HomeMy WebLinkAboutPtaschinski Construction Change Order No 1 17-17City of� Oshkosh October 2, 2017 Mr. Tom Ptaschinski Ptaschinski Construction, Inc. W7352 STH 33 Beaver Dam, WI 53916 RE: Change Order No.1 (Final) Contract 17-17 Dear Mr. Ptaschinski: BNL -1 Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Ptaschinski Construction, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, ?es Rabe, P.E., CPESC ' Director of Public Works JER/tlt Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) 1:\ Engineering\2017 CONTRACTS \ 17-17 Hemlock Ct-Fraser Dr\ Project_Information\Contract Info \Change Orders\17-17 Executed CO #1 (Final Ltr)-10-2-17.docx City Hall, 215 Church Avenue P.O. Box 1 130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us Page 1 of 1 TO: PTASCHINSKI CONSTRUCTION, INC. CHANGE ORDER #1 (FINAL) W7352 STH 33 DATED: SEPTEMBER 12, 2017 BEAVER DAM, WI 53916 Your present contract with the City of Oshkosh, Contract No. 17-17, awarded February 14, 2017, is hereby amended and changed as follows: DECREASE TO: SECTION 1 ($245.27) SECTION I TOTALS BID TOTAL $169,180.99 $169,180.99 CO #1 ($245.27) ($245.27) CONTRACT TOTAL $168,935.72 $168,936.72 CITY OF OSHKOSH BY: City Manager City Clerk Approved an ccepte 1hp (doJ ntractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved asorm: City Attorney. CONTRACT: 17-17 CHANGE ORDER # 1 SECTION I ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Removing curb and gutter; Linear 1110 complete asspecified Feet 2010.00 2,005.70 -4.30 $2.00 $8.60 Removing concrete and asphalt sidewalk and driveway, complete as Square 1120 1 specified Feet 1750.00 1 1,364.70 -385.30 1 $0.50 $192.65 Unclassified excavation; Cubic 1200 complete asspecified Yards 690.00 657.10 -32.90 $12.00 $394.80 7" concrete pavement; base in place and grading; Square 1300 complete asspecified Yards 3045.00 3,014.20 -30.80 $37.22 $1,146.38 Crushed aggregate base course; complete as 1340 specified Tons 10.00 10.00 1 $10.00 Adjust manholes and inlets; 1360 complete asspecified Each 20.00 17.00 -3.00 $300.00 $900.00 Turf restoration on Fraser Square 1370A Drive; complete asspecified Yards 511.50 495.20 -16.30 $6.91 $112.63 Turf restoration on Hemlock Square 1370B Court; complete as specified Yards 738.50 1,162.40 423.90 $6.91 $2,929.15 12" radius curb cut with 6" CABC and grading; complete Linear 1410 asspecified Feet 142.00 147.10 5.10 $10.00 $51.00 30" curb and gutter, 7' with 5" CABC and grading, Linear 1440 complete as specified Feet 12.00 10.60 -1.40 $25.00 $35.00 gutter; 8"; with 6" CABC and grading; complete as Linear 1450 1 specified Feet 90.00 1 85.80 -4.20 $14.00 $58.80 4" concrete sidewalk with 3" CABC and grading, complete Square 1 1500 asspecified Feet 525.00 283.50 -241.50 1 $4.15 $1,002.23 6" concrete sidewalk/driveway/ramp with 3" CABC and grading, Square 1510 complete as specified Feet 1625.00 1,443.20 -181.80 $4.65 $845.37 Curb ramp detectable warning field (naturaUnon- painted); complete as Square 1540 ispecified Feet 30.00 1 40.00 10.00 1 $25.00 $250.00 Drilled No. 4 sidewalk tie bars, deformed, epoxy - coated, complete as 1560 specified Each 65.00 46.00 -19.00 $6.00 $114.00 Sawing existing pavement, Linear 1700 complete asspecified Feet 230.00 237.90 7.90 $1.50 $11.85 Tack coat; complete as 1900 1 specified Gallons 12.00 1 12.00 1 $10.10 4" asphaltic pavement with 10" CABC and grading, Square 1906 complete asspecified Yards 9.00 6.80 -2.20 $70.70 $155.54 4" asphaltic transition with 10" CABC and grading, Square 1911 complete as specified Yards 167.00 164.90 -2.10 $27.27 $57.27 Furnish and install 18" storm Linear 2009 sewer; complete asspecified Feet 16.00 16.00 1 $112.00 Furnish and install 24" storm Linear 2015 sewer; com fete asspecified Feet 10.00 10.00 $120.00 Connect to existing storm sewer main; complete as 2850 specified Each 4.00 4.00 $250.00 Page 1 of 2 CONTRACT: 17-17 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Connect to existing storm sewer manhole, complete as 2856 specified Each 2.00 2.00 12.00 $200.00 $1,320.00 Furnish and install external sanitary sewer manhole chimney seal; complete as Linear 3114 specified Each 4.00 4.00 1 24.00 $600.00 1 $216.00 Furnish and install external sanitary sewer manhole chimney seal extension; 3116 lcomplete ass specified Each 1.00 1.00 $200.00 Furnish and install 4"/6" sanitary sewer lateral (relay); Linear 3234 complete ass cified Feet 20.00 20.00 $64.00 Furnish and install sanitary sewer lateral marker balls; 3236 complete ass specified Each 2.00 2.00 $75.00 SECTION I - (BID ITEMS 1100 - 3236 SUBTOTAL $3,242.00 ($5,023.27) ADDITIONAL WORK REQUIRED: C.O. #1 ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACTPRICE DECREASEIN CONTRACTPRICE Furnish; install, maintain; and remove Type D modified inlet protection; complete as 1-2508 specified Each 0.00 12.00 12.00 $110.00 $1,320.00 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as Linear 1-2518 Ispecified Feet 1 0.00 1 24.00 1 24.00 $9.00 1 $216.00 ADDITIONAL WORK: C.O. #1 (ITEMS 1-2508 -1-2518) SUBTOTAL $1,536.00 $0.00 NET DECREASE TO: SECTION 1 ($245.27) NET INCREASE TO SECTION 1 $4,778.00 NET DECREASE TO SECTION 1 ($5,023.27) NET DECREASE TO CONTRACT: ($245.27) Page 2 of 2