Loading...
HomeMy WebLinkAbout25. 17-554NOVEMBER 14, 2017 17-554 ORDINANCE FIRST READING (CARRIED PURPOSE INITIATED BY LOST LAID OVER WITHDRAWN ) APPROVE ZONE CHANGE FROM I INSTITUTIONAL DISTRICT TO I -PD INSTITUTIONAL DISTRICT WITH PLANNED DEVELOPMENT OVERLAY; 425 LAKE SHORE DRIVE CH2M HILL ENGINEERS, INC. PLAN COMMISSION RECOMMENDATION: Approved A GENERAL ORDINANCE OF THE CITY OF OSHKOSH AMENDING SECTION 30-32 OF THE OSHKOSH MUNICIPAL CODE PERTAINING TO ZONING DISTRICTS. The Common Council of the City of Oshkosh do ordain as follows: SECTION 1. That Section 30-32 of the Oshkosh Municipal Code pertaining to Zoning Districts and the map therein described is hereby amended by changing the district character of the described property located at 425 Lake Shore Drive from I Institutional District to I -PD Institutional District with Planned Development Overlay. ALL OF LOTS 28 AND 29 OF BLOCK 37, EVANS ADDITION. PLUS PUBLIC RIGHT OF WAY ADJACENT TO SAID LOT EXTENDING TO THE CENTERLINE OF MERRITT AVENUE, LAKE SHORE DRIVE, WASHINGTON AVENUE AND LINDE STREET. ALL IN THE LITH WARD, CITY OF OSHKOSH, WINNEBAGO COUNTY, WISCONSIN. SECTION 2. This Ordinance shall be in full force and effect from and after its passage and publication. SECTION 3. Publication Notice. Please take notice that the City of Oshkosh enacted Ordinance #17-xxx APPROVE ZONE CHANGE FROM I INSTITUTIONAL DISTRICT TO I -PD INSTITUTIONAL DISTRICT WITH PLANNED DEVELOPMENT OVERLAY; 425 LAKE SHORE DRIVE on November 28, 2017. This ordinance changes the zoning at 425 Lake Shore Drive from I Institutional District to I -PD Institutional District with Planned Development Overlay. The full text of the Ordinance may be obtained at the Office of the City Clerk, 215 Church Ave. and on the City's website at www.ci.oshkosh.wi.us. Clerk's phone: (920) 236-5011. TO: Honorable Mayor and Members of the Common Council FROM: Darryn Burich Director of Planning Services DATE: November 9, 2017 RE: Approve Zone Change from I Institutional District to I -PD Institutional District with Planned Development Overlay; 425 Lake Shore Drive (Plan Commission recommends approval) BACKGROUND 425 Lake Shore Drive is currently the location of the City of Oshkosh Water Filtration Plant and Clearwells. The site is approximately 9.1 acres. The surrounding area is a mix of institutional, commercial and residential land uses. The applicant requests a zone change from the existing I Institutional District to I -PD Institutional District with a Planned Development Overlay. ANALYSIS The property consists of various features that comprise the City of Oshkosh Water Filtration Plant and Clearwells. The applicant is proposing to demolish the existing clearwells and replace them with new at -grade reservoirs, a high lift station, and an addition to an existing building for an intermediate pump station. The proposed renovations will require base standard modifications for the reduction of the required front yard setbacks for accessory structures. The renovations will also require a base standard modification to allow the proposed reservoirs, lift station, and pump station to exceed the maximum allowed height for accessory structures. These base standard modifications require a zone change from the Institutional District to the Institutional District with a Planned Development Overlay to accommodate these allowances that do not meet zoning ordinance standards. FISCAL IMPACT Changing the zoning as requested will have no fiscal impact as the underlying zoning is not changing. RECOMMENDATION The Plan Commission recommended approval of the zone change at its November 7, 2017 meeting. City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us Respectfully Submitted, /a Aw Darryn Burich Director of Planning Services Approved: Mark A. Rohloff City Manager City Hall, 215 Church Avenue P.O. Box 1 130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us ITEM: ZONE CHANGE FROM I INSTITUTIONAL DISTRICT TO I -PD INSTITUTIONAL DISTRICT WITH PLANNED DEVELOPMENT OVERLAY AND APPROVAL FOR A GENERAL DEVELOPMENT PLAN FOR PROPERTY LOCATED AT 425 LAKE SHORE DRIVE Plan Commission meeting of November 7, 2017 GENERAL INFORMATION Applicant: CH2M Hill Engineers, Inc. - Representative Property Owner: City of Oshkosh Actions Requested: The applicant requests a zone change from the existing I Institutional District to I -PD Institutional District with a Planned Development Overlay and approval for a General Development Plan for 425 Lake Shore Drive. Applicable Ordinance Provisions: The Zoning Ordinance does not establish criteria relative to appropriateness of changing zoning from one classification to another but relies on the Comprehensive Plan and good planning principles. Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Property Location and Type: 425 Lake Shore Drive is currently the location of the City of Oshkosh Water Filtration Plant and Clearwells. The site is approximately 9.1 acres. The surrounding area is a mix of institutional, commercial and residential land uses. Subject Site Existing Land Use Zoning Water filtration and clearwells I Adjacent Land Use and Zoning Comvrehensive Plan Land Use Recommendation Use ategory 10 & 20 Year Land Use Recommendation Public Institutional ANALYSIS Use/Site Design The property currently consists of low lift pump stations, rapid mix channels, flocculation basins, sedimentation basins, dual media filters, ozone contactors, granular active carbon (GAC) contactors, a chlorine contact / backwash supply basin, a backwash recovery basin, three finished water clearwells and two high lift pump stations. Two of the clearwells were constructed prior to 1915; the third was constructed in 1961. The applicant is proposing to demolish the three existing clearwells. Replacing them with two new at -grade reservoirs and a new high lift station. They are also proposing an addition to an existing building for an intermediate lift station. The proposed reservoirs are 35.5' in total height. Maximum height for an accessory structure in the Institutional District is 18'. A base standard modification will be required to allow the reservoirs to exceed 18'. The new high lift station is proposed to be 30' in total height and the addition for the intermediate pump station is proposed to be 31' in total height. Again, a base standard modification will be required to allow the proposed structures. The proposed north reservoir is shown at approximately 10' from the east property line, the proposed high lift station is approximately 19' from the east property line and the proposed south reservoir is approximately 17' from the east property line and approximately 6' from the south property line. Accessory structures have a 60' front setback and must be a minimum of 5' behind the primary structure. Due to the site having four front yards, a base standard modification will be required to allow accessory structures within the front setbacks. A 6' chain link with 3 strands barb wire is proposed around the facility. Code does not allow barb wire fencing unless the fencing meets the required primary building setback. Base standard modifications will be required to permit the barb wire fence along the property line and to allow a 6' fence along the front yards. The chain link fence will need to be galvanized or coated. The proposed use is permitted use within the Institutional District and is consistent with the public institutional recommendation in the 10 and 20 -year Comprehensive Plan Land Use Maps. Access/Parking The site will continue to use the five existing access points. Two along Linde Street, one along Washington Avenue and two along Lake Shore Drive. Signage A signage package was not submitted but will be required as part of the Specific Implementation plan. Landscaping A conceptual landscaping plan has been provided. The plan as shown, does not meet the zoning ordinance's landscaping standards. A final landscaping plan will need to be submitted as part of the Specific Implementation Plan. The final plan will need to include; building foundation, street Item— 425 Lake Shore Rezone & GDP 2 frontage and yard landscaping in accordance with the landscaping section of the zoning ordinance. Storm Water Management Storm water management plans will need to be reviewed and approved by the Department of Public Works as part of the Specific Implementation Plan and Site Plan review process. Building Elevations Conceptual building