HomeMy WebLinkAbout11. 18-32 JANUARY 23, 2018 18-32 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE CHANGE ORDER NO. 2 FOR PUBLIC WORKS
CONTRACT NO. 17-12 MISCELLANEOUS UTILITY
IMPROVEMENTS (+$99,509.75)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
DORNER, INC.
E506 Luxemburg Road
Luxemburg, WI 54217
Net Increase to contract: $99,509.75
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. Nos. 311-0410-7480-00000 Sidewalk Construction Fund
317-0410-7480-03304 Special Assessment Fund — Sidewalks
315-0410-7480-00000 Street Improvement Fund — Streets
541-1810-1799-00000 Water Utility— Construction in Progress
317-0410-7480-03303 Special Assessments Fund —Water
551-1910-1799-00000 Sewer Utility— Construction in Progress
317-0410-7480-03302 Special Assessments Fund — Sewer
561-2010-1799-00000 Storm Utility— Construction in Progress
317-0410-7480-03305 Special Assessments Fund — Storm Water
r,A
City
of
Oshkosh
iLVA 111LVA1MAL411181
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works 9"3
DATE: January 18, 2018
RE: Change Order No. 2 for Public Works Contract No. 17-12
Miscellaneous Utility Improvements / Dorner, Inc. (+$99,509.75)
BACKGROUND
Change Order No. 2 for Contract 17-12 is scheduled for consideration by the Common Council at the January 23,
2018 meeting. The contract was originally awarded to Dorner, Inc. in June of 2017 and Change Order No. 1 was
approved by the Common Council in September of 2017. This change order covers additional services that were
required which were outside of the original scope of services for the contract.
ANALYSIS
Following is a summary of the scope revisions for each section of the Capital Improvements Program (CIP):
• Streets — Final quantities adjusted to match field conditions.
• Storm — Final quantities adjusted to match field conditions.
• Sanitary — Final quantities adjusted to match field conditions and additional costs associated with High
Early Strength concrete pavement restoration on Oshkosh Avenue.
• Water Main — Final quantities adjusted to match field conditions and additional pavement restoration areas
and costs on West 6th Avenue and West Murdock Avenue.
FISCAL IMPACT
Contract Section
Change Order Amount
New Contract Total
CIP Budget Amount
Streets
-$21,958.06
$136,748.99
$185,000.00
Storm Sewer
-$25,798.65
$31,284.35
$65,000.00
Sanitary Sewer
$40,521.00
$438,912.00
$500,000.00
Water Main
$106,745.46
$1,587,233.61
$2,467,700.00
Total
$99,509.751
$2,194,178.95
$3,217,700.00
Funding for this change order is available within the corresponding sections of the 2017 CIP.
RECOMMENDATIONS
I recommend approval of Change Order No. 2 to Contact No. 17-12 in the amount of +$99,509.75 to Dorner, Inc.
Approved:
Mar A. Rohloff
City Manager
SMG/tlt
L\ Engineering\ 2017 CONTRACTS \ 17-12 W tr Mn
Relays\ Project_Information\ Correspondence \ Memo \ 17-12 Memo for CO A2_1-18-18.docx
Page 1 of 1
TO: DORNER INC.
