"
sanitary sewer riser (relay);
Linear
3235
complete as specified
Feet
5.00
15.00
10.00
$135.00
$1,350.00
Furnish and install sanitary
sewer lateral marker balls;
3236
complete as specified
Each
25.00
19.00
-6.00
$25.00
$150.00
Furnish and install clay
3238
dams; complete as specified
Each
1.00
3.00
2.00
$100.00
$200.00
Furnish and install
connection to existing 8"
3300
mains; complete as specified
Each
8.00
10.00
2.00
$600.00
$1,200.00
Furnish and install
connection to existing 10"
3302
mains; complete as specified
Each
1.00
1.00
$500.00
Furnish and install
connection to existing 15"
sanitary sewer mains;
3306
complete as specified
Each
1.00
1.00
$750.00
Core into existing manhole:
3332
complete as specified
Each
1.00
1.00
$3,000.00
Rock excavation; complete
Cubic
3600
as specified
Yards
50.00
0.00
-50.00
$0.01
$0.50
Closed circuit televising;
Linear
complete asspecified
Feet
1,278.00
1,296.90
18.90
$1.00
$18.90
r3700
Closed circuit televising -
using push camera; complete
3710
as specified
Each
5.00
22.00
17.00
$250.00
$4,250.00
Abandon 15" sanitary sewer;
Linear
3808 complete
asspecified
Feet
56.00
56.00
$12.50
Sanitary
sewer utility line
opening
(ULO); complete as
3890 specified
Each
2.00
2.00
$800.00
Furnish
and install 6" ductile
iron
water main (relay) with
polywrap;
complete as
Linear
4002 specified
Feet
322.00
296.50
-25.50
$125.00
$3,187.50
Furnish
and install 8" ductile
iron
water main (relay) with
polywrap;
complete as
Linear
4004 specified
Feet
995.00
985.50
9.50
$105.00
$997.50)
Page 4 of 9
CONTRACT 17-12 CHANGE ORDER #2
Page 5 of 9
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
ffiron
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
rnish and install 10" ductile
water main (relay) with
lywrap; complete as
Linear
4006
specified
Feet
2,164.00
2,148.50
-15.50
$110.00
$1,705.00
Furnish and install 12" ductile
iron water main (relay) with
polywrap; complete as
Linear
4008
specified
Feet
3,364.00
3,596.50
232.50
$85.00
$19,762.50
Furnish and install 1"water
service (relay); complete as
Linear
4036
specified
Feet
2,019.00
1,712.00
-307.00
$65.00
$19,955.00
Furnish and install 2" water
service (relay); complete as
Linear
4040
specified
Feet
22.00
10.50
-11.50
$75.00
$862.50
Furnish and install 1 "
corporation and stop box;
4048
complete as specified
Each
54.00
54.00
$850.00
Furnish and install 2"
corporation and stop box;
4053
complete as specified
Each
1.00
1.00
$1,650.00
Furnish and install water
service clay dams; complete
4055
as specified
Each
55.00
55.00
$100.00
Furnish and install
connections to existing 6"
water main; complete as
4058
specified
Each
14.00
14.00
$1,200.00
Furnish and install
connections to existing 8"
water main; complete as
4060
specified
Each
2.00
2.00
$1,750.00
Furnish and install
connections to existing 10"
water main; complete as
4062
specified
Each
4.00
4.00
$2,150.00
Furnish and install
connections to existing 12"
water main; complete as
4064
specified
Each
6.00
6.00
$2,900.00
Furnish and install 6" x 6"
water main tee; complete as
4101
specified
Each
1.00
1.00
$335.00
Furnish and install 8" x 6''
water main tee; complete as
4110 specified
Each
7.00
7.00
$400.00
Furnish and install 8" x 8"
water main tee; complete as