elevations have been provided. The applicant is proposing that the intermediate and high lift stations be constructed to complement the existing buildings. The applicant has proposed several options for the reservoirs after receiving initial feedback from a public meeting they held on October 16, 2017. The final building elevations will be approved as part of the Architectural Review and Specific Implementation Plan. FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends that Plan Commission make the following findings based on the criteria established by Chapter 30-387 (C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City's Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses, and development densities/intensities. (f) The proposed Planned Development project design does not detract from areas of natural beauty surrounding the site. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. Item— 425 Lake Shore Rezone & GDP 3 (j) For Planned Development projects that are proposed to be developed in phases, the applicant can provide a timeline for development and can demonstrate that the project would be successful even if all phases were not or could not be completed. Staff believes the development will be harmonious with the intended character of the general vicinity, and will not be detrimental to neighboring properties or the community as a whole. Staff recommends approval of the zone change from Institutional to Institutional with a Planned Development Overlay and approval of the Planned Development for a General Development Plan, with the findings listed above for the development as proposed with the following conditions: 1. Base Standard Modification to allow the proposed reservoirs and high lift station to be located within the required 60' front yard setback for accessory structures to 10', 19', 17 and 6' respectively. 2. Base Standard Modification to allow the proposed reservoirs, high lift station and intermediate pump station to exceed the maximum allowed height for accessory structures to total heights of 35.5', 30' and 31' respectively. 3. Base Standard Modification to allow a 6' fence within the front yards. 4. Base Standard Modification to allow a barb wire fence within the primary building setbacks. The Plan Commission approved a zone change from the existing I Institutional District to I -PD Institutional District with a Planned Development Overlay and approval for a General Development Plan as requested with conditions noted. The following is the Plan Commission's discussion on this item. Mr. Burich presented the item and reviewed the site and surrounding area as well as the land use and zoning classifications in this area. He explained that the zone change to a planned development overlay was required to allow for base standard modifications necessary for this development. He reviewed the history of the site and the site plan and discussed the proposed renovations, use of the site for the water filtration plant, and the structures that will include a new lift station and water reservoirs. He also reviewed the fencing and height of the structures which a base standard modification would be required for the height and location of the accessory structures however meeting the required setbacks on this property would not be possible due to the fact that it has street frontage on all four sides of the site. A base standard modification is also necessary for the fencing in the front yards as well as the inclusion of barbed wire fencing within the primary building setbacks. The development will be required to come back through the process for approval of the landscaping plan during the specific implementation plan approval and the building elevations will be discussed at a workshop today following the meeting. He reviewed renderings of the site and the fencing and the conditions recommended for this request. Mr. Thorns questioned why the barbed wire was required on this project and why we are not requiring slates in the fencing for screening purposes. Item- 425 Lake Shore Rezone & GDP Steve Brand, Utility Manager, stated that there is no barbed wire proposed for the site and that the fencing will not be slated due to security issues as the facility