HomeMy WebLinkAbout35. 17-533 OCTOBER 24, 2017 17-533 RESOLUTION (CARRIED 5-1 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 17-03 TO MIRON CONSTRUCTION CO., INC. FOR MARY JEWELL LIFT STATION & PARK SHELTER ($2,981,403.60) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for Mary Jewell Lift Station and Park Shelter; and WHEREAS,upon the opening and tabulation of bids,it appears that the following is the most advantageous bid: MIRON CONSTRUCTION CO., INC. PO Box 509 Neenah, WI 54957-0509 Total Bid: $2,981,403.60 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same,all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 551-1910-1799-00000 Sewer Utility- Construction in Progress 325-0610-7214-07702 Park Improvement - Buildings City of� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works G' I v F DATE: October 19, 2017 RE: Award Bid for Public Works Contract No. 17-03 Mary Jewell Lift Station and Park Shelter Miron Construction Co., Inc. / ($2,981,403.60) BACKGROUND The purpose of this project is to construct a new lift station and restroom with a park shelter at Mary Jewell Park. The lift station is needed in order to abandon a temporary sanitary sewer siphon under Sawyer Creek, at Dove Street. The siphon was created in 2012, during the Sawyer Creek dredging project, to remove the sanitary sewer pipe and pilings from the creek. The pipe and pilings were located within the channel and created an obstruction to the creek flow. The temporary siphon requires a very high maintenance effort to keep it from clogging and does not have enough capacity to prevent basement backups during heavy rains. The new lift station will replace the existing lift station located on Punhoqua Street, near Rainbow Drive. ANALYSIS Engineering staff reviewed two bids. The low bid was received from Miron Construction Co., Inc. of Neenah, Wisconsin. The total bid is $2,981,403.60. This price includes constructing the building to look similar to the recently -constructed restroom facilities in Menominee Park, Stevens Park, South Park, and along the Riverwalk, at the end of Michigan Street. The Plan Commission has requested additional architectural enhancements be made to the structure. These include, at a minimum, different fagade materials and colors, and additional dormers and windows. The Department of Public Works will work with the Design Engineer, Parks Department, and the Contractor to develop alternatives for the Plan Commission to consider. Any changes to the structure will likely result in a change order to this construction contract, requiring Common Council approval. The timing of this project is critical. Substantial delays in the construction of the lift station will not allow for the construction of the sanitary sewers in this area during the 2018 construction season. The first several months of the project will involve excavation and construction of the underground wet well, allowing time to resolve the architectural issues. 1: \ Engineering \ 2017 CONTRACTS \ 17-03 Oshkosh Ave Page 1 of 2 Swr \ Project_Information\ Correspondence \ Memo \ 17-03 Memo for Bid Award_10-19-17.docx FISCAL IMPACT Funding for the project is in the 2017 Capital Improvement Program (CIP). Following is a summary of the available funds and the construction costs, including engineering fees. This project was originally budgeted in the Public Infrastructure Improvements - Wastewater Utility and Park Improvements sections of the 2017 CIP for $4,073,100. An additional $483,000 is available from funds previously borrowed for the Public Infrastructure Improvements - Wastewater Utility section of the 2017 CIP. The construction costs also include $225,000 previously authorized by the Common Council for design and bidding services, and an estimated $590,000 for construction documentation and monitoring services. The construction and documentation services agreement will be presented for approval by the Common Council at a future date. CIP Section CIP Funds Budgeted Construction Costs with Engr Public Infrastructure Improvements - Wastewater Utility $4,356,100 $3,705,092 Park Improvements $175,,0001 $175,000 Totals $4,531,1001 $3,880,092 RECOMMENDATIONS I recommend award to the low bidder, Miron Construction Co., Inc. in the amount of $2,981,403.60. Approved: Mark A. Rohloff City Manager SMG/tlt 1AEngineering\2017 CONTRACTS\17-03 Oshkosh Ave Page 2 of 2 Swr\ Project -Information \ Correspondence \ Memo \ 17-03 Memo for Bid Award_10-19-17.docx Contract 17-03 - Mary Jewell Lift Station dr Park Shelter (15379419) Owner. City of Oshkosh, WI Solicitor AECOM Bid Opening: 10/17/201710:00 AM CDT rage l of 3 w/17/2017 Miran Construction Co., Inc. Advance Construction Inc PO Box 509 Neenah, WI 54957-0509 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1 $2,981,403.60 $2,994,705.80 Removing pavement, 1100 complete as specified Square Yards 300.00 $2.36 $708.00 $8r00 $2,400.00 7" concrete pavement; with 5" CABC and grading; complete 1301 ass specified Square Yards 550.00 $72.32 $39,776.00 $60.00 $33,000.00 Sawing existing pavement; 1700 Cora fete ass dfied Linear Feet 250.00 $3.15 $787.50 $355 $887.50 2" asphalfic surface LT with 6" CABC and grading 1917 complete ass specified are Yards 400.00 $24.94 $9,976.00 $30.00 $12,000.00 Furnish and