E506 LUXEMBURG ROAD
LUXEMBURG, WI 54217
CHANGE ORDER #2
DATE: JANUARY 11, 2017
Your present contract with the City of Oshkosh, Contract No. 17-12, awarded June 13, 2017, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION 1 $251,156.32
NET DECREASE TO: SECTION 1 ($151,646.57)
NET INCREASE TO CONTRACT $99,509.75
TOTALS
BID TOTAL $1,978,062.15 $1,978,062.15
CO #1 $116,607.05 $116,607.05
PREVIOUS CONTRACT $2,094,669.20 $2,094,669.20
CO #2 $99,509.75 $99,509.75
CONTRACT TOTAL $2,194,178.95 $2,194,178.95
CITY OF OSHKOSH
a-io
City Manager
City Clerk
Jproved a a epted:
�J
ontractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the
within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT 17-12 CHANGE ORDER #2
17-12 MISCELLANEOUS UTILITY IMPROVEMENTS
ITEM
DESCRIPTIONUNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Removing pavement;
Square
1100
complete asspecified
Yards
911.00
1,187.32
276.32
$8.15
$2,252.01
Removing curb & gutter;
Linear
1110
complete as specified
Feet
145.00
465.54
320.54
$5.10
$1,634.75
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
1120
specified
Feet
7,770.00
7,551.39
-218.61
$0.60
($131.17)
Unclassified excavation;
Cubic
1200
complete asspecified
Yards
786.00
0.00
-786.00
$14.30
($11,239.80)
7" concrete pavement
removal and replacement;
including sawing; pavement
ties; integral curb and fine
grading; turf restoration; and
traffic control; complete as
Square
1308
specified
Yards
781.00
1,272.97
491.97
$62.75
$30,871.12
7" concrete pavement HES
removal and replacement;
including sawing; pavement
ties; integral curb and fine
grading; turf restoration; and
traffic control; complete as
Square
1309
specified
Yards
75.00
0.00
-75.00
$68.85
($5,163.75)
8" concrete pavement
removal and replacement;
including sawing; pavement
ties; integral curb and fine
grading; turf restoration; and
traffic control; complete as
Square
1318 Ispecified
Yards
7,305.00
6,825.58
-479.42
$55.60
($26,655.75)
8" concrete pavement HES
removal and replacement;
including sawing; pavement
ties; integral curb and fine
grading; turf restoration; and
traffic control; complete as
Square
1319
specified
Yards
75.00
756.81
681.81
$61.70
$42,067.70
Adjust manholes and inlets;
1360
complete asspecified
Each
36.00
34.00
-2.00
$210.00
($420.00)
Turf restoration on West
Murdock Avenue; complete
Square
1370A
as specified
Yards
387.00
451.00
64.00
$8.15
$521.60
Turf restoration on Clairville
Square
1370B
Road; complete as specified
Yards
1,814.00
0.00
-1,814.00
$8.15
($14,784.10)
Turf restoration on Oshkosh
Avenue; complete as
Square
1370C
specified
Yards
65.00
108.79
43.79
$8.15
$356.89
Turf restoration on West 6th
Avenue; complete as
Square
1370D
specified
Yards
298.00
309.50
11.50
$8.15
$93.73
Restore gravel driveway/
Square
1372
apron; complete asspecified
Yards
261.00
238.89
-22.11
$4.10
($90.65)
30" curb and gutter, 8"; with
6" CABC and grading;
Linear
1442
complete as specified
Feet
150.00
1,071.00
921.00
$23.75
$21,873.75
Page 1 of 9
CONTRACT 17-12 CHANGE ORDER #2
ITEM
NUMBER
DESCRIPTIONUNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
4" concrete sidewalk with 3"
CABC and grading; complete
Square
1500
as specified
Feet
5,120.00
4,227.81
-892.19
$5.00
($4,460.95)
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
Square
1510
specified
Feet
576.00
1,433.58
857.58
$5.70
$4,888.21
Curb ramp detectable
warning field (natural/non-
