September 29, 2017
Mr. Al Dix
Al Dix Concrete, Inc.
401 Gertrude Street
Kaukauna, WI 54130
RE: Change Order No.1
Contract 17-06
Dear Mr. Dix:
12019V
Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Al Dix
Concrete, Inc. regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
es Rabe, P.E., CPESC
Director of Public Works
JER/tIt
Enclosure: Change Order No. 1
cc: Pam Ubrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director (w/copy)
File (w/original)
L\Engineering\2017 CONTRACTS\17-06 Sidewalk Prog\Project_Information\Contract Info\Change Page 1 Of 1
Orders\17-06 Executed CO #1 Ltr 9-29-17.docx
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us
TO: AL DIX CONCRETE, INC. CHANGE ORDER #1
401 GERTRUDE STREET DATE: AUGUST 17, 2017
KAUKAUNA, WI 54130
Your present contract with the City of Oshkosh, Contract No. 17-06, awarded March 28, 2017, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION I -WORK UNIT D (N EAGLE ST) $82,939.65
SECTION I TOTALS
BID TOTAL $1,041,710.90 $1,041,710.90
CO #1 (N EAGLE ST) $82,939.65 $82,939.65
CONTRACT TOTAL $1,124,650.55 $1,124,650.55
CITY OF OSHKOSH
BY:
City Manaer
'L, 1
City Clerk l
Approved and accepted:
ontractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
'-Ut�a &�
Comptroller
Approved as t fo;City
Attorney
CONTRACT 17-06 CHANGE ORDER #1
SECTION I:
SECTION I - ADDITIONAL WORK REQUIRED: CO #1 (WORK UNIT D - N EAGLE ST)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
Removing curb and gutter;
Linear
1-D-1110
complete as specified
Feet
0.00
18.60
18.60
$5.00
$93.00
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
1-D-1120
specified
Feet
0.00
225.00
225.00
$1.10
$247.50
8" concrete pavement
removal and replacement,
including sawing; pavement
ties, integral curb and fine
grading, turf restoration; and
traffic control, complete as
Square
1-D-1318
specified
Yards
0.00
1,064.10
1,064.10
1 $66.00
$70,230.60
8" concrete pavement HES
removal and replacement,
including sawing; pavement
ties; integral curb and fine
grading, turf restoration; and
traffic control, complete as
Square
1-D-1319
specified
Yards
0.00
140.70
140.70
$69.00
$9,708.30
Pavement ties; complete as
1-D-1350
specified
Each
0.00
8.00
1 8.00
$7.00
$56.00
30" curb and gutter, 7"; with
5 CABC and grading;
Linear
1-D-1440
complete as specified
Feet
0.00
18.60
18.60
$27.00
$502.20
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading, complete as
Square
1-D-1510
specified
Feet
0.00
225.00
225.00
$4.00
$900.00
Curb ramp detectable
warning field (natural/non-
painted), complete as
Square
1-D-1540
specified
Feet
0.00
8.00
8.00
$30.00
$240.00
Drilled No. 4 sidewalk tie bars
- deformed, epoxy -coated;
complete as specified
1-D-1560
Each
0.00
4.00
4.00
$4.00
$16.00
Sawing existing pavement full
depth, complete as specified
Linear
1-D-1710
Feet
0.00
21.10
21.10
$3.50
$73.85
Base aggregate dense; 3/4";
1-D-1800
complete asspecified
Tons 1
0.00
1 62.30
62.30
$14.00
$872.20
SECTION I -(ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1-D-1110 - 1-D-1800) -SUBTOTAL $82,939.65
NET INCREASE TO: SECTION 1 $82,939.65