install 12" storm 2003 sewer; complete ass cified Linear Feet 70.00 $78.75 $5,512.50 $88.00 $6,160.00 Furnish and install Type 1 inlet (with 18" sump); 2235 complete asspecified Each 1.00 $2,415.00 $2,415.00 $2,200.00 $2,200.00 Furnish; install; maintain; and remove Type D modified inlet protection; complete as 2508 specified Each 10.00 $152.25 $1,522.50 $130.00 $1,300.00 Sediment removal - Type D modified inlet protection; 2510 complete asspecified Each 10.00 $52.50 $525.00 $40.00 $400.00 Furnish; install; maintain; and remove stone tracking 2512 1 pad; complete as specified Each 1.00 $3,307.50 $3,307.50 $2,500.00 $2,500.00 Furnish; install, maintain; and remove At fence; 2514 complete as specified Linear Feet 900.00 $3.68 $3,312.00 $2.50 $2,250.00 Install salvaged topsoil 6" 2602 depth; complete as specified Square Yards 1 2,400.00 $4.78 $11,472.00 $5.00 $12,000.00 Furnish and install native seeding; complete as 2610 specified Square Yards 2,100.00 $2.36 $4,956.00 $2.25 $4,725.00 Furnish and install annual cover crop; complete as 2624 lspccified Square Yards 2,400.00 $0.42 $11008.00 $0.40 $960.00 Furnish and install Moist Meadow - Rain Garden Seed; 2625 complete as spedfied Square Yards 300.00 $2.36 $708.00 $2.25 $675.00 Furnish and install grass 2629 s; complete as specified Square Feet 1 2,200.00 $14.28 $31,416.00 $13.00 $28,600.00 Furnish and install hydraulically -applied erosion control product; complete as 2644 Ispecified Squaw Yards 2,400.00 $0.68 $1,63200 $0.65 $1,560.00 Connect to existing storm e manhole; complete as 2856 specified Each 1.00 $1,470.00 $1,470.00 $1,500.00 $1,500.00 Strip and stockpile topsoil; 2902 complete as specified Square Yards 3,085.00 $4.36 $13,450.60 $2.50 $7,712.50 Furnish and install 8" sanitary sewer (new); 3030 complete as specified I Linear Feet 15.00 $262.50 1 $3,937.50 $500.00 $7,500.00 rage l of 3 w/17/2017 Contract 17-03 - Mary Jewell Lift Station & Park Shelter (=5379419) Owner. City of Oshkosh, WI Solicitor. AECOM Bid Opening: 10/17/201710:00 AM CDT Page 2 & 3 10/17/1017 Miran Construction Co., Inc. Advance Construction Inc. PO Box 509 Neenah, WI 54957-0509 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and nista sanitary sewer; DIP with tracer wire and include 3 - 45 degree mega hrg connections; and all mega lug connections as needed from 10' from the building to 8" HDPE; 3031 complete asspecified Linear Feet 140.001 $102.90 $14,406.00 $250.00 $35,000.00 Furnish and install 12" sanitary sewer (new); 3034 complete as specified Linear Feet 220.00 $336.00 $73,920.00 $468.18 $102,999.60 Furnish and install 8" sanitary sewer drop; 3060 complete as specified Vertical Feet 10.00 $136.50 $1,365.00 $500.00 $5,000.00 Furnish and install standard sanitary sewer manhole (4' diameter); complete as 3100 specified Vertical Feet 75.001 $630.00 $47,250.00 $413.00 $30,975.00 Furnish and install external sanitary wwer manhole chimney seal; complete as 3114 specified Each 4.00 $420.00 $1,680.00 $400.00 $1,600.710 Furnish and install 12" x 4" sanitary sewer factory wyes 3204 or tees; complete asspecified Each 1.00 $525.00 $525.00 $200.00 $200.00 Furnish and install 4" sanitary sewer riser (new); 3231 m fete asspecified Linear Feet 6.00 $52.50 $315.00 $175.00 $1,050.00 Famish and install sanitary sewer lateral marker balls; 3236 m fete as specified Each 1 8.001 $52.50 $420.00 $30.00 $240.00 Core into existing manhole; 3332 !complete as specified I Each 1.00 $1575.00 $1,575.00 $2,000.00 $2,000.00 Page 2 & 3 10/17/1017 Contract 17-03 - Mary Jewell Lift Station & Park Shelter (#5379419) Owner. City of Oshkosh, WI Solicitor. AECOM Bid Opening: 10/17/201710:00 AM CDT Page 3 of 3 10WIN17 Mimn Construction Co., Inc. Advance Construction Inc. PO Box 509 Neenah, WI 54957-0509 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Prim Extension Famish and construct lift station and park shelter facility; complete as specified; nchrding "A" items from Major Equipment Schedule (inclusive of: sign relocation; temporary site safety fence; oak treet removal; abandonment of two (2) groundwater monitoring wells; foundation excavation; backfilling; structure; adjoining concrete slabs and approaches; site landscaping bushes; and mulch; all electrical (including pull box on extra conduit and transformer pad); mechanical; HVAC; and control features and equipment; all building internal/external connections to water; sanitary; (extended 10' from the building for influent and form main); gas; and including conduit /wiring from transformer. Include site dewatering and storm water management; mobilization/demobilization; bonds; insurance; and all 3998 incidental costs) Lump Sum 100 $2,647,025.00 $2,647,025.00 $2,613,100.00 $2,613,10000 and install sanitary sewer form main (new) HDPE; SDR 19 with tracer wire; pipe insulation; and inside drop including all supplies; labor; and materials in MH - W-21 (SE - property); 3999 complete as specified Linear Feet 440.001 $91.35 $40,19400 $127.73 $56,201.20 Famish and install 2" water se m (new); complete as 4046 cified Linear Feet 180.(p $74.55 $13,419.00 $94.50 $17,010.00 Famish and install 2" corporation and stop box; 4053 mm lete as specified Each 1.00 $1,417.50 $1,417.50 $1,000.00 $1,000.00 Base Bid Total: $2,981,403.60 $2,994,705.80 Page 3 of 3 10WIN17