Loading...
HomeMy WebLinkAbout09. 17-471 SEPTEMBER 26, 2017 17-471 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: ACCEPT & APPROVE WAIVER OF SPECIAL ASSESSMENT NOTICES & HEARING IN CONNECTION WITH IMPROVEMENTS — RIPPLE AVENUE ESTATES; 3900 BLOCK OF OREGON STREET INITIATED BY: PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the Waiver of Special Assessment Notices and Hearing under Section 66.0703(7)(b) of the Wisconsin Statutes, for public improvements and services, for the premises described in the attached Waiver is accepted and approved. WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING UNDER SECTION 66.0703, WISCONSIN STATUTES The undersigned, owner of property benefited by the following improvements to be made by the City of Oshkosh, Winnebago County, State of Wisconsin, to wit: For public inspection of sanitary sewer and lateral, water main and laterals, grading, asphalt pavement and restoration. For private construction and construction staking survey and public inspection of sanitary sewer and lateral, water main and laterals, grading, asphalt pavement and restoration. In consideration of the construction of said improvements by the City of Oshkosh, Wisconsin, I hereby admit that such public improvement will benefit said property and consent to the levying of special assessments against the premises under Section 66.0703 of the Wisconsin Statutes for the cost of such improvements. In accordance with Section 66.0703 of the Wisconsin Statutes, I hereby waive all special assessment notices and hearings required by Section 66.0703 of the Wisconsin Statutes; and I further agree and admit that the benefit of my property from the construction of such improvements is in proportion to the footage thereof: Description of Premises Ripple Avenue Estates CSM Lots 1-3 Construction of Utilities and Access for Ripple Avenue Estates Sanitary Sewer & Laterals (Private Construction) Estimated Construction Cost 3% Inspection 2. Water Main with Laterals (Private Construction) Estimated Construction Cost 3% Inspection Grading and Restoration (Private Construction) Estimated Construction Cost 3% Inspection $28150.00 Private $844.50 Payment $131,850.00 Private $3,955.50 Payment $23,500.00 Private $705.00 Payment 4. Grade, Gravel and Asphalt Paving (Private) — Paving completed by July 31, 2018. Acceleration/Deceleration Lane and Passing Lane on Oregon St = $67075.00 Emergency Access off Ripple Ave = $7,800.00 (:\Engineering\Waiver of Special AssessmentTipple Ave Estates waiver.doc Ripple Ave Estates Page 2 of 2 Estimated Construction Cost $74,875.00 Private 3% Inspection $2,246.25 Payment 5. Final Plat Monuments (Private) Estimated Construction Cost $2,000.00 Private Summary of Cost Calculations Dev Agree Waiver Section Private Cost Inspection (Public) 1 $28,150.00 $844.50 2 $131,850.00 $3,955.50 3 $23,500.00 $705.00 4 $74,875.00 $2,246.25 5 $2,000.00 $0.00 Totals $260,375.00 $7,751.25 2 — Year Irrevocable Letter of Credit or Bond for Private Construction = $260,375.00 Cash Payment for Public Engineering, Inspection and Construction = $7,751.25 2 — Year Irrevocable Letter of Credit after Acceptance of Private Construction = $52,075.00 Signature of Owner: 111-:51-1 Signature of Authorized Representative Date MEngineering\Waiver of Special Assessment\Ripple Ave Estates waiver.doc