HomeMy WebLinkAbout25. 17-487 SEPTEMBER 26, 2017 17-487 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: AWARD CONTRACT NO. 17-14 TO VINTON CONSTRUCTION
FOR CONSTRUCTION OF RIVERWALK WEST OF OREGON
STREET ($1,480,538.50)
INITIATED BY: COMMUNITY DEVELOPMENT
WHEREAS, the City of Oshkosh has heretofore advertised for bids for
construction of a bike/pedestrian riverwalk on the south side of the Fox River, West of
Oregon Street; and
WHEREAS, upon the opening and tabulation of bids it appears that the following
is the most advantageous bid:
Vinton Construction
PO BOX 1987
Manitowoc, WI 54221-1987
TOTAL BASE BID $ 373,697.00
ALTERNATE 1 $ 196,382.50
ALTERNATE 2 $ 822,235.00
ALTERNATE 3 $ 88,224.00
TOTAL BID $1,480,538.50
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same,
all according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No. 534-1040-7216-07710 TID #20 South Shore Redevelopment
Acct. No. 536-1040-7216-07710 TID #21 Fox River Corridor Project
MME
TO:
Honorable Mayor and Members of the Common Council
FROM:
Allen Davis, Community Development Director
DATE:
September 21, 2017
RE:
Award Contract No. 17-14 to Vinton Construction for
Construction of Riverwalk West of Oregon Street ($1,480,538.50)
BACKGROUND
Earlier this year, the City obtained about $800,000 in grant funds from the Wisconsin
Department of Natural Resources for the construction of the Riverwalk west of the Oregon Street
bridge, through the Morgan District, as far west to the Boatworks as possible. Last year, the City
had the seawall constructed west of the bridge in preparation for this next phase. The favorable
bid contained in the proposed construction contract would allow the City to complete the
Riverwalk through the Morgan District, under budget and ahead of schedule.
ANALYSIS
The City obtained the riverwalk easement through the Morgan District with the plan to build
the riverwalk from the Boatworks east to the Dockside. This construction project was planned
to extend the riverwalk from Oregon Street to the lagoon in 2017. The plan was then to build
the last section to the riverwalk around the lagoon to the Boatworks in 2018-2019. The City bid
the project with a base bid, and alternate bids 1, 2 and 3 that stretched from Oregon Street to the
Boatworks bridges. The bid indicates that it is possible to complete the last riverwalk segment
through the Morgan District, a few years ahead of schedule due to the very favorable bid.
The total scope of the project would expand from what originally was planned since the
contractor can complete the project well under the 2017/2018 CIP budgets. The 2017 CIP budget
of $1,500,000 and proposed 2018 CIP budget of $1,650,000 for this section of riverwalk totals
$3,150,000 over the two years. The proposed construction bid, and additional construction costs
including the purchase of lights, bollards and benches, landfill tipping fees, and an expanded
engineering scope will total approximately $2,060,000, about $1,000,000 dollars under the two
year budget.
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us
Construction would start in the fall of 2017 and finish in 2018, thereby connecting the Boatworks
with Oregon Street, ahead of schedule. Additional grant funding for 2018 is unlikely due to the
low bid and remaining reimbursable expenses. This then would allow staff to begin working
on the Pioneer Drive portion of the riverwalk next, west of the CN railroad tracks.
FISCAL IMPACT
The City funding for the project comes from the 2017 CIP (as amended earlier). In addition to
the WisDNR grant funds, the City's share of the funding will be paid from the cash balances
set aside in TIDs #20 and #21.
RECOMMENDATION
The Council awards the bid for construction west of Oregon Street to Vinton Construction for
$1,480,538.50.
