Loading...
HomeMy WebLinkAbout08. 17-506 OCTOBER 24, 2017 17-506 RESOLUTION CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE REVISED CONDITIONS OF SPECIFIC IMPLEMENTATION PLAN FOR A VEHICLE CHARGING STATION AT 2415 WESTOWNE AVENUE INITIATED BY: COMMUNITY DEVELOPMENT DEPARTMENT WHEREAS, Resolution 17-501 approved by the Common Council on October 10, 2017 approved an amendment to a general and specific implementation plan to install electric vehicle charging stations at 2415 Westowne Avenue and included the following condition of approval: 1) Base standard modification to allow the proposed 288 sq. ft. EMC to exceed the 100 sq. feet maximum allowed. And WHEREAS, it has come to staff's attention that this condition does not pertain to the request for electric vehicle charging stations at 2415 Westowne Avenue. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the previous condition of approval as noted above is hereby rescinded for the specific implementation plan amendment at 2415 Westowne Avenue for installation of electric vehicle charging stations. BE IT FURTHER RESOLVED that the following conditions for installation of an electric vehicle charging station at 2415 Westowne Avenue are hereby approved: 1) Base standard modification to allow placement of utility equipment not less than 12 feet from the right-of-way of N. Westhaven Drive whereas 25 feet is required; 2) The three trees identified to be removed shall be replaced with the same or similar species on the site as approved by the Department of Community Development; 3) A total of eight charging stations may be constructed, six with the initial phase and two additional stations as needed; 4) Verification that the location of the proposed vegetative screen will not interfere with existing private underground utilities. TO: Honorable Mayor and Members of the Common Council FROM: Darryn Burich Director of Planning Services DATE: October 19, 2017 RE: Approve Revised Conditions of Specific Implementation Plan for a Vehicle Charging Station at 2415 Westowne Avenue (Plan Commission recommends approval) BACKGROUND On October 101h, Council approved the Specific Implementation Plan for a Vehicle Charging Station at 2415 Westowne Avenue. It came to staff's attention that the wrong conditions were placed on the resolution. In order to correct the mistake, staff is requesting Council approve the revised conditions as approved by Plan Commission at the October 3, 2017 meeting. FISCAL IMPACT The installation of the charging stations to the site is more of an accessory use and will not require or have any impact on city service provisions. RECOMMENDATION Council approve revised conditions for the Specific Implementation Plan for a Vehicle Charging station at 2415 Westowne Avenue. Res tfully Submitted, #IA,� Darryn Burich Director of Planning Services Approved: Mark A. Rohloff City Manager City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us OCTOBER 10, 2017 17-501 RESOLUTION CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE SPECIFIC IMPLEMENTATION PLAN AMENDMENT FOR PLACEMENT OF AN ELECTRIC VEHICLE CHARGING STATION AT 2415 WESTOWNE AVE INITIATED BY: SARAH VARRECCHIA, GDP GROUP PLAN COMMISSION RECOMMENDATION: Approved w/conditions WHEREAS, Council previously approved a Planned Development in 2000 for a Festival Foods grocery store followed by a Planned Development Amendment in 2006 to allow a store addition; and WHEREAS, the applicant would like to install an electric vehicle charging station along the periphery of the existing parking lot adjacent to North West Haven Drive utilizing the established parking stalls; and WHEREAS, the Plan Commission finds that this amendment to install an electric vehicle charging station to the previously approved general and specific implementation plan at 2415 Westowne Avenue, is consistent with the criteria established in Section 30- 387(6) of the Oshkosh Zoning Ordinance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the amendment request to install an electric vehicle charging station to the previously approved general and specific implementation plan at 2415 Westowne Avenue, per the attached, is hereby approved with the following conditions: 1) Base standard modification to allow the proposed 288 sp. Ft. EMC to exceed the 100 sq. feet maximum allowed. M.Ilov .. . +tW - 1,-1- . . . ` A I � I-- Tv i !:I 2 •jij- gg 4i 1Y NN .4i .. .. ... .. .. 1.0 ER • �, _0 t� w INS el 1W.,• M.N. W mii� min; x.,1,;i, MIR �?!j'IT'jV;f lz=,c T :i J.SE, U... 5ki. s.V rp.4 NN�LI X ........... rt V. q, IM q.115 Pr��, � W-11 1 .4 SIM , n• "M 'P kgi MM . RON AN gA ; �i, Q!, . si..; 1!!.j i!i I -�d.' i 1 t-,, i iq v 32 it , M LgF. 161M -1 il�i ngFig, s A 1P. Cdr? -4 1 T 1 !T ;fiji Ft.,� j.r is -,j 'Y g 4 n.V�N V�N� V�N� V�Vf` s; MEN '3 .1061.', Jj - 641 4� -I-i; 1.1 lit- Pq m A In gg PENN, P it I MINE 141 ,SJ'14111;i i".1 IRA jr. nu -pgv �1 i i! a. p: 0 0 'Ni N miz I d 1-11 of 'S� �i AL FESnV •rq KIN' M I. N I: p, Mv T 5 L r -i GPD GROUP, INC .... . ....... 1,,v 0, R/30/17 :OTEC I -41929 kKRON•Q�z OH 4uz 2415 MSTOVME AVE (rESLA STAPON) OsHxosH,w 549D4 TL vm —T—A" OVERALL SITE PLAN City of Oshkosh maps and data are intended to be used for general identification -purposes only, and the Giy of Oshkosh assumes no Fablity for the accuracy of the Information. Those using the information are responslVe for verifying aauray. For full disddmer please go to vnwr.d oshkosh.wi.ustGlSdisdaimer Commission Site Plan!,fora Terme ateWlan Com6Won Si* Flan Mao I in = 0.04 mi lin=200ft Printing Date: 8/31/2017 Prepared by: City of Oshkosh, WI