painted); complete as
Square
1540
specified
Feet
96.00
64.00
-32.00
$30.60
($979,20)
No. 4 reinforcing rods -
deformed; epoxy -coated;
Linear
1550
complete as specified
Feet
2,277.00
1,670.45
-606.55
$0.60
($363.93)
Drilled No. 4 sidewalk tie bars
- deformed; epoxy -coated;
1560
complete as specified
Each
220.00
272.00
52.00
$5.10
$265.20
Sawing existing pavement;
Linear
1700
complete asspecified
Feet
2,110.00
2,141.74
31.74
$2.30
$73.00
Tack coat; complete as
1900
specified
Gallons
68.00
0.00
-68.00
$7.00
($476.00)
5" asphaltic pavement with
10" CABC and grading;
Square
1905
complete as specified
Yards
580.00
684.57
104.57
$37.50
$3,921.38
4" asphaltic pavement with
10" CABC and grading;
Square
1911
complete as specified
Yards
366.00
522.53
156.53
$37.15
$5,815.09
4" asphaltic pavement with 6"
CABC and grading; complete
Square
1916
as specified
Yards
228.00
197.50
-30.50
$36.20
($1,104.10)
Furnish and install 15" storm
Linear
2006
sewer; complete as specified
Feet
25.00
19.90
-5.10
$115.00
$586.50
Reconstruct 4' diameter
storm sewer manhole;
Vertical
2246
complete as specified
Feet
5.00
0.00
-5.00
$500.00
$2,500.00
Rebuild 6'x 6' storm sewer
box manhole; complete as
Vertical
2283
specified
Feet
21.00
1.82
-19.18
$825.00
$15,823.50
Furnish and install 6" storm
sewer lateral; complete as
Linear
2400
specified
Feet
142.00
116.00
-26.00
$45.00
$1,170.00
Furnish and install storm
sewer marker balls; complete
2404
as specified
Each
8.00
12.00
4.00
$25.00
$100.00
Furnish and install storm
sewer clay dams; complete
2406
asspecified
Each
4.00
4.00
$100.00
Furnish and install storm
sewer lateral inlet; complete
2408
as specified
Each
3.00
3.00
$400.00
Furnish; install; maintain; and
remove Type D modified inlet
protection; complete as
2508
specified
Each
72.00
48.00
-24.00
$75.00
$1,800.00
Sediment removal - Type D
modified inlet protection;
2510
complete asspecified
Each
72.00
0.00 1
-72.00 1
$5.00 1
$360.00)
Page 2 of 9
CONTRACT 17-12 CHANGE ORDER #2
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish; install; maintain; and
remove stone bag; complete
2516
as specified
Each
15.00
10.00
-5.00
$5.00
$25.00
Furnish; install; maintain; and
remove 12" diameter
sediment logs; complete as
Linear
2518
specified
Feet
60.00
85.00
25.00
$5.00
$125.00
Furnish; install; maintain; and
remove ditch check;
2522
complete as specified
Each
21.00
18.00
-3.00
$150.00
$450.00
Install salvaged topsoil 6"
Square
2602
depth; complete as specified
Yards
25.00
3,866.13
3,841.13
$15.00
$57,616.95
Furnish and install native
seeding; complete as
Square
2610
specified
Yards
3,000.00
3,866.13
1 866.13
$3.50
$3,031.46
Furnish and install Class I;
Type A erosion control mat;
Square
2630
complete as specified
Yards
25.00
0.00
-25.00
$5.00
$125.00
Urban; Type A erosion
control mat; complete as
Square
2632
specified
Yards
3,000.00
3,866.13
866.13
$1.50
$1,299.20
Connect to existing storm
sewer main; complete as
2850
specified
Each
4.00
4.00
$550.00
Connect lateral to existing
storm sewer main; complete
2854
as specified
Each
4.00
4.00
$900.00
Furnish and install 8" sanitary
sewer (relay); complete as
Linear
3000
specified
Feet
510.00
525.90
15.90
$100.00
$1,590.00
Furnish and install 15"
sanitary sewer (relay);
Linear
3006
complete as specified
Feet
682.00
684.00
2.00
$160.00
$320.00
Furnish and install 15"
sanitary sewer (new);
Linear
3036
complete as specified
Feet
86.00
87.00
1.00
