HomeMy WebLinkAbout20. 17-606 DECEMBER 12, 2017 17-606 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE AMENDMENT TO ENGINEERING SERVICES AGREEMENT WITH CH2M HILL ENGINEERS,INC. FOR WATER FILTRATION PLANT CLEARWELLS REPLACEMENT FINAL DESIGN ($149,280.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City and CH2M HILL Engineers, Inc. (CH2M HILL) previously entered into a professional services agreement in which CH2M HILL would provide the City with a Preliminary Design Study for the replacement of the clearwells at the Water Filtration Plant; and WHEREAS, in 2017 CH2M Hill was chosen to provide the final design services and prepare bidding plans and specifications for the clearwell replacement project; and WHEREAS, during the final design, utility staff and CH2M identified a number of opportunities to enhance the project design that would provide long-term value to the Water Utility, provide better protection of utility assets, and assure regulatory compliance during construction; and WHEREAS, additional engineering services are necessary that are related to this work. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are authorized and directed pursuant to Section 12-16 of the Municipal Code to enter into an amended agreement with CH2M HILL and said City officials are authorized and directed to take those steps necessary to implement the terms and conditions of the final agreement. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541-1810-1799-00000 Water Utility Construction in Progress TO: FROM DATE: RE: City o� Oshkosh MEMORANDUM Honorable Mayor and Members of the Common Council Stephan M. Brand, Public Works Utility Bureau Manager December 7, 2017 Approve Amendment to Engineering Services Agreement for Water Filtration Plant Clearwells Replacement Final Design / CH2M HILL Engineers, Inc. (CH2M) ($149,280) BACKGROUND In November 2014, CH2M completed a Preliminary Design Study for the replacement of the clearwells at the Water Filtration Plant. The clearwells are concrete cast -in-place structures that range in age from 51 to 94 years old. In the 2007 and 2010 sanitary surveys of the City's water system, the Wisconsin Department of Natural Resources (WDNR) identified Administrative Code deficiencies with these structures. The most recent inspection of these structures indicate they are in fair condition, at best, and are in need of replacement based on their age and the WDNR-identified code deficiencies. The two (2) options identified in the study were: to replace the basins in ground, which would require a sophisticated secondary containment system due to the basins being partially below groundwater level; or construct aboveground basins with secondary pumping to meet the WDNR's groundwater separation requirements. The aboveground option with intermediate pumping was selected as the option that best met the regulatory requirements and provided the simplest long-term operating requirements for the facility. An electrical system study was done, in addition to the original Preliminary Design Study, to identify any additional electrical system work that would need to be done to support the intermediate pumping and the backup generators, which have issues related to their age and availability of parts and service. In January 2017, CH2M was chosen to provide the final design services and prepare bidding plans and specifications for the clearwell replacement project. ANALYSIS During the final design, utility staff and CH2M identified a number of opportunities to enhance the project design that would provide long-term value to the Water Utility, provide better protection of utility assets, and assure regulatory compliance during construction. These additional out -of -scope work items include: • Addition of a water surge protection system to reduce water hammer, which can lead to water main breaks and equipment damage. • Re -use of some existing assets to control construction costs while meeting project objectives. 1:\Engineering\2017 CONTRACTS\17-18 WFPClearwelis\Project_tnformation\Correspondence\Memo \17-18 CH2M Page 1 Of 2 CA #1 Memo 12-7-17.docx • Improve storm water management on the Water Filtration Plant property and reduce the impact on the adjacent Storm Water Utility -owned storm water system. • Minimize construction -related disruption by integrating other City capital improvement projects, such as the chemical room roof replacement project and standby generator replacement project, with this project. • Provide additional public information and community engagement opportunities for the project. • Develop a detailed interim operations plan to maintain Water Filtration Plant reliability during construction. FISCAL IMPACT This cost of this proposed contract amendment is for $149,280. Funding is available within the 2017 Capital Improvement Program from