Loading...
HomeMy WebLinkAbout10. 18-31 JANUARY 23, 2018 18-31 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE AGREEMENT FOR DISPOSAL OF CONTAMINATED SOIL FROM VARIOUS PROJECTS IN THE 2018-2019 CAPITAL IMPROVEMENT PROGRAM / WASTE MANAGEMENT- WISCONSIN ($2,527,500.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate agreement for professional services associated with disposal of contaminated soil from various projects with Waste Management in the amount of two million five hundred twenty-seven thousand five hundred dollars ($2,527,500.00). Acct. Nos. OXXX-XXXX-XXXX-XXXXX Multiple Funds - Multiple Accounts City of� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Com Council FROM: James Rabe, Director of Public Works DATE: January 18, 2018 RE: Agreement for Disposal of Contaminated Soil from Various Projects in the 2018- 2019 Capital Improvement Program / Waste Management -Wisconsin (estimated $2,527,500) BACKGROUND During the preliminary design work for this year's construction contracts, an environmental review for contaminated soils was conducted within planned project limits. Several locations were identified as areas of concern due to previous activities that occurred in those areas. These previous activities could include industrial use or commercial use, such as gas stations or other uses that historically have produced soil contamination. Soil samples will be taken in areas of concern and analyzed. Any encountered soils containing refuse, petroleum, heavy metals, or other hazardous substances will be landfilled. The closest landfill licensed to handle these materials is the Waste Management Landfill located in Berlin, Wisconsin. ANALYSIS Waste Management and the City have historically had a negotiated standard tipping fee for each of the contaminated soil types anticipated to be excavated. These costs have been, and continue to be, less than the regular commercial rate for waste disposal at the Waste Management facilities. The rates for 2018-2019 are $25.00/ton for contaminated soil, $18.00/ton for contaminated soil that can be used as daily cover, and $38.00/ton for general refuse. In addition to these rates, a $1.00/ton for an environmental fee will be charged to ensure continued environmental compliance. These rates are good through 2019 and are the same as the rates from 2016-2017, with the exception of the new $1.00 environmental fee. The standard Waste Management landfill tipping fee is $38.00/ton. A breakdown of projects anticipated to have contaminated soils and the estimated quantities of contaminated soil is attached. Additional projects may be added if contaminated soil is found at those locations. As a matter of comparison, the standard tipping fee at Outagamie County landfill is $43.00/ton. L\ Engineering\Tracy Taylor\ Memos to Mayor & Common Council \2018 \ Waste Mgmt-2018-2019 Page 1 Of 2 Disp of Contam Soil_1-18-18.docx FISCAL IMPACT The estimated total disposal cost for contaminated soils in 2018 is approximately $1,011,500. The estimated total disposal cost for contaminated soils in 2019 is approximately $1,516,000. The actual total cost will be based on the quantities hauled to the landfill. Funds for these services are budgeted as part of each construction project and are available in the Street, Storm Sewer, Sanitary Sewer, Water Main, and Property Improvement sections of the CIP or appropriate TIF