needs to able to be seen from the outside. He further stated that a general landscaping plan for the site was provided with landscaping on Washington Avenue with additional landscaping to be included with the specific implementation plan. He also discussed the fencing which is proposed to be black coated fencing with no slates for visibility purposes. Linda Mohr, CH2M Hill Engineers, the petitioner for this request, stated that black coated chain link fencing was installed on the site in 2008/2009 and they are only proposing to replace a portion of fence east of the clear wells along the lake shore that is still the older fencing and that the replacement of this section would allow it to match the existing fencing on the remainder of the site. Mr. Thoms commented that if no barbed wire was proposed to be used, condition #4 for the base standard modification could be removed from this request. Mr. Bowen questioned if a neighborhood meeting was held to discuss this proposal. Mr. Burich responded affirmatively. Ms. Mohr added that the city sent out letters to 75 neighboring property owners for a public meeting held on October 16th where they had a Power Point presentation of an overview of the project and discussed alternatives and impacts to the neighbors both during the construction phase and the visual impacts of the renovated site. She stated that the structures for the water reservoirs were necessary as they can no longer store water in tanks underground. Mr. Bowen then questioned if the neighboring property owners had a positive reaction to this development. Ms. Mohr responded that the property owners understood the concept and that she would share their comments regarding the appearance of the development and their responses at the workshop for this project following the meeting. Mr. Thoms stated that condition #3 should be modified to include that the 6' fence will be coated chain link and condition #4 should be removed as there would be no barb wire fencing on the site. Motion by Thoms to approve a zone change from I -Institutional District to I -PD Institutional District with Planned Development Overlay and a general development plan for property located at 425 Lake Shore Drive with the following revised conditions for the general development plan: Base Standard Modification to allow the proposed reservoirs and high lift station to be located within the required 60' front yard setback for accessory structures to 10 ; 19'1 17' and 6' respectively. Item— 425 Lake Shore Rezone & GDP 2. Base Standard Modification to allow the proposed reservoirs, high lift station and intermediate pump station to exceed the maximum allowed height for accessory structures to total heights of 35.5 ; 30' and 31' respectively. 3. Base Standard Modification to allow a 6' coated chain link fence within the front yards. Seconded by Vajgrt. Motion carried 8-0. Item— 425 Lake Shore Rezone & GDP SUBMITTO., CA City of Oshkosh Dept. ofCommunity Development ty 215 Church Ave., P.O. Box 1130 Goof Planned Development Application PHONE. 36- Oshkosh,W151 Oshkosh HONE 5059 For General Development Plan or Specific Implementation Pian "PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: Linda Mohr, P.E./CH2M HILL Engineers, Inc. Date: Petitioner's Address: 135 S. 84th Street, Suite 400 City: Milwaukee State: WI Zip: 53214 Telephone #: ( 411 847-0205 Fax: ( 414) 454-8793 Other Contact # or Email: Imohr@ch2m_com Status of Petitioner (Please Check):: ll Owner V -Representative l -,:Tenant o Prospective Buyer ` Petitioner's Signature (required): l Date: Ct► OWNER INFORMATION Owner(s): Steve Brand, City of Oshkosh Public Works Utilities Bureau Manager Date: Owner(s) Address: 215 Church Avenue, PO Box 1130 City: Oshkosh State: WI Zip: 54903-1130 Telephone #: ( 920) 232-5362 Fax: ( 920) 232-5366 Other Contact it or Email: sbrand@ci.oshkosh.wi.us Ownership Status (Please Check): 0 Individual r= Trust :l Partnership 0 Corporation VOther (Public Water System) Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may; in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. r Property Owner's Signature: � ' �€'�`"�°� I ° '-� Date: 7 � �" -° ` t TYPE OF REQUEST: VGeneral Development Plan (GDP) O General