Loading...
HomeMy WebLinkAbout0104380 BOSHKOSH ON THE WATER .lob .Address 842 OAK ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner GERALD A/MARY E SCHUHART Contractor OWNER Category 111 - Single Family Addition No 104380 Create Date 09/24/2003 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Constructing a 14' x 18' sunroom on the rear of the house. The room will be insulated in the walls ceiling and floor to accomadate future of Work heating of the room. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $9,000.00 Plan Approval $0.00 Permit Fee Paid $60.00 Park Dedication $0.00 Date 09/24/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 842 OAKST OSHKOSH WI 54901 - 4064 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. OSHI~OSH ON THE WATER Job Addrees 842 OAK ST Designer Category 111 ~ Single Family Addition Type · Building (~ Sign Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Finished/Living 0 Sq. Ft. Bedrooms 0 Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete (~ Floating Slab (~ Pier ~) Other O Concrete Block O Post ~) Treated Wood Occupancy Permit Flood Plain Park Dedication # Dwelling Units 0 CITY OF OSHKOSH No 104380 BUILDING PERMIT - APPLICATION AND RECORD Owner GERALD NMARY E SCHUHART Create Date 09/24/2003 Contractor OWNER Plan Canopy (~ Fence (~ Raze Height Stories 0 Ft. Size [] Projection J Canopies 0 Signs 0 Height Permit # Structures Use/Nature ~FR/Constructing a 14' x t 8' sunroom on the rear of the house. The room will be insulated in the walls ceiling and floor to accomadate of Work cture heating of the room. HVAC Contractor Electric Contractor Fees: Valuation Issued By: $9,000.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided J Plumbing Contractor $60.00 Park Dedication $0.00 Date 09/24/2003 Final/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rul~s governing the described construction. While the City of Oshkceh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit a@plication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ~y necessary app. mv...~s b~re starting-.~uch activity. S,gnature ~...?'.,.~...¢~¢'-~ ~;~;~/.~?'L~ Date ~X, 7 L_. t Agent/Owner Address 842 OAK ST OSHKOSH WI 5490'1 - 4064 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.