HomeMy WebLinkAboutAl Dix 17-06 Change Order No 1cito� Oshkosh September 29, 2017 Mr. Al Dix Al Dix Concrete, Inc. 401 Gertrude Street Kaukauna, WI 54130 RE: Change Order No.1 Contract 17-06 Dear Mr. Dix: 12019V Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Al Dix Concrete, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, es Rabe, P.E., CPESC Director of Public Works JER/tIt Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) L\Engineering\2017 CONTRACTS\17-06 Sidewalk Prog\Project_Information\Contract Info\Change Page 1 Of 1 Orders\17-06 Executed CO #1 Ltr 9-29-17.docx City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us TO: AL DIX CONCRETE, INC. CHANGE ORDER #1 401 GERTRUDE STREET DATE: AUGUST 17, 2017 KAUKAUNA, WI 54130 Your present contract with the City of Oshkosh, Contract No. 17-06, awarded March 28, 2017, is hereby amended and changed as follows: NET INCREASE TO: SECTION I -WORK UNIT D (N EAGLE ST) $82,939.65 SECTION I TOTALS BID TOTAL $1,041,710.90 $1,041,710.90 CO #1 (N EAGLE ST) $82,939.65 $82,939.65 CONTRACT TOTAL $1,124,650.55 $1,124,650.55 CITY OF OSHKOSH BY: City Manaer 'L, 1 City Clerk l Approved and accepted: ontractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. '-Ut�a &� Comptroller Approved as t fo;City Attorney CONTRACT 17-06 CHANGE ORDER #1 SECTION I: SECTION I - ADDITIONAL WORK REQUIRED: CO #1 (WORK UNIT D - N EAGLE ST) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE Removing curb and gutter; Linear 1-D-1110 complete as specified Feet 0.00 18.60 18.60 $5.00 $93.00 Removing concrete and asphalt sidewalk and driveway; complete as Square 1-D-1120 specified Feet 0.00 225.00 225.00 $1.10 $247.50 8" concrete pavement removal and replacement, including sawing; pavement ties, integral curb and fine grading, turf restoration; and traffic control, complete as Square 1-D-1318 specified Yards 0.00 1,064.10 1,064.10 1 $66.00 $70,230.60 8" concrete pavement HES removal and replacement, including sawing; pavement ties; integral curb and fine grading, turf restoration; and traffic control, complete as Square 1-D-1319 specified Yards 0.00 140.70 140.70 $69.00 $9,708.30 Pavement ties; complete as 1-D-1350 specified Each 0.00 8.00 1 8.00 $7.00 $56.00 30" curb and gutter, 7"; with 5 CABC and grading; Linear 1-D-1440 complete as specified Feet 0.00 18.60 18.60 $27.00 $502.20 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading, complete as Square 1-D-1510 specified Feet 0.00 225.00 225.00 $4.00 $900.00 Curb ramp detectable warning field (natural/non- painted), complete as Square 1-D-1540 specified Feet 0.00 8.00 8.00 $30.00 $240.00 Drilled No. 4 sidewalk tie bars - deformed, epoxy -coated; complete as specified 1-D-1560 Each 0.00 4.00 4.00 $4.00 $16.00 Sawing existing pavement full depth, complete as specified Linear 1-D-1710 Feet 0.00 21.10 21.10 $3.50 $73.85 Base aggregate dense; 3/4"; 1-D-1800 complete asspecified Tons 1 0.00 1 62.30 62.30 $14.00 $872.20 SECTION I -(ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1-D-1110 - 1-D-1800) -SUBTOTAL $82,939.65 NET INCREASE TO: SECTION 1 $82,939.65 Page 1 of 1