HomeMy WebLinkAbout0104405-Building (overhead door)OSHKOSH
ON THE WATER
.lob Address 3300 MEDALIST DR
Designer James Tschampl
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner SMET INVESTMENTS LLC
Contractor SMET CONSTRUCTION SERVICES
Category 211 - Alteration Industrial
No 104405
Create Date 09/24/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature IND/Cut in 12' x 12' O.H. Door in the North elevation of the building as per calcs provided. AFTER THE FACT PERMIT
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$7,500.00 Plan Approval $0.00 Permit Fee Paid
$155.00 Park Dedication $0.00
Date 09/25/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 3148 MID VALLEY DR DEPERE WI 54115 - 0000 Telephone Number 920-532-3828
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
OSHKOSH
ON THE WATER
Job Address 3300 MEDALIST DR
CITY OF OSHKOSH No '104405
BUILDING PERMIT - APPLICATION AND RECORD
Owner SMET iNVESTMENTS LLC Create Date 09/24/2003
Designer James Tschempl
Contractor SMET CONSTRUCTION SERVICES
Category 211 - Alteration Industrial
Type · Building (~ Sign (~ Canopy O Fence (~ Raze
Plan
Zoning Class of Const:
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories
Garage 0 Sq. Ft. Baths 0
Foundation · Poured Concrete (~ Floating Slab (~ Pier (~ Other
(~ Concrete Block (~ Post (~ Treated Wood
Occupancy Permit Not Required Flood Plain No
Park Dedication Not Required # Dwelling Units 0
0 Ft.
Size
[~. _P_rojection
Canopies
Signs
Height Permit Not Required
# Structures 0
Use/Nature lND/~-uT~r~¥~0~.H~DoorintheNorthelevationofthebuildingaspercalcsprovided. AFTER THE FACT PERMIT
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$7,500.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid $155.00 Park Dedication $0.00
Date 09/25/2003 Final/O.P. 00/00/0000
[] Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary appr~'c'~s before starting such activity.
Signature ..~.~---~'~ ~ ~,-"~. ~/'/ Date ~
AgentJOwner
Address 3148 MID VALLEY DR DEPERE WI 54115 -0000 TelephooeNumber 920-532-3828
To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number. Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.