Development Plan (GDP) Amendment I] Specific Implementation Plan (SIP) ❑ Specific Implementation Plan (SIP) Amendment SITE INFORMATION City of Oshkosh Water Filtration Plant Address/Location of Proposed Project: 425 Lake Shore Drive, Oshkosh, Wt 54901 Proposed Project Type: Large Scale Public Services and Utilities Current Use of Property: Public water supply, treatment and conveyance Zoning: I Land Uses Surrounding Your Site: North: I South: SR9-LRO and UMU-PD East: I West: SR9-LRO ➢ it is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal. r> Application fees are due at time of submittal. Make check payable to City of Oshkosh, Please refer to the fee schedule for appropriate fee, FEE IS NON-REFUNDABLE For more information please visit the City's website at wvwv.ci.oshkosh.wi.us/Comrnunily_Development/Planning.htni Staff Date Rec'd t l I� City of Oshkosh Water Filtration Plant Clearwelis Replacement Project Planned Development Application Attachment. ✓ A full size (24" X 36") hard copy plan set including the required plans listed below and a digital plan set. Paper and electronic copies of the Waler Filtration Plant Ciearwells Replacement Project Drawings are submitted with this Application. ✓ General location map of the subject site depicting: All lands for which the Planned Development is proposed and other lands within 1.00 feet of the boundaries of the subject property; Current zoning of the subject site and abutting properties, and the jurisdiction(s) that maintains that control; A graphic scale and north arrow, Refer to attached Figure PD -1. ✓ Generalized site plan showing the pattern or proposed land uses; Including; General size, shape, and arrangement of lots and specific use areas; Basic street pattern and pattern of Internal drives; General site grading plan showing preliminary road grades; Basic storm drainage pattern, including proposed on-site stormwater detention; General location of recreational and open space areas, including designation of any such areas to be classified as common open space. The Water Filtration Plant (WFP) property is all of lots 28 and 29 block 37 Evans addition. The street pattern, pattern of internal drives, site grading, and stormwater management features are shown on the WFP Clearwelis Replacement Project civil drawings. There will be no stormwater detention facilities, recreational areas, or open space area on the WFP site. ✓ Statistical data, including: Minimum lot sizes in the development; Approximate areas of all lots; Density/intensity of various parts of the development; Building coverage; Landscaping surface area ratio of all land uses; Expected staging. The WFP property is not being developed into lots of varying density. The Poject involves constructing new structures on top of existing structures. The current WFP property building and impervious pavement area coverage is 40%; the current landscaped area is 60%. The proposed WFP property impervious area coverage is 45% the planned landscaped area is 55%. ✓ Conceptual landscaping plan. Refer to the attached project renderings and Project Drawings 005-L-201 and 005-L-501. NA General signage plan. No changes to WFP property signage are associated the Project. NA General outline of property owners association, covenants, easements, and deed restrictions. Property restrictions as described above do not apply to the WFP site, ✓ A written description of the proposed Planned Development, including; General project themes and images; The general mix of dwelling unit types and/or land uses; Approximate residential densities and nonresidential Intensities; General treatment of natural features; General relationship to nearby properties and public streets; General relationship of the project to the Comprehensive Plan or other area plans; Proposed exceptions from the requirements of the Zoning Ordinance. The Project is comprised of new water pumping and storage facilities designed to resemble the Water Filtration Plant. Renderings of the proposed project facilities are attached to this application. The Material Board of buildings' exterior finishes is available in the Department of Public Works offices. The project is comprised of water utility (Public, institutional) facilities