Loading...
HomeMy WebLinkAboutAECOM Preliminary Environmental Database/Records Review for 2018 CIPAECOM Mr. James Rabe, PE, CPESC Director of Public Works City of Oshkosh 215 Church Avenue Oshkosh, WI 54901 RECEIVED q FP �; F, 2011 DLI' I f 11 PUBLIC WORKS Os;il�„>Il. WISCONSIN AECOM 558 North Main Street Oshkosh, WI 54901 aecom.com September 20, 2017 AECOM Proposal No. OPP-703678 Preliminary Environmental Database / Records Review for 2018 Capital Improvement Projects in Oshkosh, Wisconsin Dear Mr. Rabe, AECOM Technical Services, Inc. (AECOM) is pleased to submit this proposal to provide a preliminary environmental database/records review for select City of Oshkosh 2018 Capital Improvement Projects. These services are being provided to evaluate potential revisions to the geotechnical soil boring program and potential additions to the contract special conditions. The anticipated streets or projects were based on the Preliminary 2018 Capital Improvement Program (CIP) dated June 9, 2017. Specifically, the streets or projects requested for this scope of work include: • Oregon Street — West 8'h Avenue to West 16`h Avenue • Court Street — Ceape Avenue to Washington Avenue • Otter Avenue — State Street to railroad tracks (Broad Street) • Washington Avenue — North Main Street to Broad Street • Libbey/Nicolet Watershed/North Main Street Area Detention Basin — Reviewed for previous project • Jeld-Wen/Stringham Watershed Outfall Reconstruction — Reviewed as part of Chapter 30 Application • East Parkway Avenue Watershed Detention Basin — Phase I Environmental Site Assessment being completed under separate project • Fernau Watershed Land Acquisition (South of Fernau Avenue between North Main Street and Moser Street) — Reviewed for previous project • Columbia Avenue Water Main Replacement —Algoma Boulevard to Vinland Street • Roosevelt Avenue Water Main Replacement — Hamilton Street to end of cul-de-sac east of Crane Street • Minerva Street Water Main Replacement — Dead end south of Columbia Avenue to Linwood Avenue • Punhoqua Street and Graham Avenue Sanitary Sewer Replacement — Punhoqua Street (from Maple Avenue to Rainbow Drive) and Graham Avenue (from Punhoqua Street to North Eagle Street) — A portion of this area was reviewed during the 2017 CIP Review • Buchanan Avenue Sanitary Sewer Replacement — North Eagle Street to Sawyer Creek • North Eagle Street Sanitary Sewer Replacement — Maple Avenue to Sawyer Creek • Maple Avenue Sanitary Sewer Replacement — Punhoqua Street to North Eagle Street • Hawk Street Sanitary Sewer Replacement — Buchanan Avenue to Sawyer Creek KAPROPOSAL\City of Oshkosh\OPP-703678_2018 CIP Env Records Review\OPP-703678_2018 CIP Environmental Records Review Proposal.docx 1/5 AECOM Vacated Arthur Avenue Sanitary Sewer Replacement —In easement (vacated Arthur Avenue) Please note that for the sake of completeness we have included all streets or projects based on the Preliminary 2018 CIP dated June 9, 2017. Bolded projects are either previously completed, in progress, or to be completed by others. Scope of Work Environmental Database/Records Review For the CIP projects listed above, AECOM will conduct a search of the Wisconsin Department of Natural Resources (WDNR) Bureau of Remediation and Redevelopment Tracking System (BRRTS), WDNR Remediation and Redevelopment Sites Map, and Wisconsin Department of Safety and Professional Services (formerly Department of Commerce) Storage Tank databases for sites/properties listed within or adjacent to the project locations. If sites/properties are discovered in the databases that are adjacent to or within the project locations, AECOM will review available online information provided in the database systems to determine if there is a potential to encounter contaminated soil and/or groundwater during the future construction activities. AECOM will also review Sanborn° Maps (that AECOM has available on file), and A History of The City of Oshkosh Sanitation Department, Chapter 7 — Dumps and Landfills (Steve R. Langkau, 1990) for sites within or adjacent to the construction limits. Based upon the initial review of the information, AECOM will meet with the City of Oshkosh to provide recommendations for soil boring locations and potential laboratory analyses to be incorporated into the geotechnical soil boring program for these projects. Following this meeting, a map and summary table showing the identified sites of concern will be provided to the City of Oshkosh. Digital information to be used in geographic information system (GIS) mapping that includes the sites of concern and potential areas of environmental impact will also be provided. AECOM has included additional budget to assist the City of Oshkosh in permitting efforts required by the WDNR for water main construction and/or replacement. Geotechnical Drilling Oversight AECOM will provide environmental services in accordance with the `Environmental Services Program (Pre -Construction Screening and Construction Monitoring)' developed by the City of Oshkosh and will include the following tasks: 1. AECOM will provide input during development of the request for proposal (RFP) for the Geotechnical Engineering Services Contract based on the environmental records review; 2. AECOM will attend a pre -construction conference with the selected geotechnical driller to discuss potential environmental impacts that may be encountered during drilling; and 3. AECOM will provide environmental oversight during the geotechnical drilling, including field