4111 specified
Each
1.00
1.00
$500.00
Furnish
and install 10" x 6"
water
main tee; complete as
4119 specified
Each
1.00
1.00
$600.00
Furnish
and install 10" x 8"
water
main tee; complete as
4120 specified
Each
4.00
4.00
$665.00
Furnish
and install 12" x 6"
water
main tee; complete as
4128 specified
Each
7.00
7.00
$740.00
Page 5 of 9
CONTRACT 17-12 CHANGE ORDER 42
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE /N
DECREASE IN
Furnish and install 8" 22-1/2
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install 12" x 8"
4228
water main tee; complete as
Each
1.00
1.00
$275.00
4129
specified
Each
1.00
1.00
$790.00
Furnish and install 12" x 12"
4229
water main tee; complete as
Each
4.00
2.00
-2.00
$290.00
$580.00
4131
specified
Each
1.00
1.00
$970.00
Furnish and install 6" x 6"
4236
water main cross; complete
Each
54.00
39.00
-15.00
$215.00
$3,225.00
4181
as specified
Each
1.00
1.00
$500.00
Furnish and install 10" x 12"
4237
water main cross; complete
Each
6.00
6.00
$275.00
4197
as specifiedEach
2.00
2.00
$1,130.00
Furnish and install 8" 11-1/4
4238
degree water main bend;
Each
7.00
5.00
-2.00
$395.00
$790.00
4914
emm�lotc �c rnonl4lo.�
�,.,.ti
Page 6 of 9
---
yCOO.VU
Furnish and install 8" 22-1/2
degree water main bend;
4228
complete as specified
Each
1.00
1.00
$275.00
Furnish and install 10" 22-1/2
degree water main bend;
4229
complete as specified
Each
4.00
2.00
-2.00
$290.00
$580.00
Furnish and install 6" 45
degree water main bend;
4236
complete as specified
Each
54.00
39.00
-15.00
$215.00
$3,225.00
Furnish and install 8" 45
degree water main bend;
4237
complete as specified
Each
6.00
6.00
$275.00
Furnish and install 10" 45
degree water main bend;
4238
complete as specified
Each
7.00
5.00
-2.00
$395.00
$790.00
Furnish and install 12" 45
degree water main bend;
4239
complete as specified
Each
14.00
8.00
-6.00
$595.00
$3,570.00
Furnish and install 10" water
main cap; complete as
4256
specifed
Each
1.00
1.00
$380.00
Furnish and install 12" water
main cap; complete as
4257
specifed
Each
1.00
1.00
$435.00
Furnish and install 8" x 6"
water main reducer; complete
4264
as specified
Each
11.00
11.00
$245.00
Furnish and install 10" x 8''
water main reducer; complete
4267
asspecified
Each
1.00
1.00
$315.00
Furnish and install 12" x 8''
water main reducer; complete
4270
as specified
Each
1.00
1.00
$435.00
Furnish and install 12" x 10"
water main reducer; complete
4271
as specified
Each
2.00
2.00
$475.00
Furnish and install 6" water
main gate valve; complete as
4401
specified
Each
20.00
20.00
$1,000.00
Furnish and install 8" water
main gate valve; complete as
4402
specified
Each
10.00
10.00
$1,300.00
Page 6 of 9
CONTRACT 17-12 CHANGE ORDER 42
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
DECREASE IN
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install 10" water
Removing pavement;
Square
main gate valve; complete as
complete as specified
Yards
142.00
138.90
-3.10
$8.15
4403
specified
Each
9.00
10.00
1.00
$1,850.00
7$21,290.00
Furnish and install 12" water
asphalt sidewalk and
main gate valve; complete as
driveway; complete as
4404
specified
Each
10.00
11.00
1.00
$2,290.00
$0.60
($74.28)
Furnish and install 12" x 8"
Unclassified excavation;
Cubic
tapping valve and sleeve;