that do not include dwelling units. The landscaped areas of the project site are designed to achieve the City's stormwater management and site aesthetic goals. The WFP site is secured and access from nearby properties and public streets is controlled to protect public health and safety. The Comprehensive Plan and approved 2035 Land Use Plan include the continued used of the WFP'site _forwatersupply and treatment. The proposed exceptions from the Zoning Ordinance include (1) portions of the proposed new water storage reservoirs are within the required 30 -feet setback from the property lines and (2) the existing southeast corner of the site and the proposed new southeast corner of the site include a vision corner that does not meet zoning requirements. NA Traffic Impact Analysis (TIA), if deemednecessary by the Director of Planning Services, or designee. The Project will not result in changes to local traffic. Temporary project construction traffic will use City of Oshkosh Designated Truck Routes. C & City of Oshkosh Application SUBMtrTO: CityW Dept. of Community Development of Zoning Map Amendment (Rezoning) 215 Church Ave., P.O. Box 1130 Oshkosh Oshkosh, Wisconsin 54903-1130 PHONE: (920) 236-5059 "PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: Linda Mohr, P.E,/CH2M HILL Engineers, Inc. Date: Petitioner's Address: 135 S. 84th Street, Suite 400 City. Milwaukee state: W Zip: 53214 Telephone #: ( 414 847-0205 Fox:( 41f 454-8793 Other Contact # or Email: Imohr@ch2m.com Status of Petitioner (Please Check): o Owner VRepresentative Tenant 0 Prospective Buyer p Petitioner's Signature (required): '-' Dote: ` ' j ;u)q OWNER INFORMATION Owner(s): Steve Brand, City of Oshkosh Public Works Utilities Bureau Manager Date: Owner(s) Address: 21.5 Church Avenue, PO Box 1130 City: Oshkosh State: WI zip: 54903-1130 Telephone #: ( 92Q _232-5362 Fax: (920) 232-5366 Other Conlaci # or Email:sbrand cnr ci.oshkosh.wi.us Ownership Status (Please Check): i i Individual r Trust ❑ Partnership c..corporation V Other (Public Water System) Property Owner Consent. (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning�ervices Division for incomplete submissions or other administrotive reasons.. Property Owner's Signature:,, Date: ZONING AND DEVELOPMENT INFORMATION Address/Location of Rezoning Request: 425 Lake Shore Drive, Oshkosh, WI 54901 Tax Parcel Number(s): 1100950000 Rezone property from: Purpose for Rezoning: To provide design implementation flexibility given parcel features four front yards and limits right-of-way placement alternatives. Describe existing property development and land use., The Water Filtration Plant supplies potable water to the City of Oshkosh. Describe proposed development and/or proposed land use: The. Water Filtration Plant will be modified to potable water to the City of Oshkosh with facilities that comply with current state statutes. Proposed time schedule for development and/or use of the property: The Clearwells Replacement Project construction is scheduled for 2018 2020. The Water Filtration Plant will continue to supply potable water during and after construction. Zoning Adjacent to the Site: North: South'. SR9-LRO and UMU-PD East: I West: SR9-CRO Staff Date Recd U131i-, q City of Oshkosh Water Filtration Plant Clearwells Replacement Project Narrative Background The City of Oshkosh (City) owns and operates a 16 -million gallon per day (mgd) Water Filtration Plant (WFP). The WFP is located at 425 Lake Shore Drive. The surrounding land uses include institutional (public recreation), residential and commercial. The WFP property has served as the location for water supply and treatment facilities since the late 1800's. The WFP property will continue to be used to supply potable water to the City during and following construction of the Clearwells Replacement Project. The WFP treatment and conveyance facilities include low lift pump stations, rapid mix channels, flocculation basins, sedimentation basins, dual media filters, ozone contactors, granular activate carbon (GAC) contactors, a chlorine contact /backwash supply (CT/BWS) basin, a backwash recovery basin, three finished water clearwells, and two high lift pump stations. Two of the clearwells (buried potable water storage tanks) were constructed prior to 1915; the third, in 1961. fn 2007, the Wisconsin Department of Natural Resources (WDNR) conducted a sanitary survey of the City's water system and determined the WFP clearwells do not comply with several provisions of the current Wisconsin Administrative Code Chapter NR 811, Requirements for the Operation and Design of Community Water Systems (NR 811). The clearwells were cited as a "deficiency" because they are located below groundwater level and do not have a sloped top or membrane cover. A "deficiency" is defined as a problem in the drinking water system that has the potential to cause serious health risks or to present long-term health risks to consumers. Corrective action must be taken to address a deficiency and the WDNR recommended the City plan to upgrade or replace the clearwells. Clearwells Replacement Project The purpose of the Clearwells Replacement Project is to address the following concerns: • Protection of public health. The clearwells and High Lift Pump Station (HLPS) wet wells do not comply with NR 811 and present a potential serious public health risk. • Maintain reliable customer service. Reliable finished water storage and conveyance facilities, supported by adequate emergency power generation and electrical power distribution, are essential for maintaining customer service. • Replacement of aging infrastructure. Two of the existing clearwells and some of the WFP buried finished water yard piping are over 100 years old and beyond their useful life. While they have been well maintained, they are beyond their useful life. The Clearwells Replacement Project is comprised of the following major components: • Demolition of three buried clearwells • Construction of two new at -grade 1 MG capacity reservoirs with former clearwell footprints • Construction of a new 16-mgd capacity intermediate lift station to fill the new reservoirs • Construction of a new 16-mgd capacity high -lift pump station to convey water from the new reservoirs to the distribution system • Demolition of the existing high -lift pumping systems 65 i Replacement of two existing 750 kilowatt (kM emergency generators with two new 1,000 kW generators; new electrical switchgear, transformers and automatic transfer switches • Sitework, buried yard piping and utilities, access roads, landscaping, and security fencing The project will be implemented in a single construction contract. The proposed project schedule is January 2018 through July 2020. There are 13 WFP employees, no daily customers, and no residents. The completed project will not change these WFP occupancy values. The completed project will not change the volume or pattern of vehicular traffic associated with operating and maintaining the WFP. During project construction, traffic will comply with City of Oshkosh -designated truck routes and will be managed to conform with City requirements and construction permits The completed project does not generate noise, glare, odors, or vibrations. However, the completed project will have a significant visual impact because new water storage and pumping facilities are located at grade and above 100 -year flood elevation to meet state statute. During project construction, environmental impacts will be controlled to levels allowed by City and state construction permits. q .L _ ' • ZONING: . " - O dOahkeN Sln PI•nAwlrw and >lanned Dwalo men[Daw Summar ' .." .. .. _ , I Pm CI ni Dahkoahwautq«nuOn Plan Pro Atlareci AZr W Ye Shom Dder D h—h WIS n Pro n L. al0nctrl o Nl el bn PaeM>ObIxY I][wn, eddluan • MORRIrtAVOJUC �PRtVCRTY UNL'JRCKY TaK Ks Number iltllP'IIPPD Teu1Pro a Area l cf? k _-7-_=l•s.— . ��''� Im MwtAr•a md•vlo m•nt 35 4 a lr -IiY yID,A, Pwrwnt kR nrvbuaAoa ndwab meN 6010 _ - _ - "' :,:' `'�� ��: WDC U Wndw dArna rndmmla m•nt J]9 ]LT. I -'' Perbnt Wnds dAr•a Iedereb mmt f4% `, `' r' I .: 1Im rvlou,Aroa ttdeveb m.nt Mm'. I, i CCUR60 Cmr-TC v.a.nr un . rvava Ae• ara.weo .� -- Wna,�a •d Ama ttd.e. xiA Ta] « ent Wnd,u stl Aro. e,adaawlo moot SSX I DI rurb•d Mn. Dud Wncfmttlon 3Yl « �;• �X Wcte ��:� x M'2^c 6 w wLnl Pcr Lnc 'P NO ':i: Khat PADr t N ii �J a`�'i • - �.%OVlIlMTlI-0014'?,'.