Loading...
HomeMy WebLinkAboutDorner Inc 17-12 Change Order No 1City fV� Oshkosh September 29, 2017 Mr. Todd Dorner Dorner, Inc. PO Box 129 Luxemburg, WI 54217 RE: Change Order No. 1 Contract 17-12 Dear Mr. Dorner: �I -Cl q :3- Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Dorner, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, es Rabe, P.E., CPESC Director of Public Works JER/tlt Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) 1-\ Engineering \2017 CONTRACTS \ 17-12 W tr Mn Relays \ Project_Information \ Contract Info \ Change Orders\ 17-12 Executed CO #1 Ltr 9-29-17.docx City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us Page 1 of 1 TO: Domer, Inc. PO Box 129 Luxemburg, WI 54217 CHANGE ORDER #1 DATE: August 30, 2017 Your present contract with the City of Oshkosh, Contract No. 17-12, awarded June 13, 2017, is hereby amended and changed as follows: NET INCREASE TO: SECTION 1 $116,607.05 NET INCREASE TO CONTRACT $116,607.05 SECTION I TOTALS BID TOTAL $1,978,062.15 $1,978,062.15 CO #1 $116,607.05 $116,607.05 CONTRACT TOTAL $2,094,669.20 $2,094,669.20 CITY OF OSHKOSH BY: - City Manager- City anagerCity Clerk prove a d accepted: Contractor certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved a ,tq form: dfy A r y CONTRACT 17.12 CHANGE ORDER #1 SECTION I - ADDITIONAL WORK REQUIRED: CO #1 (W PACKER AVENUE) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE Removing pavement; Square 1-1100 complete asspecified Yards 0.00 142.00 142.00 $8.15 $1,157.30 Removing concrete and asphalt sidewalk and driveway; complete as Square 1-1120 specified Feet 0.00 395.00 395.00 $0.60 1 $237.00 Unclassified excavation, Cubic 1-1200 complete asspecified Yards 0.00 112.00 112.00 $14.30 $1,601.60 8" concrete pavement removal and replacement; including sawing; pavement ties; integral curb and fine grading; turf restoration; and traffic control; complete as Square 1-1318 specified Yards 0.00 1,320.00 1,320.00 $55.60 $73,392.00 Pavement ties; complete as 1-1350 specified Each 0.00 45.00 45.00 $9.00 $405.00 Adjust manholes and inlets; 1-1360 complete asspecified Each 0.00 8.00 8.00 $210.00 $1,680.00 12" radius curb with 6" CABC and grading; complete as Linear 1-1410 specified Feet 0.00 65.00 65.00 $9.50 $617.50 30" curb and gutter; 8"; with 6" CABC and grading; Linear 1-1442 complete asspecified Feet 0.00 10.00 10.00 $23.75 $237.50 Sidewalk curb; complete as Linear 1-1460 specified Feet 0.00 15.00 15.00 $25.00 $375.00 6" concrete sidewalk/ driveway /ramp with 3" CABC and grading; complete as Square 1-1510 specified Feet 0.00 355.00 355.00 $5.70 $2,023.50 Curb ramp detectable warning field (natural/non- painted); complete as Square 1-1540 specified Feet 0.00 8.00 8.00 $30.60 $244.80 Drilled No. 4 sidewalk tie bars - deformed; epoxy - coated; complete as 1-1560 specified Each 0.00 8.00 8.00 $5.10 $40.80 Sawing existing pavement, Linear 1-1700 complete asspecified Feet 0.00 11.50 11.50 $2.30 $26.45 Sawing concrete pavement full depth; complete as Linear 1-1710 specified Feet 0.00 1,130.00 1,130.00 $3.07 $3,469.10 Base aggregate dense; 3/4"; 1-1800 complete asspecified Tons 0.00 215.00 215.00 $13.30 $2,859.50 Tack coat; complete as 1-1900 specified Gallons 0.00 10.00 10.00 $7.00 $70.00 Asphaltic cold weather paving; complete as Square 1-1918 specified Yards 0.00 145.00 145.00 $15.00 $2,175.00 4" asphaltic surface MT with 8" concrete base course; Square 1-1920 complete asspecified Yards 0.00 145.00 145.00 $75.00 $10,875.00 Furnish and install 12" storm Linear 1-2003 sewer; complete asspecified Feet 0.00 38.00 38.00 $60.00 $2,280.00 Furnish; install; maintain; and remove Type D modified inlet protection; complete as 1-2508 specified Each 1 0.00 1 9.00 1 9.00 $75.00 $675.00 Sediment removal - Type D modified inlet protection; 1-2510 complete asspecified Each 0.00 9.00 9.00 $5.00 $45.00 Page 1 of 2 CONTRACT 17-12 CHANGE ORDER #1 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE Furnish; install, maintain; and remove stone bag; complete 1-2516 as specified Each 0.00 9.00 9.00 $5.00 $45.00 Abandon 15" and larger storm sewer; complete as Linear 1-2802 specified Feet 0.00 325.00 325.00 $25.00 $8,125.00 Remove storm sewer manholes and inlets; 1-2812 lcomplete asspecified Each 1 0.00 1.00 1.00 1 $550.00 $550.00 Connect to existing storm sewer main; complete as 1-2850 specified Each 0.00 2.00 2.00 $550.00 $1,100.00 Connect to existing storm sewer manhole; complete as 1-2856 specified Each 0.00 1.00 1.00 $1,300.00 $1,300.00 Furnish and install external sanitary sewer manhole chimney seal; complete as 1-3114 specified Each 0.00 2.00 2.00 $500.00 $1,000.00 SECTION I - (ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1-1100 to 1-3114) - SUBTOTAL $116,607.05 NET INCREASE TO: SECTION 1 $116,607.05 Page 2 of 2