HomeMy WebLinkAbout09. 17-471 SEPTEMBER 26, 2017 17-471 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: ACCEPT & APPROVE WAIVER OF SPECIAL ASSESSMENT
NOTICES & HEARING IN CONNECTION WITH
IMPROVEMENTS — RIPPLE AVENUE ESTATES; 3900 BLOCK OF
OREGON STREET
INITIATED BY: PUBLIC WORKS DEPARTMENT
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
Waiver of Special Assessment Notices and Hearing under Section 66.0703(7)(b) of the
Wisconsin Statutes, for public improvements and services, for the premises described in
the attached Waiver is accepted and approved.
WAIVER OF SPECIAL ASSESSMENT NOTICES AND
HEARING UNDER SECTION 66.0703, WISCONSIN STATUTES
The undersigned, owner of property benefited by the following improvements to be made by the
City of Oshkosh, Winnebago County, State of Wisconsin, to wit:
For public inspection of sanitary sewer and lateral, water main and laterals, grading, asphalt
pavement and restoration.
For private construction and construction staking survey and public inspection of sanitary sewer
and lateral, water main and laterals, grading, asphalt pavement and restoration.
In consideration of the construction of said improvements by the City of Oshkosh, Wisconsin, I
hereby admit that such public improvement will benefit said property and consent to the levying
of special assessments against the premises under Section 66.0703 of the Wisconsin Statutes for
the cost of such improvements. In accordance with Section 66.0703 of the Wisconsin Statutes, I
hereby waive all special assessment notices and hearings required by Section 66.0703 of the
Wisconsin Statutes; and I further agree and admit that the benefit of my property from the
construction of such improvements is in proportion to the footage thereof:
Description of Premises
Ripple Avenue Estates
CSM
Lots 1-3
Construction of Utilities and Access for Ripple Avenue Estates
Sanitary Sewer & Laterals (Private Construction)
Estimated Construction Cost
3% Inspection
2. Water Main with Laterals (Private Construction)
Estimated Construction Cost
3% Inspection
Grading and Restoration (Private Construction)
Estimated Construction Cost
3% Inspection
$28150.00 Private
$844.50 Payment
$131,850.00 Private
$3,955.50 Payment
$23,500.00 Private
$705.00 Payment
4. Grade, Gravel and Asphalt Paving (Private) — Paving completed by July 31, 2018.
Acceleration/Deceleration Lane and Passing Lane on Oregon St = $67075.00
Emergency Access off Ripple Ave = $7,800.00
(:\Engineering\Waiver of Special AssessmentTipple Ave Estates waiver.doc
Ripple Ave Estates
Page 2 of 2
Estimated Construction Cost $74,875.00 Private
3% Inspection $2,246.25 Payment
5. Final Plat Monuments (Private)
Estimated Construction Cost $2,000.00 Private
Summary of Cost Calculations
Dev Agree Waiver Section
Private Cost
Inspection (Public)
1
$28,150.00
$844.50
2
$131,850.00
$3,955.50
3
$23,500.00
$705.00
4
$74,875.00
$2,246.25
5
$2,000.00
$0.00
Totals
$260,375.00
$7,751.25
2 — Year Irrevocable Letter of Credit or Bond for Private Construction = $260,375.00
Cash Payment for Public Engineering, Inspection and Construction = $7,751.25
2 — Year Irrevocable Letter of Credit after Acceptance of Private Construction = $52,075.00
Signature of Owner:
111-:51-1
Signature of Authorized Representative Date
MEngineering\Waiver of Special Assessment\Ripple Ave Estates waiver.doc