Submitted,
Allen Davis
Community Development Director
Approved:
ctct� j�•
Mark A. Rohloff
City Manager
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us
Section Title
TOTAL BASE
TOTAL BASE
Contract 17-14 South Shore West (JeldWen Property) Segment Riverwalk Construction Project (#5323067)
Owner: City of Oshkosh, WI
Solicitor: AECOM
09/19/2017 10:00 AM CDT
BID Section 2: Undistributed Electrical Items
$196,382.50
$222,750.00
$33,150.00
Vinton Construction Company
Janke General Contractors
Michels Foundations
Item Code
Item Descri tion
U of M
Quantity
Unit Price
Extension
Unit Price
Extension
Division of Michaels Cor
Unit Price Extension
BID Section
1: Base Bid - Riverwalk (STA 12+00 to 18+97)
Linear Feet
500
$5.00
$2,500.00
$340,547.00
$4,875.00
$372,685.00
$2,595.00
$403,756.00
1
Mobilization/bond/insurance; complete asspecified
Lump
Sum
1
$67,000.00
$67,000.00
$28,000.00
$28,000.00
$44,000.00
$44,000.00
2
Erosion control/turbidity curtain; complete asspecified
Lump
Sum
1
$10,160.00
$10,160.00
$9,000.00
$9,000.00
$19,600.00
$19,600.00
$790.00
Demolition/site preparation/grading/clearing and grubbing; complete as
$623.00
$2,492.00
10.6 Electrical: Communication vault; 30" x 48"; complete asspecified
Each
2
$1,500.00
$3,000.00
$2,500.00
$5,000.00
3
s ecified
Lump
Sum
1
$16,500.00
$16,500.00
$10,000.00
$10,000.00
$8,400.00
$8,400.00
4
Manhole/storm sewer/outfall installation/ri ra ; complete asspecified
Each
1
$15,100.00
$15,100.00
$20,000.00
$20,000.00
$24,300.00
$24,300.00
1
Rip -rap bank protection; including coir logs; extra heavy and light -sized rip -
$10,000.00
$17,060.00
$17,060.00
$10,380.00
$10,380.00
10.8 Light ole foundation; complete asspecified
Each
2
$1,500.00
5
rap adjacent to Oregon Street bridge; complete asspecified
Lump
Sum
1
$9,978.00
$9,978.00
$9,000.00
$9,000.00
$17,000.00
$17,000.00
Alternate 1 - Load; transport; and install 1 1/4" dense aggregate (City
Riverwalk path construction; includes 7" concrete and #4 epoxy -coated rebar;
10.9 com tete asspecified
1 Each
2
$500.00
$1,000.00
$993.00
$1,986.00
$519.00
$1,038.00
bollard thickened base and light pole concrete slab -install subgrade fabric and
$10,725.00
$10.00
$15,000.00 $10.50
$15,750.00
Alternate 1 - Natural bank shoreline protection; including coir logs; light rip -
6
eo rid; complete asspecified
Lump
Sum
1
$72,935.00
$72,935.00
$78,000.00
$78,000.00
$89,700.00
$89,700.00
6.1
Excavation/load/transport excavated spoils; complete ass ecifiedTons
2500
$0.01
$25.00
$17.00
$42500.00
,
$955
.
$23,875.00
Load; transport; and install 1 1/4" dense aggregate (City supplied); complete
6.2
asspecified
Tons
3000
$6.70
$20,100.00
$10.00
$30,000.00
$10.38
$31,140.00
Electrical materials; labor; and equipment; including light pole foundations;
7
complete asspecified
Lump
Sum
1
$82,900.00
$82,900.00
$92,000.00
$92,000.00
$86,051.00
$86,051.00
8
Restoration/landscaping; complete asspecified
Lump
Sum
1
$9,800.00$9,800.00
$14,185.00
$14,185.00
$28,550.00
$28,550.00
9
hain-lin
Ck security fence Sta. 0+50 - 12+00; complete as specified
Lum
Sum
1
$36,049.00
$36,049.00
$40,000.00
$40,000.00
$31,140.00
$31,140.00
BID Section 2: Undistributed Electrical Items
