Loading...
HomeMy WebLinkAboutAECOM Proposal for Completion 2017 Leak DetectionAECOM REC��`V ED SEP 15 2p11 D1�pT ofN \NC : , la 05HY-0� Mr. Bob Johnson Water Distribution Superintendent 757 W Td Avenue Oshkosh, Wisconsin 54901 b'ohnson@ci.oshkosh.wi.us AECOM 558 North Main Street Oshkosh, WI 54901 aecom.com September 15, 2017 AECOM Proposal No. OPP-622851 Proposal for Completion of 2017 Leak Detection Services in Oshkosh, Wisconsin Dear Mr. Johnson, 13c(02 AECOM is pleased to submit this proposal to conduct a Leak Detection Survey on approximately 100 miles of water main in the City of Oshkosh's water distribution system in 2017. The proposed services represent the first phase of investigation activities to be completed on the historic cycle of leak detection survey activities to be completed on the City of Oshkosh Municipal Water Supply system. The 2017 scope of work (Phase 1) area is generally bounded by Oregon and Jackson Streets in the west; the city limits to the north, Lake Winnebago to the east and 24th Avenue to the south. The second and third phases of this program are anticipated for completion in 2018 and 2019. The purpose of the annual surveys is to identify specific points of leakage such that system rehabilitation can be undertaken and lost water reduced. The remainder of this proposal discusses the scope of services to be completed, schedule, information/assistance required from client and compensation. SCOPE OF WORK Services to be provided are as follows: Meet with Client to review existing water distribution systems maps, pertinent water system reports and the schedule for conducting the leak detection field services. Conduct a leak detection and location survey with sonic detection and computer correlation equipment on approximately 100 miles of the water distribution system. Physical contact will be made with the system at exposed valves and fire hydrants. After the initial sonic leak survey of a portion of the system is completed, indications of leaks will be verified a second time, after which leaks will be located with a computer programmed leak correlator designed to pinpoint leak locations without drill holes or excavations. Where leakage into a storm or sanitary sewer is suspected, a visual examination of the appropriate sewer will be conducted. All equipment used will be non -intrusive. Valves and hydrants will not normally require operation during the survey and pinpointing operations. This survey will be conducted. primarily during normal working hours, with additional leak detection being conducted during late evening and/or early morning hours in areas of high traffic volume. Prepare an inventory of defective system components such as valves, hydrants, meters and curb stops, which are noted in the course of carrying out field activities. AECOM will furnish a fully equipped vehicle, including all sonic leak detection equipment, tools and safety equipment for the duration of the project. Our Fluid Conservation System computer leak correlators will be utilized to pinpoint leaks. Prepare a yearly final report and submit five (5) copies of the report showing the results of the investigations. The report shall include a summary of the project and a list of leakage located by type, location, and estimated quantity of leakage. The final report will contain recommendations for future work based on the results of this survey. K:\PROPOSAL\City of Oshkosh\OPP-622851_Oshkosh 2017 LD Survey\OPP-622851_Oshkosh 2017 LD Survey Proposal.docx 1/4 r 0 Leak Detection Phase: 4-5 weeks Yearly Final Report: 2-4 weeks after field work CLIENT'S RESPONSIBILITIES Client, at its expense, shall do the following in a timely manner so as not to delay the Services. Furnish AECOM the following information/reports/assistance, all of which AECOM may rely upon without independent verification in performing the Services. All available street maps and water distribution system maps. One (1) experienced person with a good working knowledge of the water distribution system to assist on a part- time basis in field activities such as location of system components. Access to valves and curb stops by uncovering and cleaning valves and curb boxes, where required, prior to initiation of field activities. The City of Oshkosh agrees to hold harmless and indemnify AECOM against any liability arising out of the items above for which the City is responsible. CLIENT REPRESENTATIVE Designate a representative for the Project who shall have the authority to transmit instructions, receive information, interpret and define Client's policies, and make decisions with respect to the Services. COMPENSATION Compensation for the services as presented of this agreement will be on a lump sum basis as follows: 2017 Services (100 miles): General area bounded by Oregon and Jackson Streets in the west; the city limits to the north, Lake Winnebago to the east and 24th Avenue $21,485.10 to the south Project Management / Report Preparation $1,750.00 Total $23,235.10 Please note the lump sum fee will be adjusted if the segment length is reduced or increased. The above described scope of services will be performed in accordance with the negotiated AECCOM and City of Oshkosh Terms and Conditions dated April 2009. We appreciate this opportunity to provide services to the City of Oshkosh. If you desire to proceed with these services please sign the attached authorization form and return to Paul Timm. If you have any questions concerning the information contained herein, please feel free to contact us. Yours sincerely, AECOM Technical Services, Inc. Tim Wolf Project Engineer encl: Authorization Thomas J. Holtan, P.E. District Manager K:\PROPOSAL\City of Oshkosh\OPP-622851_Oshkosh 2017 LD Survey\OPP-622851_Oshkosh 2017 LD Survey Proposal.docx 2/4 AECOM 558 N Main Street Oshkosh, Wisocnsin 54901 920.236.6710 Authorization September 15, 2017 I hereby certify that the necessary provisions have been made to pay the liability, which will accrue under this contract. I hereby authorize AECOM to proceed with the scope of work for the Completion of 2017 Leak Detection Services in the City of Oshkosh as described in AECOM's proposal OPP-622851 dated September 15, 2017, with a budget authorization of $23, 235.10 under the general terms and conditions specified in the proposal. 01 Signa ure Mark A Rohloff Print Name City Manager Title/Organization 0A C' Signatur�,elaS.�a 5&eawd !?a Ig P,NoNam� . City Crkk Titl;are anization Lynn A. Lorenson Print Name City Attorney Title/Organization Signature Trena Larson Print Name Director of Finance Title/Organization I��SI(� Date �S I Date to) o%r► Date � isn`t Date K:\PROPOSAL\City of Oshkosh\OPP-622851_Oshkosh 2017 LD Survey\OPP-622851_Oshkosh 2017 LD Survey Proposal.docx 3/4 A=COM I agree to accept invoices from AECOM via e-mail and not postal mail: Yes Signature: E-mail address: Recipient Mr/Ms: Return to: Name: Paul Timm Address: 558 N. Main Street, Oshkosh, WI 54901 Phone: 920-236-6718 E-mail: Pa�iLTinarn<<_Tec�m.cc>rr KAPROPOSAL\City of Oshkosh\OPP-622851_Oshkosh 2017 LD Survey\OPP-622851_Oshkosh 2017 LD Survey Proposal.docx 4/4