the water main construction projects coming in under budget. RECOMMENDATIONS Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a specialized nature, including engineering services, may be procured without the use of formal, sealed quotes. I have reviewed this amendment and, in accordance with Section 12-16 of the Code, I am hereby recommending the Common Council approve this amendment. Approved, Mark A. Rohloff City Manager SMB/tlt h\Engineering\2017 CONTRACTS\17-18 WFPClearwells\Project_Information\Correspondence\Memo\17-18CH2M Page 2 Of 2 CA 01 Memo 12-7-17.docx NOVEMBER 17, 2017 SCOPE OF SERVICES Water Filtration Plant Clearwells Replacement Final Design Services City of Oshkosh Resolution No. 17-27, Amendment No.1 During the Water Filtration Plant (WFP) Clearwells Replacement Project (Project) final design development, the City of Oshkosh (City) made design -related decisions that provide critical benefits to the City but that also resulted in additional engineering services. These benefits include the following: • Safeguarding and enhancing WFP operational reliability during Project construction • Mitigating watermain breaks and equipment damage from water hammer with a surge protection system • Maximizing re -use of existing assets to control costs while meeting Project objectives • Improving storm water management on the WFP property and for the contiguous storm water collection system • Minimizing construction -related disruption by integrating other City capital improvement projects with the Clearwells Replacement Project • Providing public information and community engagement opportunities on the Project The scope of services describes the engineering services beyond CH2M's agreement with the City: Water Filtration Plant Clearwells Replacement Final Design Services Project City Resolution No. 17-27 dated February 8, 2017. The scope also includes supplemental design and field services provided by CH2M's subconsultant, AECOM. Task 1—Additional Design and Field Services To design the project features needed to realize the benefits listed above, CH2M provided professional engineering services and deliverables beyond its agreement with the City as described in Table 1. Table 1. CH2M Additional Design and Field Services Project Benefit Additional Services and Deliverables Safeguarding and enhancing WFP Field investigation and final design drawings and specifications for Chlorine Contact operational reliability during and Basin modifications to provide more filter backwash water during construction; Add post -Project construction interim High Lift Pump 8 and Pump 9 drive modifications to provide pumping flexibility during construction; Add portable emergency generator quick connect system; Add Chlorine Contact/Backwash Supply Basin expansion joint repair; Relocate WPS electric utility transformer and reroute primary service to avoid WPS easement through WFP property. Mitigating watermain breaks and Update the water distribution system model for all planned watermain equipment damage from water improvements located near the WFP through 2020 to use as basis for hydraulic hammer with a surge protection surge analysis, along with new high lift pump curves. Conduct surge analysis to system identify areas of concern in the distribution system and establish design criteria for surge project system. Develop final design drawings and specifications for the surge tank. Maximizing re -use of existing assets Modify Backwash Supply Basin to serve as the new Intermediate Pump Station to control costs while meeting wetwell; modify baffle wall configuration to maintain backup chlorine disinfection Project objectives abilities; Reuse existing buried clearwell walls and floors to help minimize groundwater management during construction and provide stable foundation for new structures: Modifv existine hieh lift Dumoine area to house new suree tank: Table 1. CH2M Additional Design and Field Services Project Benefit Additional Services and Deliverables Reuse existing Flow Meter Vault flow control valve during select modes of Intermediate Pump Station operation. Minimizing construction -related Conduct field investigation of WFP Chemical Building roof to identify permanent disruption by integrating other City needed repairs and modifications needed to meet current building code to be capital improvement projects with completed in conjunction with planned 2017 membrane roof replacement capital the Clearwells Replacement Project improvement project. Develop drawings and specification for roof replacement and installation of roof overflow drain system. Incorporate 12 -inch watermain replacement capital improvement project in Project to avoid individual project administrative costs. Improving storm water Conduct additional field and technical services to develop accurate site topographic