HomeMy WebLinkAbout35. 18-56 JANUARY 23, 2018 18-56 RESOLUTION (CARRIED 4-3 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 17-03 MARY JEWELL LIFT STATION & PARK SHELTER (+$112,427.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: MIRON CONSTRUCTION CO., INC. PO Box 509 Neenah, WI 54957-0509 Net Increase to contract: $112,427.00 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 551-1910-1799-00000 Sewer Utility- Construction in Progress r,A City of Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: James Rabe, Director of Public Works 3ZZ4 ( DATE: January 18, 2018 RE: Change Order No. 1 for Public Works Contract No. 17-03 Mary Jewell Lift Station and Park Shelter Miron Construction Co., Inc. (+$112,427) BACKGROUND Change Order No. 1 for Contract 17-03 is scheduled for consideration by the Common Council at the January 23, 2018 meeting. The contract was originally awarded to Miron Construction Co., Inc. in October of 2017. At the December 9, 2017 Common Council meeting, the Common Council approved the architectural design of the building, including several enhancements requested by the Plan Commission. Those architectural enhancements included the addition of grass pavers, addition of five (5) dormers and increasing the size of a previously -included dormer, addition of horizontal bands of rock veneer and sills, addition of rock veneer and sill around twelve (12) support posts, reduction of the roof line height by twenty four inches (24"), and the additional of wood siding to the gable ends. In the memo included with the architectural design approval resolution, these additional costs were identified. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Public Infrastructure Improvements -Wastewater Utility - Additional architectural enhancements to the exterior of the lift station and park shelter. FISCAL IMPACT CIP Section Change Order Amount New Contract Total CIP Funds Budgeted Public Infrastructure Improvements - Wastewater Utility $112,427.00 $2,918,831.00 $4,356,100.00 Park Improvements $0.00 $175,000.00 $175,000.00 Total $112,427.00 $3,093,831.00 $4,531,100.00 Adequate funds are available in the relating sections of the 2017 Capital Improvement Budget. 1:\ Engineering \2017 CONTRACTS \ 17-03 Oshkosh Ave Page 1 of 2 Swr \ Project_lnformation \ Correspondence \ Memo \ 17-03 Memo for CO p11-18-18.docx RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 17-03 in the amount of +$112,427 to Miron Construction Co., Inc. Approved: Mark A. Rohloff City Manager JER/tlt L\ Engineering \ 2017 CONTRACTS \ 17-03 Oshkosh Ave page 2 Of 2 Swr\Project_Information\Correspondence\Memo\17-03 Memo for CO A1_1-18-18.docx TO: MIRON CONSTRUCTION CO. PO BOX 509 NEENAH, WI 54957-0509 CHANGE ORDER #1 DATE: JANUARY 9, 2018 Your present contract with the City of Oshkosh, Contract No. 17-03, awarded October 24, 2017, is hereby amended and changed as follows: NET INCREASE TO: CONTRACT NET INCREASE TO CONTRACT BID TOTAL CO #1 CONTRACT TOTAL CITY OF OSHKOSH BY: $112,427.00 $112,427.00 CONTRACT TOTALS $2,981,403.60 $2,981,403.60 $112,427.00 $112,427.00 $3,093,830.60 $3,093,830.60 City Manager City Clerk pproved and acc ted: Contractor David G. Voss Jr., President I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT 17-03 CHANGE ORDER #1 ADDITIONAL WORK REQUIRED: CO #1 ITEM DESCRIPTION UNIT CONTRACT ADDITIONAL NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY WORK INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Revise roof dormers from one (1) to six (6) and increase size of dormers, Lump 1-10001 com fete asspecified Sum 0.00 1.00 1.00 $19,509.00 $19,509.00 Replace Split Face Concrete Masonry Unit (CMU) with stone veneer, complete as Lump 1-10002 specified Sum 0.00 1.00 1.00 $25,368.00 $25,368.00 Increase height of stone veneer, replacing cement board siding, complete as Lump 1-10003 specified Sum 0.00 1.00 1.00 $28,994.00 $28,994.00 Add stone veneer and sill to wood posts, complete as Lump 1-10004 specified Sum 0.00 1.00 1.00 $22,781.00 $22,781.00 Revise roof trusses to lower roof approximately two feet Lump 1-10005 (2'), complete asspecified Sum 0.00 1.00 1.00 $13,312.00 $13,312.00 Replace cement board siding on gabled building ends with wood, complete as specified Lump 1-10006 Sum 0.00 1.00 1.00 $2,463.00 $2,463.00 ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1-10001 - 1-10006) - SUBTOTAL $112,427.00 $0.00 NET INCREASE TO: CONTRACT $112,427.00 $0.00 NET INCREASE TO CONTRACT $112,427.00 NET DECREASE TO CONTRACT $0.00 NET INCREASE TO CONTRACT: $112,427.00 Page 1 of 1