$160.00
$160.00
Furnish and install 8" sanitary
sewer drop; complete as
Vertical
3060
specified
Feet
3.00
0.00
-3.00
$325.00
$975.00
Furnish and install standard
sanitary sewer manhole (4'
diameter); complete as
Vertical
3100
specified
Feet
53.00
52.42
-0.58
$250.00
$145.00
Furnish and install external
sanitary sewer manhole
chimney seal; complete as
3114
specified
Each
1.00
12.00
11.00
$500.00
$5,500.00
Furnish and install external
sanitary sewer manhole
chimney seal extension;
3116
complete as specified
Each
1.00
0.00
-1.00
$400.00
$400.00
Furnish and install internal
sanitary sewer manhole
chimney seal; complete as
3118
specified
Each
1.00
0.00
-1.00
$325.00
$325.00
Page 3 of 9
CONTRACT 17-12 CHANGE ORDER #2
ITEM
NUMBER
DESCRIPTIONUNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install internal
sanitary sewer manhole
chimney seal extension;
3120
complete as specified
Each
1.00
0.00
-1.00
$250.00
$250.00
Rebuild sanitary sewer
manhole (4' diameter);
Vertical
3136
complete as specified
Feet
7.00
6.75
-0.25
$420.00
$105.00
Furnish and install 8" x 6"
sanitary sewer factory wyes
or tees; complete as
3210
specified
Each
20.00
12.00
-8.00
$150.00
$1,200.00
Furnish and install 6" sanitary
sewer "Insert -A -Tee" or Xor-
N-Tee"; complete as
3222
specified
Each
3.00
3.00
$250.00
Furnish and install 4"/6"
sanitary sewer lateral (relay);
Linear
3234
complete asspecified
Feet
41.00
134.00
93.00
$100.00
$9,300.00
Furnish and install 4"/6"
sanitary sewer riser (relay);
Linear
3235
complete as specified
Feet
5.00
15.00
10.00
$135.00
$1,350.00
Furnish and install sanitary
sewer lateral marker balls;
3236
complete as specified
Each
25.00
19.00
-6.00
$25.00
$150.00
Furnish and install clay
3238
dams; complete as specified
Each
1.00
3.00
2.00
$100.00
$200.00
Furnish and install
connection to existing 8"
3300
mains; complete as specified
Each
8.00
10.00
2.00
$600.00
$1,200.00
Furnish and install
connection to existing 10"
3302
mains; complete as specified
Each
1.00
1.00
$500.00
Furnish and install
connection to existing 15"
sanitary sewer mains;
3306
complete as specified
Each
1.00
1.00
$750.00
Core into existing manhole:
3332
complete as specified
Each
1.00
1.00
$3,000.00
Rock excavation; complete
Cubic
3600
asspecified
Yards
50.00
0.00
-50.00
$0.01
$0.50
Closed circuit televising;
Linear
3700
complete as specified
Feet
1,278.00
1,296.90
18.90
$1.00
$18.90
Closed circuit televising -
using push camera; complete
3710
asspecified
Each
5.00
22.00
17.00
$250.00
$4,250.00
Abandon 15" sanitary sewer;
Linear
3808
complete asspecified
Feet
56.00
56.00
$12.50
Sanitary sewer utility line
opening (ULO); complete as
3890
specified
Each
2.00
2.00
$800.00
Furnish and install 6" ductile
iron water main (relay) with
polywrap; complete as
Linear
4002
specified
Feet
322.00
296.50
-25.50
$125.00
$3,187.50
Furnish and install 8" ductile
iron
water main (relay) with
polywrap; complete as
Linear
4004
specified
Feet
995.00 1
985.50
-9.50 1
$105.00
$997.50
Page 4 of 9
CONTRACT 17-12 CHANGE ORDER #2
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install 10" ductile
iron water main (relay) with
polywrap; complete as
Linear
4006
specified
Feet
2,164.00
2,148.50
-15.50
$110.00
$1,705.00
Furnish and install 12" ductile
iron water main (relay) with
polywrap; complete as
Linear
4008
specified
Feet
3,364.00
3,596.50
232.50
$85.00
$19,762.50
Furnish and install 1" water
