Loading...
HomeMy WebLinkAbout0104405-Building (overhead door)OSHKOSH ON THE WATER .lob Address 3300 MEDALIST DR Designer James Tschampl CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner SMET INVESTMENTS LLC Contractor SMET CONSTRUCTION SERVICES Category 211 - Alteration Industrial No 104405 Create Date 09/24/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature IND/Cut in 12' x 12' O.H. Door in the North elevation of the building as per calcs provided. AFTER THE FACT PERMIT of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $7,500.00 Plan Approval $0.00 Permit Fee Paid $155.00 Park Dedication $0.00 Date 09/25/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 3148 MID VALLEY DR DEPERE WI 54115 - 0000 Telephone Number 920-532-3828 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. OSHKOSH ON THE WATER Job Address 3300 MEDALIST DR CITY OF OSHKOSH No '104405 BUILDING PERMIT - APPLICATION AND RECORD Owner SMET iNVESTMENTS LLC Create Date 09/24/2003 Designer James Tschempl Contractor SMET CONSTRUCTION SERVICES Category 211 - Alteration Industrial Type · Building (~ Sign (~ Canopy O Fence (~ Raze Plan Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain No Park Dedication Not Required # Dwelling Units 0 0 Ft. Size [~. _P_rojection Canopies Signs Height Permit Not Required # Structures 0 Use/Nature lND/~-uT~r~¥~0~.H~DoorintheNorthelevationofthebuildingaspercalcsprovided. AFTER THE FACT PERMIT of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: ~ $7,500.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $155.00 Park Dedication $0.00 Date 09/25/2003 Final/O.P. 00/00/0000 [] Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary appr~'c'~s before starting such activity. Signature ..~.~---~'~ ~ ~,-"~. ~/'/ Date ~ AgentJOwner Address 3148 MID VALLEY DR DEPERE WI 54115 -0000 TelephooeNumber 920-532-3828 To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number. Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.