$196,382.50
$222,750.00
$33,150.00
Al -01
$52,231.00
Lump Sum
$34,419.00
10.1 Electrical: l" SCH 40 PVC conduit; complete as specified
Linear Feet
1000
$4.00
$4,000.00
$6.30
$6,300.00
$4.15
$4,150.00
10.2 Electrical: 2" SCH 40 PVC conduit: complete asspecified
Linear Feet
500
$5.00
$2,500.00
$9.75
$4,875.00
$5.19
$2,595.00
10.3 Electrical: 3" SCH 40 PVC conduit; complete asspecified
Linear Feet
1000
$6.00
$6,000.00
$9.60
$9,600.00
$6.23
$6,230.00
10.4 Electrical: 12 gauge black coating tracer wire; complete asspecified
Linear Feet
2500
$0.50
$1,250.00
$0.50
$1,250.00
$0.52
$1,300.00
10.5 Electrical: Pull box steel; 24" diameter 36'; complete asspecified
Each
4
$600.00
$2,400.00
$790.00
$3,160.00
$623.00
$2,492.00
10.6 Electrical: Communication vault; 30" x 48"; complete asspecified
Each
2
$1,500.00
$3,000.00
$2,500.00
$5,000.00
$1,560.00
$3,120.00
Lighting control cabinet - WDOT Type 3688 with concrete base/conduits;
coated rebar; bollard thickened base and light pole concrete slab -install
including cabinet contents; meter breaker pedestal; and grounding; complete
Al -05
sub rade fabric and eo rid; complete ass ecifie
Lump Sum
1
10.7 asspecified
Each
1
$10,000.00
$10,000.00
$17,060.00
$17,060.00
$10,380.00
$10,380.00
10.8 Light ole foundation; complete asspecified
Each
2
$1,500.00
$3,000.00
$1,500.00
$3,000.00
$1,557.00
$3,114.00
Light pole/luminary/bollard transportation; assembly; and installation;
$9,142.50
$17.00
$19.550.00 $14.91
$17,146.50
Alternate 1 - Load; transport; and install 1 1/4" dense aggregate (City
10.9 com tete asspecified
1 Each
2
$500.00
$1,000.00
$993.00
$1,986.00
$519.00
$1,038.00
TOTAL BASE BID SECTIONS 1 & 2
TOTAL BID!
$373,697.00 $424,916.00 $438,175.00
ection 3: Alternate 1 - Riverwalk (STA 9+00 to 12+00)
$196,382.50
$222,750.00
$241,946.50
Al -01
Alternate 1 - Mobilization/bond/insurance; complete asspecified
Lump Sum
1
$22,500.00
$22,500.00
$10,700.00
$10,700.00 $30,050.00
$30,050.00
Al -02
Alternate 1 - Erosion control/turbidity curtain; complete asspecified
Lump Sum
1
$21,700.00
$21,700.00
$11,500.00
$11,500.00 $22,700.00
$22,700.00
Alternate l - Demolition/site preparation/grading/clearing and grubbing;
Al -03
complete as specified
Lump Sum
1
$8,500.00
$8,500.00
$8,000.00
$8,000.00 $8,400.00
$8,400,00
Alternate 1 - Manhole/storm sewer/outfall installation/rip-rap; complete as
Al -04
specified
Each
2
$16,400.00
$32,800.00
$21,000.00
$42 000.00 $22,502.00
$45,004.00
Alternate 1 - Riverwalk path construction; includes 7" concrete and #4 epoxy -
coated rebar; bollard thickened base and light pole concrete slab -install
Al -05
sub rade fabric and eo rid; complete ass ecifie
Lump Sum
1
$39,528.00
$39,528.00
$40,000.00
$40,000.00 $46,200.00
$46,200.00
Alternate 1 - Excavation/load/transport excavated spoils; complete as
Al -05.1
specified
Tons
1150
$7.95
$9,142.50
$17.00
$19.550.00 $14.91
$17,146.50
Alternate 1 - Load; transport; and install 1 1/4" dense aggregate (City
A1-05.2
supplied); complete as specified
Tons
1500
$7.15
$10,725.00
$10.00
$15,000.00 $10.50
$15,750.00
Alternate 1 - Natural bank shoreline protection; including coir logs; light rip -