service (relay); complete as
Linear
4036
specified
Feet
2,019.00
1,712.00
-307.00
$65.00
$19,955.00
Furnish and install 2" water
service (relay); complete as
Linear
4040
specified
Feet
22.00
10.50
-11.50
$75.00
$862.50
Furnish and install 1"
corporation and stop box;
4048
complete as specified
Each
54.00
54.00
$850.00
Furnish and install 2"
corporation and stop box;
4053
complete asspecified
Each
1.00
1.00
$1,650.00
Furnish and install water
service clay dams; complete
4055
as specified
Each
55.00
55.00
$100.00
Furnish and install
connections to existing 6"
water main; complete as
4058
specified
Each
14.00
14.00
$1,200.00
Furnish and install
connections to existing 8"
water main; complete as
4060
specified
Each
2.00
2.00
$1,750.00
Furnish and install
connections to existing 10"
water main; complete as
4062
specified
Each
4.00
4.00
$2,150.00
Furnish and install
connections to existing 12"
water main; complete as
4064
specified
Each
6.00
6.00
$2,900.00
Furnish and install 6" x 6"
water main tee; complete as
4101
specified
Each
1.00
1.00
$335.00
Furnish and install 8" x 6"
water main tee; complete as
4110
specified
Each
7.00
7.00
$400.00
Furnish and install 8" x 8"
water main tee; complete as
4111
specified
Each
1.00
1.00
$500.00
Furnish and install 10" x 6"
water main tee; complete as
4119
specified
Each
1.00
1.00
$600.00
Furnish and install 10" x 8"
water main tee; complete as
4120
specified
Each
4.00
4.00
$665.00
Furnish and install 12" x 6"
water main tee; complete as
4128
specified
Each
7.00
7.00
$740.00
Page 5 of 9
CONTRACT 17-12 CHANGE ORDER #2
ITEM
DESCRIPTIONUNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install 12" x 8"
water main tee; complete as
4129
specified
Each
1.00
1.00
$790.00
Furnish and install 12" x 12"
water main tee; complete as
4131
specified
Each
1.00
1.00
$970.00
Furnish and install 6" x 6"
water main cross; complete
4181
as specified
Each
1.00
1.00
$500.00
Furnish and install 10" x 12"
water main cross; complete
4197
as specified
Each
2.00
2.00
$1,130.00
Furnish and install 8" 11-1/4
degree water main bend;
4219
complete as specified
Each
1.00
1.00
$265.00
Furnish and install 8" 22-1/2
degree water main bend;
4228
complete as specified
Each
1.00
1.00
$275.00
Furnish and install 10" 22-1/2
degree water main bend;
4229
complete asspecified
Each
4.00
2.00
-2.00
$290.00
$580.00
Furnish and install 6" 45
degree water main bend;
4236
complete as specified
Each
54.00
39.00
-15.00
$215.00
$3,225.00
Furnish and install 8" 45
degree water main bend;
4237
complete as specified
Each
6.00
6.00
$275.00
Furnish and install 10" 45
degree water main bend;
4238
complete as specified
Each
7.00
5.00
-2.00
$395.00
$790.00
Furnish and install 12" 45
degree water main bend;
4239
complete as specified
Each
14.00
8.00
-6.00
$595.00
$3,570.00
Furnish and install 10" water
main cap; complete as
4256
specifed
Each
1.00
1.00
$380.00
Furnish and install 12" water
main cap; complete as
4257
specified
Each
1.00
1.00
$435.00
Furnish and install 8" x 6"
water main reducer; complete
4264
as specified
Each
11.00
11.00
$245.00
Furnish and install 10" x 8"
water main reducer; complete
4267
as specified
Each
1.00
1.00
$315.00
Furnish and install 12" x 8"
water main reducer; complete
4270
as specified
Each
1.00
1.00
$435.00
Furnish and install 12" x 10"
water main reducer; complete
4271
as specified
Each
2.00
2.00
$475.00
Furnish and install 6" water