district. RECOMMENDATIONS Section 12-11 of the Municipal Code of the City of Oshkosh provides that purchases of services, materials, supplies, or equipment, that are available from only one source, may be approved by the City Manager without the use of formal, sealed quotes. In accordance with Section 12-11 of the Code, I am recommending approval of this agreement. Please contact me if you have any questions concerning this agreement. Approved: Mark A. Rohloff City Manager JER/tlt L\Engineering\Tracy Taylor\Memos to Mayor & Common Council\2018\ Waste Mgmt-2018-2019 Page 2 of 2 Disp of Contam Soil_1-18-18.docx City d (khkozh Cond- PmjM Name Leradion PdAIe No. Maderial Type Landfill T ding ­dpi—d! PCB.- On Far Riven App.. Tonnage PRce Per Ton TWI Ezd. Cozf PmjM Start — PmjM EM Dade 1&22 Marson Water Road Water Tover Marson Road DC103252W Valle -I RDF RCRN 8 METALS, TOTAL VOC'S & N N 3000 $26 $]800 31112018 ]1312018 1]-0] Sou[h Park Basin Retrad¢ NonPCB Sediment 126 II GalumR Valley Trail RDF SVOCS, TCLP VOLS&SVOC'S, PGBS, GI—DRO O&G N N 1,000.00 $3H $38,000 2112018 51312018 1]-14 .lelduen Rrvenmlk Boalworksb Qegon St B1011]3HIIYN Valley TmiI RDF RCMBMETALS, VOCs, SVOC3 PC6s, PAHs GRO'DRO 2gp gp $2g $5,200 212018 51312018 1]-22 14th Ave&Main S[ E14th Ave antlSMain Street DCV12]104W Valley Trail ROF RCRNBMETALS,VOCs, SVOCs, PCBs, PAH GRO'DRO N N 500.00 $26 $13,000 4112018 61112018 Fill Soils Savdus D,.,. 12]803WI FiII5oi15Dai Cover Valk Trail RDF N N 500.00 $1B $9500 1811 K�ena3-Paulus lantlfill Gas Venlig F. Klerest and Paulus Quarties 124 11 Valley Trail RDF RGA 8 MI—s'VOGs,—GO Pe ide N N 4,000.00 $34 $138,000 10112018 31312019 .leldvenSringham Wat -,—1 BIOtt]3HIRM Valley Trail RDF RCRASMETALS,VOGs, SVOCs, PCBs, N N ],500D0 $3H $282,500 18-03 Remnsruciian 6th Avenue Box CUWeR Valle Trail RDF PARS GRO'DRO N y 4500.00 $3H $1]5500 CouR Street GouR St Cee Ave to Wa hin ton Ave Valle Trail RDF Solid WaselCoal Tar 3000.00 $3B $117000 1— —1 Ave IXter Ave _S[to RRTracks Valle Trail ROF Petmleuml actetl 500.00 $26$13000 51112018 101312018 Washington Ave WasM1irgton Ave(N Main St to Broatl St) [in prog—j Valley Tm!RDF RGRNB METALS,VOG�SVOC�PGBs, P.GRQ'DRO 100000 $26 $28,000 18-05 Oregon St Qegon St (W &h Ave to W 16tM1 Ave) Valle Trail RDF FII SoiISDaiI Cover Valle -I RDF N N 350800 3500. $26 $1B $B1 000 $8g 500 4112818 8/312018 1&13 Vine St Out Outtall 12411]WI SedirreM Valle -1 RDF 500.00 $3B $18500 5/12018 8/302018 -91130 Peholeum Contaminated Soil for TBD Valley -I RDF Bioremzdiation 33,000.00 $26 $858,000 1112018 12312018 2018 TBO GenemlWase and G80 Materials TBO Valle TraiIRDF 10000.00 $3B $380000 1112018 12312019 2019 TBO Sediment Material TBD Sed nt Valle Trail ROF 2000D0 $3B $]8000 11112018 12312019 20tH TBD FII SoiIS"H Cover TBD FM SoilSDai Cover Valle TmiI ROF 10000D0 $1B $180000 1112018 1123112018 rvo ireel mouse ancon environrremai ree_ 1— TB-0.in,ludes 201 B Streets, Gott Gourse and Foneer Rivenvalk'� Waite Rug Redevelopment and RehabilRation, and Marion Pearl and SONM1 Shore Redevelopment Projects Pmject,Ezt pwndityl tors Waste Tvce l]uanSNlTonz Ezt Coz[ Wasde Tvce 2019 Cio Sdreeds Retlevelovn Sedime 8,000 $312,)00 Sediment 1:—, 1,000 �0 Petroleum Petroleum 6,000DO 4888 23,000 Genesi wase Genemiwase aM G&D Materials 3,000.00 1,500 5,500 Fill SoilSDaily Cover 14000 $zee 000 Fill Soil50aity Cover 2,500.00 2,500 5,000 Kenos QLF Trial 85,500 $2,527,500