complete as specified
Yards
112.00
0.00
-112.00
$14.30
4447
complete asspecified
Each
1.00
1.00
$4,500.00
Furnish and install hydrant;
removal and replacement;
4500
complete as specified
Each
15.00
15.00
$3,400.00
Abandon water main on West
Murdock Avenue; complete
Lump
4900
as specified
Sum
1.00
1.00
$6,700.00
1-1318
Abandon water main on
Yards
1320.00
1244.70
-75.30
$55.60
($4,186.68)
Oshkosh Avenue; complete
Lump
4902
as specified
Sum
1.00
1.00
$2,100.00
Adjust manholes and inlets;
Abandon water main on West
1-1360
complete as specified
6th Avenue; complete as
Lump
7.00
-1.00
$210.00
($210.00)
4904
specified
Sum
1.00
1.00
$1,900.00
and grading; complete as
Remove water main;
Linear
1-1410
specified
4920
complete as specified
Feet
76.00
50.00 1
$9.50
-26.00 1
$43.00
$1,118.00
Excavation special (water);
6" CABC and grading;
4990
complete as specified
Tons
318.00
0.00 :t:�-318.00
1
$15.00
1-1442
$4,770.00)
SUBTOTAL - (BID ITEMS 1100 - 4990) $224,598.44 ($133,020.40)
ADDITIONAL WORK REQUIRED: CO #1 (W PACKER AVENUE)
ITEM
NUMBER
DESCRIPTIONUNIT
BID
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Removing pavement;
Square
1-1100
complete as specified
Yards
142.00
138.90
-3.10
$8.15
($25.27)
Removing concrete and
asphalt sidewalk and
driveway; complete as
1-1120
specified
395.00
271.20
-123.80
$0.60
($74.28)
Unclassified excavation;
Cubic
1-1200
complete as specified
Yards
112.00
0.00
-112.00
$14.30
($1,601.60)
8" concrete pavement
removal and replacement;
including sawing; pavement
ties; integral curb and find
grading; turf restoration; and
traffic control; complete as
Square
1-1318
specified
Yards
1320.00
1244.70
-75.30
$55.60
($4,186.68)
Pavement ties; complete as
1-1350
specifed
Each
45.00
45.00
$9.00
Adjust manholes and inlets;
1-1360
complete as specified
Each
8.00
7.00
-1.00
$210.00
($210.00)
12" radius curb with 6" CABC
and grading; complete as
Linear
1-1410
specified
Feet
65.00
244.80
179.80
$9.50
$1,708.10
30" curb and gutter; 8"; with
6" CABC and grading;
Linear
1-1442
complete as specified
Feet
10.00
16.00
6.00
$23.75
$142.50
Sidewalk curb; complete as
Linear
1-1460
specified I
Feet 1
15.00 1
15.00
$25.00
Page 7 of 9
CONTRACT 17-12 CHANGE ORDER #2
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE /N
CONTRACT PRICE
Feet
6" concrete sidewalk/
130.50
-999.50
$3.07
Base aggregate dense; 3/4";
driveway/ramp with 3" CABC
1-1800
complete as specified
Tons
215.00
44.00
-171.00
and grading; complete as
Square
Tack coat; complete as
1-1510
specified
Feet
355.00
192.70
-162.30
$5.70
($925.11)
Square
Curb ramp detectable
1-1918
paving; complete as specified
Yards
145.00
0.00
warning field (natural/non-
-145.00
$15.00
4" asphaltic surface MT with
painted); complete as
Square
8" concrete base course;
Square
1-1540
specified
Feet
8.00
8.00
-6.10
$30.60
Furnish and install 12" storm
Drilled No. 4 sidewalk tie bars
1-2003
sewer; complete as specified
Feet
- deformed; epoxy -coated;
41.00
3.00
$60.00
Furnish; install; maintain; and
1-1560 complete as specified
Each
8.00
6.00
-2.00
$5.10
Sawing existing pavement;
Linear
protection; complete as
1
1
1 ($10.20)
1-1700 complete as specified
Feet
11.50
10.30
Each
-1.20 1
$2.30
($2.76)
Page 8 of 9
068.4
274.3
175.