main gate valve; complete as
4401
specified
Each
20.00
20.00
$1,000.00
Furnish and install 8" water
main gate valve; complete as
4402
specified
Each
10.00
10.00
$1,300.00
Page 6 of 9
CONTRACT 17-12 CHANGE ORDER #2
ITEM
DESCRIPTIONUNIT
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install 10" water
Square
1-1100
main gate valve; complete as
Yards
142.00
138.90
-3.10
$8.15
($25.27)
4403
specified
Each
9.00
10.00
1.00
$1,850.00
$1,850.00
Furnish and install 12" water
main gate valve; complete as
4404
specified
Each
10.00
11.00
1.00
-123.80
$2,290.00
$2,290.00
($74.28)
Furnish and install 12" x 8"
Cubic
1-1200
tapping valve and sleeve;
Yards
112.00
0.00
-112.00
$14.30
($1,601.60)
4447
complete as specified
Each
1.00
1.00
$4,500.00
Furnish and install hydrant;
4500
complete as specified
Each
15.00
15.00
$3,400.00
Abandon water main on West
Murdock Avenue; complete
Lump
4900
asspecified
Sum
1.00
1.00
$6,700.00
1-1318
Abandon water main on
Yards
1320.00
1244.70
-75.30
$55.60
($4,186.68)
Oshkosh Avenue; complete
Lump
4902
as specified
Sum
1.00
1.00
$2,100.00
Abandon water main on West
1-1360
6th Avenue; complete as
Lump
8.00
7.00
-1.00
$210.00
($210.00)
4904
specified
Sum
1.00
1.00
$1,900.00
Remove water main;
Linear
4920
complete asspecified
Feet
76.00
50.00
179.80
-26.00
$43.00
$1,708.10
$1,118.00
Excavation special (water);
4990
complete as specified
Tons
318.00
0.00
318.00
$15.00
$4,770.00
SUBTOTAL - (BID ITEMS 1100 - 4990) $224,598.44 ($133,020.40)
ADDITIONAL WORK REQUIRED: CO #1 (W PACKER AVENUE)
ITEM
NUMBER
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Removing pavement;
Square
1-1100
complete asspecified
Yards
142.00
138.90
-3.10
$8.15
($25.27)
Removing concrete and
asphalt sidewalk and
driveway; complete as
1-1120
specified
395.00
271.20
-123.80
$0.60
($74.28)
Unclassified excavation;
Cubic
1-1200
complete asspecified
Yards
112.00
0.00
-112.00
$14.30
($1,601.60)
8" concrete pavement
removal and replacement;
including sawing; pavement
ties; integral curb and find
grading; turf restoration; and
traffic control; complete as
Square
1-1318
specified
Yards
1320.00
1244.70
-75.30
$55.60
($4,186.68)
Pavement ties; complete as
1-1350
s ecifed
Each
45.00
45.00
$9.00
Adjust manholes and inlets;
1-1360
complete as specified
Each
8.00
7.00
-1.00
$210.00
($210.00)
12" radius curb with 6" CABC
and grading; complete as
Linear
1-1410
specified
Feet
65.00
244.80
179.80
$9.50
$1,708.10
30" curb and gutter; 8"; with
6" CABC and grading;
Linear
1-1442
complete as specified
Feet
10.00
16.00
6.00
$23.75
$142.50
Sidewalk curb; complete as
Linear
1-1460
specified
Feet
15.00 1
15.00
1
1
$25.00
Page 7 of 9
CONTRACT 17-12 CHANGE ORDER 42
ITEM
DESCRIPTIONUNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
Square
1-1510
specified
Feet
355.00
192.70
-162.30
$5.70
($925.11)
Curb ramp detectable
warning field (natural/non-
painted); complete as
Square
1-1540
specified
Feet
8.00
8.00
$30.60
Drilled No. 4 sidewalk tie bars
- deformed; epoxy -coated;
1-1560
complete asspecified
Each
8.00
6.00
-2.00
$5.10
($10.20)
Sawing existing pavement;
Linear
1-1700
complete asspecified
Feet
11.50
10.30
-1.20
$2.30
($2.76)
Sawing concrete pavement
full depth; complete as
Linear
1-1710
specified
Feet
1130.00
130.50
-999.50
$3.07
($3,068.47)
Base aggregate dense; 3/4";
1-1800
complete as specified
Tons
215.00
44.00
-171.00
$13.30
($2,274.30)
Tack coat; complete as
1-1900