screening of the split soil samples collected by the geotechnical driller and review of the draft geotechnical boring logs. The level of environmental oversight provided by AECOM will depend on the potential sites of concern identified during the environmental records review. AECOM will visit the geotechnical driller at least two times per day to pick up split soil samples and review the draft geotechnical boring logs. Full-time oversight will be provided during geotechnical drilling operations occurring in areas identified as having potential environmental impacts. KAPROPOSAMity of Oshkosh\OPP-703678_2018 CIP Env Records Review\OPP-703678_2018 CIP Environmental Records Review Proposal.docx 2/5 AECOM Based upon the above scope of work, the estimated costs to provide a preliminary environmental database/records review for the listed 2018 CIP streets/projects is $31,600. AECOM can begin the research immediately upon receipt of authorization and anticipates that the work will be completed approximately one month after receiving authorization. Oregon Street $5,000 Court Street $3,000 Otter Aven ue $3,000 Washington Avenue $3,000 Columbia Avenue Water Main Replacement $2,200 Roosevelt Avenue Water Main Replacement $2,200 Minerva Street Water Main Replacement $2,200 Punhoqua Street and Graham Avenue Sanitary Sewer Replacement $2,200 Sawyer Creek Area Sanitary Sewer Replacement $2,200 (Buchanan Avenue, North Eagle Street, Maple Avenue, Hawk Street, and Vacated Arthur Avenue) Three Additional Streets [to be determined] $6,600 Environmental Review Estimated Cost $31,600 The estimated cost for the environmental support during geotechnical drilling is $43,200 and has been developed using the level of effort required for similar oversight provided during the 2017 CIP geotechnical drilling. The estimated cost for each street segment has been estimated based on AECOM's current knowledge of the area and the anticipated level of effort required. Estimated costs also include laboratory analyses and development of waste profiles for disposal on segments where AECOM anticipates environmental impacts. Oregon Street $13,500 Court Street $6,600 Otter Avenue $6,600 Washington Avenue $7,700 Columbia Avenue Water Main Replacement $1,200 Roosevelt Avenue Water Main Replacement $1,200 Minerva Street Water Main Replacement $1,200 Punhoqua Street and Graham Avenue Sanitary Sewer Replacement $2,600 Sawyer Creek Area Sanitary Sewer Replacement $2,600 (Buchanan Avenue, North Eagle Street, Maple Avenue, Hawk Street, and Vacated Arthur Avenue) Environmental Oversight Estimated Cost $43,200 The services described in this proposal will be provided on a time and materials basis per the Negotiated Fee Schedule. AECOM will not exceed the above estimate without your authorization and approval. The services provided will be performed in accordance with the conditions of the 2009 City of Oshkosh Negotiated General Conditions of Service (attached), which are expressly incorporated into, and are an integral part of, our contract for professional services, and the attached Commercial Terms. The project K:\PROPOSAL\City of Oshkosh\OPP-703678_2018 CIP Env Records Review\OPP-703678_2018 CIP Environmental Records Review Proposal.docx 3/5 AECOM will be invoiced by assigning a task per street which will be matched to respective budget for City tracking purposes. The estimated costs per contract are presented below. To initiate this work, please sign the attached Authorization to Proceed and email a copy to Paul.timm@aecom.com. Our understanding is that the City of Oshkosh will also issue a purchase order (P.O.) for all approved tasks. Please reference the AECOM proposal number, OPP-703678 in the P.O. that is forwarded to the AECOM Oshkosh, WI Office. We look forward to working with you and providing assistance with this project. If you have any questions or need to clarification on the estimated costs, please call Paul Timm at 920- 236-6718. Yours sincerely, AEC Technical Pprvices, Inc. Cliff Shierk, P.E. Project Manager \---_Paul Timm Account Manager N\A�D CSA" Christina M. Boehm- arlson OV -01 President encl: Authorization City of Oshkosh Environmental Services Program cc: Tracy Taylor, City of Oshkosh Public Works Department KAPROPOSAL\City of Oshkosh\OPP-703678_2018 UP Env Records ReviewNOPP-703678_2018 CIP Environmental Records Review Proposal.docx 4/5 A=COM Authorization September 20, 2017 558 N Main Street Oshkosh, Wisconsin 54901 920.236.6710 I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. I hereby authorize AECOM to proceed with the scope of work for the Preliminary Environmental Database/Records Review for 2018 Capital Improvement Projects in Oshkosh, Wisconsin as described in AECOM's proposal number OPP-703678, dated September 20, 2017, with a budget authorization of $74,800 under the general terms and conditions specified in the proposal. Date L7 Date /Cohoi�" Date 1015 111 Date KAPROPOSAL\City of Oshkosh\OPP-703678_2018 CIP Env Records Review\OPP-703678_2018 CIP Environmental Records Review Proposal.docx 5/5 Signature Mark A Rohloff Print Name City Manager Title/Or anization SignaturePamela R-6" P int Nartjle -Clerk o City Title rganization %I— ��" ';�--rnzhure �.� Lynn A.Lorenson Print Name City Attorney Title/Organization Signature Trena Larson Print Name Director of Finance Title/Organization Date L7 Date /Cohoi�" Date 1015 111 Date KAPROPOSAL\City of Oshkosh\OPP-703678_2018 CIP Env Records Review\OPP-703678_2018 CIP Environmental Records Review Proposal.docx 5/5