Loading...
HomeMy WebLinkAbout34. 17-532 OCTOBER 24, 2017 17-532 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE PURCHASE OF CONICAL SECTION FOR CENTRIFUGE NO. 1 FROM ALFA LAVAL, INC. ($43,586.94) INITIATED BY: PUBLIC WORKS WHEREAS, the Conical Section for Centrifuge No. 1 for the Wastewater Treatment Plant for dewatering biosolids as part of the treatment process is failing and in need of replacement; and WHEREAS, this part is only available through Alfa Laval. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized and directed pursuant to Section 12-11 of the Oshkosh Municipal Code to purchase a Conical Section: ALFA LAVAL, INC. 3944 Holland Blvd Chesapeake, VA 23323 Total: $43,586.94 BE IT FURTHER RESOLVED that the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same. Money for this purpose is hereby appropriated from: Acct. No. 551-1910-1799-00000 Sewer Utility- Construction in Progress City Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Stephan M. Brand, Public Works Utility Bureau Manager :5M(31TZ;T- DATE: October 19, 2017 RE: Approve Purchase of Conical Section for Centrifuge No. 1 from Alfa Laval, Inc. ($43,586.94) BACKGROUND The Wastewater Treatment Plant has two (2) Alfa Laval centrifuges that are used for dewatering biosolids as part of the treatment process. These centrifuges were originally installed in 1996 and have been maintained and upgraded, as needed. The biosolids are beneficially re -used by application to agricultural fields in strict compliance with Wisconsin Department of Natural Resources requirements. A recent inspection of Centrifuge No. 1 has shown that the conical section is worn out and in need of replacement. A similar replacement was performed on Centrifuge No. 2 in 2016. ANALYSIS This part is only available through Alfa Laval and is manufactured at their facility in England. The estimated lead time is fourteen (14) weeks. Once this part is received, it will need to be installed at a facility that specializes in centrifuge repairs and maintenance. A separate request will be prepared for the installation of the conical section and related work. FISCAL IMPACT Funding is available in the Wastewater Utility Major Equipment Replacement section of the 2017 Capital Improvement Program. RECOMMENDATIONS Chapter 12 of the Municipal Code of the City of Oshkosh provides that services of a specialized nature, including purchases, may be made without a formal competitive bidding process when the purchase is from only one source of supply or when standardization or compatibility is the overriding consideration. I have reviewed the proposal and, in accordance with Section 12-11 of the Code, I am hereby recommending the Common Council approve this purchase. Approved, Mark A. Rohloff City Manager SMB/tlt 1:\ Engineering\ Tracy Taylor\Memos to Mayor & Common Council\2017\Appr Purch of Centrifuge Conical section -Alfa Laval_10-19-17.docx