specified
Gallons
10.00
10.00
$7.00
Asphaltic cold weather
Square
1-1918
paving; complete as specified
Yards
145.00
0.00
-145.00
$15.00
($2,175.00)
4" asphaltic surface MT with
8" concrete base course;
Square
1-1920
complete as specified
Yards
145.00
138.90
-6.10
$75.00
($457.50)
Furnish and install 12" storm
Linear
1-2003
sewer; complete as specified
Feet
38.00
41.00
3.00
$60.00
$180.00
Furnish; install; maintain; and
remove Type D modified inlet
protection; complete as
1-2508
specified
Each
9.00
5.00
-4.00
$75.00
($300.00)
Sediment removal - Type D
modified inlet protection;
1-2510
complete asspecified
Each
9.00
5.00
-4.00
$5.00
($20.00)
Furnish; install; maintain; and
remove stone bag; complete
1-2516
as specified
Each
9.00
0.00
-9.00
$5.00
($45.00)
Abandon 15" and larger
storm sewer; complete as
Linear
1-2802
specified
Feet
325.00
195.00
-130.00
$25.00
($3,250.00)
Remove storm sewer
manholes and inlets;
1-2812
complete as specified
Each
1.00
1.00
$550.00
Connect to existing storm
sewer main; complete as
1-2850
s ecified
Each 1
2.00
2.00
$550.00
Connect to existing storm
sewer manhole; complete as
1-2856
specified
Each
1.00
1.00
$1,300.00
Furnish and install external
sanitary sewer manhole
chimney seal; complete as
1-3114
specified
Each
2.00
2.00
$500.00
ADDITIONAL WORK: CO #1 (ITEMS 1-1100- 1-3114) - SUBTOTAL $2,030.60 ($18,626.17)
ADDITIONAL WORK REQUIRED: CO #2
Page 8 of 9
CONTRACT 17-12 CHANGE ORDER #2
ITEM
NUMBER
DESCRIPTIONUNIT
NET DECREASE TO SECTION 1
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
ITEM
NUMBER
DESCRIPTIONUNIT
BID
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASEIN
CONTRACT PRICE
DECREASEIN
CONTRACT PRICE
Remove and replace core
2-10000
holes; complete asspecified
Each
1 0.00
12.00
12.00
1 $100.00
$1,200.00
Pour in place manhole;
Lump
2-20000
complete as specified
Sum
0.00
1.00
1.00
$3,612.59
$3,612.59
Remove and relay 21 "
concrete storm sewer;
Lump
2-20001
complete asspecified
Sum
0.00
1.00
1.00
$4,326.00
$4,326.00
24" storm sewer remove and
replace with connection;
Lump
2-20002
complete asspecified
Sum
0.00
1.00
1.00
$988.36
$988.36
Remove railroad track;
Linear
2-30000
complete asspecified
Feet
0.00
415.00
415.00
$5.56
$2,307.40
Sanitary lateral investigation;
Lump
2-30001
complete as specified
Sum
0.00
1.00
1.00
$980.43
$980.43
Furnish and install 10 x 8
2-40000
cross; complete as specified
Each
0.00
1.00
1.00
$850.00
$850.00
Furnish and install 12 x 12
2-40001
cross; complete as specified
Each
0.00
1.00
1.00
$1,200.00
$1,200.00
TM water shutoff downtime;
Lump
2-40002
complete asspecified
Sum
0.00
1.00
1.00
$3,822.50
$3,822.50
15" CMP culvert; complete as
Linear
2-40003
specified
Feet
0.00
34.00
34.00
$39.00
$1,326.00
15" CMP endwalls; complete
2-40004
as specified
Each
0.00
2.00
2.00
$175.00
$350.00
24" CMP culvert; complete as
Linear
2-40005
specified
Feet
0.00
24.00
24.00
$45.00
$1,080.00
24" CMP endwalls; complete
2-40006
as specified
Each
0.00
2.00
2.00
$225.00
$450.00
22 x 28 CMP culvert;
Linear
2-40007
complete as specified
Feet
0.00
34.00
34.00
$46.00
$1,564.00
22 x 28 CMP endwalls;
2-40008
complete as specified
Each
0.00
2.00
2.00
$235.00
$470.00
ADDITIONAL WORK: CO #2 - (BID ITEMS 2-10000 - 2-40008) - SUBTOTAL $24527.28 $0.00
NET INCREASE TO: SECTION 1 $99,509.75
NET INCREASE TO SECTION 1
$251,156.32
NET DECREASE TO SECTION 1
($151,646.57)
NET INCREASE TO CONTRACT:
$99,509.75
Page 9 of 9