A1 -06
rap; and bedding stone; complete asspecified
LurnD Sum
1
$17,337.00
$17,337.00
$22,000.00
$22,000.00 $13,650.00
$13,650.00
TOTAL BID E
TOTAL BID E
Al -07
Alternate 1 - electrical materials; labor; and equipment; including light pole
foundations; complete asspecified
I Lump Sum
1
$25,500.00
$25,500.00
$46 500.00
$46,500.00 $26,775.00
$26,775.00
Al -08
jAlternate, 1 - Restoration/landscaping; complete asspecified
I Lump Sum
1
$8,650.00
$8,650.00
1 $7,500.00
$7,500.00 $16,271.00
$16,271.00
ection 4: Alternate 2 - Riverwalk (STA 0+55 to 9+00)
$822,235.00
$424,916.00
$756,185.00
TOTAL ALTERNATE 1
$876,794.00
A2-01
Alternate 2 - Mobilization/bond/insurance; complete asspecified
Lump Sum
1
$42,000.00
$42,000.00
$39,500.00
$39,500.00
$46,400.00
$46,400.00
A2-02
Alternate 2 - Erosion control/turbidity curtain; complete asspecified
Lump Sum
1
$21,700.00
$21,700.00
$19,500.00
$19,500.00
$31,200.00
$31,200.00
Alternate 2 - Demolition/site preparation/clearing and grubbing; complete as
A2-03
specified
Lump Sum
1
$29,597.00
$29,597.00
$14,000.00
$14,000.00
$73,800.00
$73,800.00
Alternate 2 - Manhole/storm sewer/outfall installation/rip-rap; complete as
A2-04
specified
Each
3
$16,966.00
$50,898.00
$22,000.00
$66,000.00
$18,952.00
$56,856.00
A3-04
Alternate 2 - Riverwalk path construction; includes 7" concrete and #4 epoxy -
Lump Sum
1
$13,661.00
$13,661.00
$14,160.00
$14,160.00
$21,120.00
$21,120.00
coated rebar; bollard thickened base and light pole concrete slab -install
A2-05
sub rade fabric and eo rid; complete ass ecifie
Lump Sum
1
$71,615.00
$71,615.00
$67,000.00
$67,000.00
$77,550.00
$77,550.00
Alternate 2 - Excavation/load/transport excavated spoils; complete as
A2-05.1
specified
Tons
2500
$7.95
$19,875.00
$17.00
$42,500.00
$17.07
$42,675.00
Alternate 2 - Load; transport; and install 1 1/4" dense aggregate (City
A2-05.2
supplied); complete asspecified
Tons
3500
$8.50
$29,750.00
$9.00
$31,500.00
$10.54
$36,890.00
A3-06
Alternate 2 - Rip -rap shore protection; including coir logs; complete as
Lump Sum
1 1
$1,250.00
$1,250.00
$4,100.00
$4,100.00
$7,400.00
$7,400.00
A2-06
specified
Lump Sum
1
$56,500.00
$56,500.00
$48,500.00
$48,500.00
$44,253.00
$44,253.00
A3-07
Alternate 2 - Natural bank shore protection; including coir logs and rip -rap;
Lump Sum
1
$20,000.00
$20,000.00
$9,000.00
$9,000.00
$30,200.00
$30,200.00
A2-07
complete asspecified
Lump Sum
1
$22,600.00
$22,600.00
$17,785.00
$17,785.00
$16,860.00
$16,860.00
A3-08
Alternate 2 - Riverwalkboardwalk and retaining wall and footing construction;
Lump Sum
1
$9,400.00
$9,400.00
$15,000.00
$15,000.00
$14,500.00
$14,500.00
A2-08
complete asspecified
Lump Sum
1
$260,000.00
$260,000.00
$169,000.00
$169,000.00
$207,400.00
$207,400.00
A3-09
Alternate 2 - WDOT Type 3688 light control cabinet with concrete
Lump Sum
1
$4,100.00
$4,100.00
$8,700.00
$8,700.00
$15,311.00
$15,311.00
base/conduits; including cabinet contents; meter breaker pedestal; and
A2-09
groundin Electrical materials; labor; and equipment; includin
Lum Sum
1
$198,200.00
$198,200.00
$227,000.00
$227,000.00
$219,200.00
$219,200.00
A2-10
Alternate 2 - Restorationllandsca in ;com tete ass ecified
