HomeMy WebLinkAboutInsituform Tech USA Change Order No. 1 16-30r,A City of Oshkosh September 11, 2017 Mr. Luke George Insituform Tech USA, Inc. 17988 Edison Avenue Chesterfield, MO 63005 RE: Change Order No. 1(Final) Contract 16-30 Dear Mr. George: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Insituform Tech USA, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, i mes Rabe, P.E., CPESC Director of Public Works JER/tlt Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) L\ Engineering \2016 CONTRACTS \ 16-30 San Swr Lining \ Project_Information \ Contract Info \ Change Orders\ 16-30 Executed CO ✓✓1 (Final) Ltr_9-11-17.docx City Hall, 215 Church Avenue P.O. Box 1 130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us Page 1 of 1 TO: INSITUFORM TECH USA, INC. 17988 EDISON AVENUE CHESTERFIELD, MO 63005 CHANGE ORDER #1 (FINAL) DATE: AUGUST 9, 2017 Your present contract with the City of Oshkosh, Contract No. 16-30, awarded November 9, 2016, is hereby amended and changed as follows: NET DECREASE: ($7,363.04) NET DECREASE TO CONTRACT ($7,363.04) TOTALS BID TOTAL $252,673.74 $252,673.74 CO #1 ($7,363.04) ($7,363.04) CONTRACT TOTAL $245,310.70 $245,310.70 CITY OF OSHKOSH / C y Manager Tit 'Qu City Clerk proved=nl'ccee A Contractor Jana Lause, Contracting & Attesting Officer I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. jwy Comptroller Approved as t form: City y CONTRACT 16-30 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install 8" storm Lump 1-20000 sewer CIPP; complete as Sum 0.00 1.00 1.00 $1,500.00 $1,500.00 2990 specified Each 298.00 298.70 0.70 $100.90 $70.63 Furnish and install 12" storm sewer CIPP; complete as Linear 2991 specified Feet 120.00 11.00 -109.00 $116.80 $12,731.20 Furnish and install 15' storm sewer CIPP; complete as Linear 2992 specified Feet 660.00 693.00 33.00 $31.90 $1,052.70 Furnish and install 8" sanitary sewer CIPP; complete as Linear 3901 specified Feet 1,860.00 1,720.10 -139.90 $21.70 $3,035.83 Furnish and install 10" sanitary sewer CIPP; Linear 3902 complete asspecified Feet 1,044.00 1,035.20 -8.80 $27.30 $240.24 Furnish and install 12" sanitary sewer CIPP; Linear 3903 complete asspecified Feet 297.00 295.40 -1.60 $34.50 $55.20 Furnish and install 15" sanitary sewer CIPP; Linear 3904 complete asspecified Feet 713.00 713.70 0.70 $43.30 $30.31 Furnish and install 18" sanitary sewer CIPP; Linear 3905 complete asspecified Feet 677.00 667.50 -9.50 $54.30 $515.85 Furnish and install sanitary sewer lateral connection grouting; complete as Vertical 3970 specified Feet 103.00 94.00 -9.00 $272.90 $2,456.10 Furnish sanitary sewer manhole cementitious liner Vertical 3976 setup; complete asspecified Feet 8.00 8.00 $158.70 Furnish and install sanitary sewer structural cementitious liner-PERMACAST by APIM PERMAFORM; complete as Vertical 3977 specified Feet 1 60.67 59.90 -0.77 $121.70 $93.71 Poured -in-place concrete manhole bench; complete as 3980 specified Each 1.00 1.00 $687.60 Sewer lateral connection grinding; complete as 3981 specified Each 8.00 12.00 4.00 1 $417.80 1 $1,671.20 (BID ITEMS 2990-3981) - SUBTOTAL $2,824.84 ($19,128.13) ADDITIONAL WORK REQUIRED: CO #1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Storm lateral cutting; Lump 1-20000 complete ass ecifeid Sum 0.00 1.00 1.00 $1,500.00 $1,500.00 Page t of 2 CONTRACT 16-30 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE Furnish and install 10" storm Linear 1-20001 sewer; complete asspecified Feet 0.00 50.00 50.00 $105.50 $5,275.00 Grouth leaking 12" seal; 1-30000 complete asspecified Each 0.00 1.00 1.00 $2,165.25 $2,165.25 ADDITIONAL WORK REQUIRED: CO #1 - (ITEMS 1-20000 -1-30000) - SUBTOTAL $8,940.25 $0.00 NET DECREASE TO: ($7,363.04) NETINCREASE NET DECREASE NET DECREASE TO CONTRACT: Page 2 of 2 $11,766.09 ($19,128.13) ($7,363.04)