management on the WFP property map (survey locations of clearwells' corners, survey utility locations to fill gaps in and for the contiguous storm water City provided survey data); Develop site grading plan and storm water management collection system design to meet City requirements for new development; Design new WFP site storm water outfall to discharge directly to Lake Winnebago; Conduct sediment sampling at outfall location; Prepare Chapter 30 permit application and associated drawings. Task 2 —Additional Permitting Services The Project permitting agencies include the Wisconsin Department of Natural Resources (WDNR), the Wisconsin Public Service Commission (PSC), and the City of Oshkosh Departments of Public Works, Community Development and Inspection Services. Permitting services provided beyond the original scope of work include one additional meeting in both the WDNR and PSC Madison offices to discuss the Project and construction approvals. Based on direction from the City Department of Community Development, CH2M prepared a Zoning Map Amendment Application with attachments. CH2M also worked with the City to confirm that there weren't State Historic Preservation Office project permitting requirements. CH2M assisted the City with public outreach as described in Table 3. Table 3. CH2M Additional Permitting Services Project Benefit Additional Services and Deliverables Providing public information and Developed neighborhood public meeting resources (displays, PowerPoint community engagement presentation, Frequently Asked Questions handout) and public meeting summary; opportunities on the Project developed alternative reservoir architectural concepts based on public input; prepared cost estimates for reservoir alternatives Task 3—Project Management, Quality Assurance/Quality Control, Cost Estimating CH2M managed the delivery of the additional professional technical services and work products to meet the City's schedule. Project management duties include project team communication, coordination of supplemental work, collaboration with the City on design details associated with changes in design. CH2M performed a quality assurance/quality control review of completed work. CH2M prepared construction cost estimates for supplemental project features. Schedule The scope of services described herein were provided in 2017. Level of Effort and Compensation The estimated level of effort is 1,066 hours for professional services is $149,280. A work breakdown is shown in Table 4. Table 4. Estimated Level of Effort and Compensation TOTAL PROJECT HOURS 1,066 TOTAL LABOR PROJECTCOST $145,530.00 TOTAL EXPENSES $3,750.00 TOTAL PROJECT COST $149,280.00 TASK 1 TASK 2 TASK 3 HOURLY DESIGN PERMITTING PM C CE PERSONNEL(NAME) RATE HOURS TASK COST HOURS TASK COST HOURS TASK COST Mana ement& Constructibility Senior Project Mana er 210.00 50 10500.00 30 6300.00 16 3360.00 Senior Consulta nt $210.00 10 $2,100.00 4 $840.00 8 $1,680.00 Senior Construction Manager $190.00 $0.00 $1,520.00 $0.00 Process & Mechanical Seniior Technologist $180.00 20 $3,600.00 $0.00 $0.00 Project Modeler $150.00 40 $6,000.00 $0.00 $0.00 Senior Consult a nt $220.00 60 $13,200.00 $0.00 $0.00 Senior Consultant $220.00 $0.00 $0.00 4 $880.00 Senior Consultant $220.00 $0.00 $0.00 4 $880.00 Structural Project En ineer 170.00 30 $5,100.00 0.00 0.00 Senior Consulta nt $220.00 $0.00 $0.00 4 $880.00 Stormwater Project En ineer 165.00 0.00 2 330.00 0.00 Staff En ineer 125.00 $0.00 2 $250.00 $0.00 Junior In ineer 105.00 0.00 78 8190.00 0.00 Juntion En neer 95.00 0.00 132 $12,540.00 $0.00 Building Mechanical Senior Designer $190.00 8 $1,520.00 $0.00 $0.00 Senior Consultant $220.00 $0.00 $0.00 4 $880.00 Senior Consultant $190.00 8 $1,520.00 8 $1,520.00 $0.00 Electrical Project En ineer 150.00 40 $6,000.00 0.00 0.00 Senior Consulta nt $220.00 $0.00 $0.00 8 $1,760.00 I&C Project Engineer $150.00 16 $2,400.00 $0.00 $0.00 Senior Consultant $220.00 $0.00 $0.00 4 $880.00 Civil Project En ineer 160.00 20 3200.00 24 3840.00 0.00 Senior Consulta nt $220.00 $0.00 $0.00 8 1760.00 CADTechnician $85.00 20 $1,700.00 $0.00 $0.00 Architectural Project Engineer $165.00 30 $4,950.00 10 $1,650.00 $0.00 Senior Consultant $220.00 $0.00 $0.00 $0.00 CAD Senior CADTechnician100.00 80 8000.00 0.00 0.00 Senior CAD Technician 115.00 80 9200.00 24 $2,760.00 $0.00 CADTechnician $80.00 90 $7,200.00 8 $640.00 $0.00 CADTechnician $90.00 30 $2,700.00 $0.00 $0.00 Administrative Clerical Clerical $75.00 24 $1,800.00 8 $600.00 $0.00 Graphic Artist $75.00 $0.00 12 $900.00 $0.00 TOTAL LABOR PERTASK 656 90690 350 41880 1 60 $12,960 EXPENSES PER TASK $2,000.00 $1,000.00 Sediment Sampling Sub. Lab. $750.00 TOTAL COST PERTASKI 1 $93,440.00 1 1 542.880.00 $12,960.00 TOTAL PROJECT HOURS 1,066 TOTAL LABOR PROJECTCOST $145,530.00 TOTAL EXPENSES $3,750.00 TOTAL PROJECT COST $149,280.00