SIN
$2,030.60 ($18,626.17)
full depth; complete as
Linear
1-1710
specified
Feet
1130.00
130.50
-999.50
$3.07
Base aggregate dense; 3/4";
1-1800
complete as specified
Tons
215.00
44.00
-171.00
$13.30
Tack coat; complete as
1-1900
specified
Gallons
10.00
10.00
$7.00
Asphaltic cold weather
Square
1-1918
paving; complete as specified
Yards
145.00
0.00
-145.00
$15.00
4" asphaltic surface MT with
8" concrete base course;
Square
1-1920
complete as specified
Yards
145.00
138.90
-6.10
$75.00
Furnish and install 12" storm
Linear
1-2003
sewer; complete as specified
Feet
38.00
41.00
3.00
$60.00
Furnish; install; maintain; and
remove Type D modified inlet
protection; complete as
1-2508
specified
Each
9.00
5.00
-4.00
$75.00
Sediment removal - Type D
modified inlet protection;
1-2510
complete as specified
Each
9.00
5.00
-4.00
$5.00
Furnish; install; maintain; and
remove stone bag; complete
1-2516
as specified
Each
9.00
0.00
-9.00
$5.00
Abandon 15" and larger
storm sewer; complete as
Linear
1-2802
specified
Feet
325.00
195.00
-130.00
$25.00
Remove storm sewer
manholes and inlets;
1-2812
complete as specified
Each
1.00
1.00
$550.00
Connect to existing storm
sewer main; complete as
1-2850
specified
Each
2.00
2.00
$550.00
Connect to existing storm
sewer manhole; complete as
1-2856
specified
Each
1.00
1.00
$1,300.00
Furnish and install external
sanitary sewer manhole
chimney seal; complete as
1-3114
specified
Each
2.00
2.00
$500.00
ADDITIONAL WORK: CO #1 (ITEMS 1-1100 - 1-3114) - SUBTOTAL
ADDITIONAL WORK REQUIRED: CO #2
Page 8 of 9
068.4
274.3
175.
SIN
$2,030.60 ($18,626.17)
CONTRACT 17-12 CHANGE ORDER #2
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
ITEM
NUMBER
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Remove and replace core
2-10000
holes; complete as specified
Each
0.00
12.00
12.00
$100.00
$1,200.00
Pour in place manhole;
Lump
2-20000
complete asspecified
Sum
0.00
1.00
1.00
$3,612.59
$3,612.59
Remove and relay 21 "
concrete storm sewer;
Lump
2-20001
complete asspecified
Sum
0.00
1.00
1.00
$4,326.00
$4,326.00
24" storm sewer remove and
replace with connection;
Lump
2-20002
complete as specified
Sum
0.00
1.00
1.00
$988.36
$988.36
Remove railroad track;
Linear
2-30000
complete as specified
Feet
0.00
415.00
415.00
$5.56
$2,307.40
Sanitary lateral investigation;
Lump
2-30001
complete as specified
Sum
0.00
1.00
1.00
$980.43
$980.43
Furnish and install 10 x 8
2-40000
cross; complete as specified
Each
0.00
1.00
1.00
$850.00
$850.00
Furnish and install 12 x 12
2-40001
cross; complete as specified
Each
0.00
1.00
1.00
$1,200.00
$1,200.00
TM water shutoff downtime;
Lump
2-40002
complete as specified
Sum
0.00
1.00
1.00
$3,822.50
$3,822.50
15" CMP culvert; complete as
Linear
2-40003
specified
Feet
0.00
34.00
34.00
$39.00
$1,326.00
15" CMP endwalls; complete
2-40004
as specified
Each
0.00
2.00
2.00
$175.00
$350.00
24" CMP culvert; complete as
Linear
2-40005
specified
Feet
0.00
24.00
24.00
$45.00
$1,080.00
24" CMP endwalls; complete
2-40006
as specified
Each
0.00
2.00
2.00
$225.00
$450.00
22 x 28 CMP culvert;
Linear
2-40007
complete as specified
Feet
0.00
34.00
34.00
$46.00
$1,564.00
22 x 28 CMP endwalls;
2-40008
complete as specified I
Each
0.00
2.00
2.00
$235.00
$470.00
ADDITIONAL WORK: CO #2 - (BID ITEMS 2-10000 - 2-40008) - SUBTOTAL $24,527.28 $0.00
NET INCREASE TO: SECTION 1 $99,509.75
NET INCREASE TO SECTION 1 $251,156.32
NET DECREASE TO SECTION 1 ($151,646.57)
NET INCREASE TO CONTRACT: $99,509.75
Page 9 of 9