Lum Sum
1
$19,500.00
$19,500.00
$13,900.00
$13,900.00
$23,710.00
$23,710.00
ection 5: Alternate 3 - Riverwalk (STA 0+50 to 0+55)
$88,224.00
$424,916.00
$98,860.00
TOTAL ALTERNATE 1
$185,201.00
A3-01
Alternate 3 - Mobilization/bond/insurance; complete asspecified
Lump Sum
1
$14,800.00
$14,800.00
$10,700.00
$10,700.00
$38,500.00
$38,500.00
A3-02
Alternate 3 - Erosion control/turbidity curtain; complete asspecified
Lump Sum
1
$2,225.00
$2,225.00
$5,400.00
$5,400.00
$9,500.00
$9,500.00
Alternate 3 - Demolition/site preparation/clearing and grubbing; complete as
A3-03
specified
Lump Sum
1
$3,628.00
$3,628.00
$6,900.00
$6,900.00
$24,300.00
$24,300.00
Alternate 3 - Riverwalk path construction; includes 7" concrete and #4 epoxy -
coated rebar; bollard thickened base and light pole concrete slab -install
A3-04
sub rade fabric and eo rid; complete ass ecifie
Lump Sum
1
$13,661.00
$13,661.00
$14,160.00
$14,160.00
$21,120.00
$21,120.00
Alternate 3 - Excavation/load/transport excavated spoils; complete as
A3-04.1
specified
Tons
200
$7.95
$1,590.00
$19.00
$3,800.00
$17.11
$3,422.00
Alternate 3 - Load; transport; and install 1 1/4" dense aggregate (City
A3-04.2
supplied); complete asspecified
Tons
800
$7.15
$5,720.00
$12.00
$9,600.00
$10.56
$8,448.00
Alternate 3 - Electrical materials; labor; and equipment; including light pole
A3-05
foundations; complete asspecified
Lum Sum
1
$11,850.00
$11,850.00
$11,500.00
$11,500.00
$12,500,00
1 $12,500.00
A3-06
Alternate 3 - Restoration/landscaping; complete asspecified
Lump Sum
1 1
$1,250.00
$1,250.00
$4,100.00
$4,100.00
$7,400.00
$7,400.00
Alternate 3 - Wing wall attached to Boatworks bridge abutment; including
A3-07
timberpile; complete as specified
Lump Sum
1
$20,000.00
$20,000.00
$9,000.00
$9,000.00
$30,200.00
$30,200.00
Alternate 3 - Protect; disassemble; and relocate existing railroad portal;
A3-08
complete asspecified
Lump Sum
1
$9,400.00
$9,400.00
$15,000.00
$15,000.00
$14,500.00
$14,500.00
Alternate 3 - Rip -rap shore protection; including coir logs; complete as
A3-09
ispecified
Lump Sum
1
$4,100.00
$4,100.00
$8,700.00
$8,700.00
$15,311.00
$15,311.00
TOTAL BASE BID SECTIONS 1 & 2
$373,697.00
$424,916.00
$438,175.00
TOTAL ALTERNATE 1
$196,382.50
$222,750.00
$241,946.50
TOTAL ALTERNATE 2
$822,235.00
$756,185.00
$876,794.00
TOTAL ALTERNATE 3
$88,224.00
$98,860.00
$185,201.00
$1,480,538.50 $1,502,711.00 $1,742,116.50
iTii*Lqil:T
�J1\ /t7!1!
40
'•. J Mario Marion Road ! d
= City ....
1 "'• :, h�,, 2011 t y
4 — . Center/Hotel
City Cents 2
Riverside "
%r� �'`� �'•' t ''s'a ,r- and 012-2013 feat
Park Leach
Hotel 2010 Amphitheater
2008
Potential
` �. Future
William A. ger Park' a Fox River -� _ a-- -- L `'� �� ` - Public Access
Site
Steiger Park / �, , ..SQutt�,,.!! �+',�r+ e
a ..-.1 Shari,
2013 i hafif'" �1 central
Boat Works �; Jetd-wen 1 '"� th
JeldWen Phase -,r. ,
2014-2015 K.{`` Area 4
t�ti,;r•�,�"q � . 2016 y ,. ore � �� � r�riC7ra a ■
y"
x ,5
,Nett��'t� .1 h c �' Jeld Wen Ph r -�yac . South Shore
ase 2 s Central, South' '
2017/18 -., Shore East,
r _ 4,aayr °� Pioneer Island
n� "r To Be Determined ■
b���.i.s..n�." _:.r ii■Gr�`. I,:Mon..i'.. '...�iAr. . N.. ._ •5.` , 1'_Y�l