�� �w' ^+lyS`' .i„;.. _ 1 ;va'ea; aAre ••rILTWTWtf :� I - ,tib;::f� �CPCNTRY c;ti�� • LAKE WINNESAGO N - 0 YL v Ra uN ow - p uIt 'd _t'• u _r :a :fl > ROP tbiC/ CRT, itrr. a �1 i _ Puw. :•i.''t'} - �.c::• it-... - S - -�UA. - Mi ixA I' C�ypqHSCr.. LOW n+ - _ uwxuwcrcNcc .:VAULT. • r IPP too WAPNINOTONAVINNC FA-K—UNC1RaN OeeMeodTMaATC (JO 7.-w 1 W VIOIONCORNCR P�`BNING: SRR•L O 1 � ( ZONING: UUM!» PD FIGURE PD -1 GENERAL LOCATION MAP WATCR FILTWTION PLANT CLC. WML RCPMCCMCNT PRCJCCT f zm- riww-,, PwRr-PP•I 3 NO.9 GALV WIRE CLIP SPACE 12' MAX iRl BOTTOM TIE TO 9E 1p` MAX ABOVEGROUND LINE P03T CONNECTION 3 8TRANOS TOP RAIL. BARBED WIRE, IF SPECIFIED -x IF SPECIFIED LINE PO$T---m. ` DRACE TRUSS 1106-- - 9" tilA CONG TENSION - { BASE, TYP�-� WIRE NO. T f0.0' h1AX ' PULL POST POST 16' DIA CONC SPACING SPACING PULL BASE TYPICAL PULL POST 3 STRANDS BARBED WIRE, TOP RAIL, IF SPECIFIED-- IF SPECIFIED - CORNER POST, TY -P— STRETCHER BANDS, TYP- 1s' AIA CONC CORNER BAS CHAIN LINK FENCE NTS d NO.0 GALV WIRE CLIP SPACE 24'?MX TOP RAIL CONNECTION 2" CHAIN LINK FABRIC, / OR AS SPECIFIED KO , 1. BRACE AND TRUSS ROD REQUIRED AT GATE$ AND $IbE OF ALL CORNER POSTS, 2. FABRIC ATTACHED TO OUTSIDE OF POSTS. r CHAIN LINK FABRIC, OR AS SPECIFIED ug ON Q r POST fvf TRS ROD ASSEMBLY f0.0' h1AX _ IY-0' TENSION WIRE POST 0' DIA CONCC BA$E,,YP SPACING SPACING TYPICAL CORNER POST 3231-410 GDP,SIP,REZONE JEFFREY A SCHINKER THOMAS A/JENNIFER L BOYD 425 LAKE SHORE DR WATER FILTRA 1324 WASHINGTON AVE 1325 WASHINGTON AVE PC: 11-07-17 OSHKOSH WI 54901 OSHKOSH WI 54901 ANDREW HAESE KATHLEEN E CORLEY/DAVID LUANNE M LAIB 1337 WASHINGTON AVE A 1343 WASHINGTON AVE 1347 WASHINGTON AVE 1343 W OS14KOSI-I WI 54901 OSHKOSH WI 54901 OSHKOSH WI 54901 ANDREW C/NOEMI SMOOT STEPHEN EC/ANNE M HINTZ PATRICK F HUGHES/S M ANDERSON 1355 WASHINGTON AVE 1361 WASHINGTON AVE 1369 WASHINGTON AVE OSHKOSH WI 54901 OSI-IKOSH WI 54901 OSHKOSH WI 54901 WFW ENTERPRISES LLC KELLY LUADERS 2009 TRUST RYAN L/SAMANTHIA R SKIVER 1373 WAUGOO AVE 1600 RIVER MILL RD 2359 SPRING MEADOW DR OSHKOSH WI 54901 OSHKOSH WI 54901 NEENAH WI 54956 DYLAN CHUMURA- AMY J THOMPSON NOVA 3 LLC MOORE/SHARON TENHUNDFELD 421 LINDE, ST 429 LINDE ST A 415 LINDE ST OSHKOSH WI 54901 OSHKOSH WI 54901 OSHKOSH WI 54901 HENRY C MATI-iEWSON JUDITH K BRITTON IRENE G BINDER REV TRUST 433 LINDE ST 437 LINDE ST 447 LINDE ST OSHKOSH WI 54901 OSHKOSH WI 54901 OSHKOSH WI 54901 CH2M HILL ENGINEERS INC CITY OF OSHKOSH JENNIFER A ZIEMER ATTN LINDA MOHR PO BOX 1130 1321 WASHINGTON AVE 135 S 84TH ST STE400 OSHKOSH WI 54903 OSHKOSH WI 54901 MILWAUKEE WI 53214 STEVENS PARK NEIGHBORHOOD MENOMINEE SOUTH NEIGHBORHOOD RON & LTL HANSCHE CYNTHIA THORP 52 EVELINE ST 1107 MERRITT AVE OSHKOSH WI 54901 OSHKOSH WI 54901 rz 1255 1261 I263 L267 li7271 1276 _.L7 F-RRIT-T-AV INGTON Li nu,utt /Hl < .......... R", 11110 M WINNEBAGO N MEN I In = 0,03 mi I in =170 ft 001% City ofOshkosh maps and data are intended toboused fa general identification purposes only, and city the City of Oshkosh assumes no labTay for the accuracy of the information. 70M using the Printing Date., 10/20/2017 0 information are responslVe for verifyinga=faq. For full discidmer please go to Oshkosh w.ii,t.cLoshkosh.wi.usiGIScgs&niex Prepared by: Cil:y of Oshkosh, W1 JAGNP1ann*nQT1an Cornrnis:�nSito Plan MaoTemoJalleul`lan Commission Site Pian hiapTemplate.nud User. W$eb ■ � � 1111 11! ■� ��� � - ------ 161 e _ .11,1-�. I ( • ' 1in=0.11 mi, _!.. i. t" r z._.i . a ..+,S.l..='.�....,.,y�.� <.,v•ir1 wi- 1 in = 600 0 City of Oshkosh maps and data are Intended to be used for general identification purposes only, and Cily the Gty of Oshkosh assumes no 9ablity for the accuracy of the Information. Those using the of Printing Date: 10/2012017 information are responsfUe for vedfybg accuracy: For full disddmer please go to pshkash vvw.ci.oshkosh.vri.us/GiSdisdaimer Prepared by: City of Oshkosh, WI JAGWfanniny lan CommissW Site Flan Map Temaa:elP an Commssvn SAO Plan Map Templata.mxd User, Web f4 City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkosh assumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. For full disclaimer please go to www.ci.oshkosh.wi.us/GlSdisclaimer M t N 1 in=0.02 mi 1in= 130ft Printing Date: 10/20/2017 Oshkosh Prepared by: City of Oshkosh, WI fi