Loading...
HomeMy WebLinkAboutPTS Contractors Change Order No 2 16-05r,A City of Oshkosh August 31, 2017 Mr. Mark Schleis PTS Contractors, Inc. 4075 Eaton Road Green Bay, WI 54311 RE: Change Order No. 2 (Final) Contract 16-05 Dear Mr. Schleis: RNS Enclosed is an executed copy of Change Order No. 2 (Final) between the City of Oshkosh and PTS Contractors, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, 117 imes Rabe, P.E., CPESC Director of Public Works JER/tlt Enclosure: Change Order No. 2 (Final) cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) 1:\ Engineering \2016 CONTRACTS \ 16-05 Conc Paving & Util \ Project_Information \ Contract Info \ Change Orders\16-05 Executed CO 42 (Final) Ltr_8-31-17.docx City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us Page 1 of 1 TO: PTS CONTRACTORS, INC. 4075 EATON ROAD GREEN BAY, WI 54311 CHANGE ORDER #2 (FINAL) DATE: JUNE 26, 2017 Your present contract with the City of Oshkosh, Contract No. 16-05, awarded March 22, 2016, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PAVING NET INCREASE TO: SECTION II - STORM SEWER NET DECREASE TO: SECTION III - SANITARY SEWER NET DECREASE TO: SECTION IV - WATER MAIN NET INCREASE TO: SECTION V - ELECTRICAL NET INCREASE TO CONTRACT $38,563.07 $17,430.94 ($8,869.18) ($4,966.41) $3,820.39 $45,978.81 SECTION I SECTION II SECTION III SECTION IV SECTION V (PAVING) (STORM) (SANITARY) (WATER) (ELECTRICAL) TOTALS BID TOTAL $1,113,058.55 $559,917.11 $595,669.04 $477,223.00 $63,313.25 $2,809,180.95 CO #1 $7,808.00 $15,410.09 $0.00 $0.00 $0.00 $23,218.09 PREVIOUS CONTRACT TOTAL $1,120,866.55 $575,327.20 $595,669.04 $477,223.00 $63,313.25 $2,832,399.04 CO #2 $38,563.07 $17,430.94 ($8,869.18) ($4,966.41) $3,820.39 $45,978.81 CONTRACT TOTAL $1,159,429.62 $592,758.14 $586,799.86 $472,256.59 $67,133.64 $2,878,377.85 CITY OF OSHKOSH BY: City Manager t\ )) � City Clerk Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Awn ` Comptroller A '_ CONTRACT 16-05 CHANGE ORDER #2 FINAL SECTION I - PAVING ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Clearing; complete as 1010 specified Stations 2.00 2.00 $205.00 Clearing; complete as Inch 1011 Ispecified Diameter 1 357.00 466.00 109.00 1 $6.65 $724.85 Grubbing; complete as 1020 specified Stations 2.00 2.00 $205.00 Grubbing; complete as Inch 1021 specified Diameter 357.00 466.00 109.00 $6.65 $724.85 Removing pavement; Square 1100 complete asspecified Yards 14,000.00 13,639.60 -360.40 $1.55 $558.62 Removing concrete and asphalt sidewalk and driveway; complete as Square 1120 specified Feet 1 27,800.00 28,813.30 1,013.30 $0.40 $405.32 Unclassified excavation; Cubic 1200 complete asspecified Yards 4,400.00 4,307.70 1 -92.30 $12.00 $1,107.60 Excavation special (paving); 1220 complete asspecified Tons 100.00 0.00 -100.00 $12.30 $1,230.00 7" concrete pavement; base in place and grading; Square 1300 complete asspecified Yards 1 1,330.00 1,258.40 -71.60 $38.25 $2,738.70 7' concrete pavement; with 5" CABC and grading; complete Square 1301 asspecified Yards 1,730.00 1 1,686.30 -43.70 $36.50 $1,595.05 8" concrete pavement; with 6" CABC and grading; Square 1311 complete asspecified Yards 8,750.00 8,651.20 -98.80 $40.36 $3,987.57 8" concrete pavement HES; with 6" CABC and grading; Square 1313 complete asspecified Yards 1 2,440.00 2,368.80 -71.20 1 $41.20 $2,933.44 8" concrete pavement HES removal and replacement; including sawing; pavement ties; integral curb and fine grading; turf restoration; and traffic control; complete as Square 1319 Ispecified Yards 1 1,720.00 2,332.70 612.70 $46.60 $28,551.82 Concrete pavement intersection gap; complete as 1333 specified Each 2.00 2.00 $512.00 Crushed aggregate base course; complete as 1340 specified Tons 2,115.00 198.70 -1,916.30 $7.20 $13,797.36 Pavement ties; complete as 1350 specified Each 1 226.00 517.00 291.00 $7.20 $2,095.20 Adjust manholes and inlets; 1360 complete asspecified Each 100.00 106.00 6.00 $255.00 $1,530.00 Turf restoration; complete as Square 1370 specified Yards 11,200.00 11,196.40 -3.60 1 $7.00 $25.20 12" radius curb with 6" CABC and grading; complete as Linear 1410 specified Feet 1 490.00 488.10 -1.90 $8.70 $16.53 30" curb and gutter, 7"; with 5" CABC and grading; Linear 1440 complete asspecified Feet 125.00 142.90 17.90 $24.10 $431.39 Sidewalk curb; complete as Linear 1460 specified Feet 20.00 20.00 $41.00 4" concrete sidewalk with 3" CABC and grading; complete Square 1500 1 asspecified 1 Feet 1 19,500.00 20,545.30 1,045.30 $4.80 1 $5,017.44 Page 1 of 10 CONTRACT 16-05 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 6' concrete sidewalk/ Square 1-1100 driveway/ramp with 3" CABC Yards 110.00 326.60 216.60 $15.00 $3,249.00 and grading; complete as Square 1510 Ispecified Feet 5,130.00 5,740.00 610.00 -187.70 1 1 $5.20 $3,172.00 $1.88 6" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete Square 1514 asspecified Feet 9,100.00 9.396.60 296.60 $5.30 $1,571.98 6"concrete sidewalk/ driveway/ramp with false curb, 3" CABC, and grading, Square 1516 Icomplete as specified Feet 305.00 301.40 -3.60 1 $8.30 $29.88 Curb ramp detectable warning field (natural/non- painted); complete as Square 1540 specified Feet 200.00 208.00 8.00 $28.65 $229.20 No. 4 reinforcing rods - deformed, epoxy -coated; Linear 1550 complete asspecified Feet 3,000.00 2,450.00 -550.00 $1.00 $550.00 Drilled No. 4 sidewalk tie bars - deformed, epoxy -coated, complete as specified 1560 Each 225.00 246.00 21.00 $4.00 $84.00 Furnish and install tree, 1600 complete asspecified Each 1 30.00 36.00 6.00 1 $332.00 $1,992.00 Locate existing property monuments; complete as 1650 specified Each 23.00 42.00 19.00 $155.00 $2,945.00 Replace existing property monuments, complete as 1652 Ispecifed Each 22.00 11.00 -11.00 $51.00 $561.00 Sawing existing pavement; Linear 1700 complete asspecified Feet 1 540.00 431.90 -108.10 $2.00 $216.20 Sawing concrete pavement full depth; complete as Linear 1710 specified Feet 760.00 1,399.30 639.30 $2.55 $1,630.22 Tack coat; complete as 1900 specified Gallons 65.00 50.00 -15.00 $3.60 $54.00 4" asphaltic pavement with 10" CABC and grading, Square 1906 complete asspecified Yards 300.00 370.50 1 70.50 $40.40 $2,848.20 4" asphaltic transition with 10" CABC and grading, Square 1911 complete asspecified Yards 390.00 338.10 -51.90 $40.80 $2,117.52 4" asphaltic surface with 6" CABC and grading, complete Square 1916 ass ecified Yards 160.00 269.20 109.20 $63.50 $6,934.20 2" asphaltic surface with 6" CABC and grading; complete Square 1917 1 asspecified Yards 215.00 1 0.00 -215.00 1 $28.65 1 $6,159.75 SECTION I - (BID ITEMS 1010-1917) - SUBTOTAL $60,887.67 ($37,678.42) SECTION I - ADDITIONAL WORK REQUIRED: CO #1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Removing pavement; Square 1-1100 complete asspecified Yards 110.00 326.60 216.60 $15.00 $3,249.00 Sawing existing pavement, Linear 1-1700 Icomplete asspecified I Feet 1 400.00 1 212.30 1 1 -187.70 1 $0.01 $1.88 Page 2 of 10 CONTRACT 16-05 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Tack coat; complete as Linear 1-1900 specified Gallons 8.00 22.90 14.90 $13.00 $193.70 5" asphaltic pavement with Linear 2002 10" CABC and grading; Square 1 115.00 139.70 24.70 $112.00 $2,766.40 1-1950 1 complete asspecified Yards 1 110.00 1 326.60 1 216.60 1 1 $55.00 1 $11,913.00 SECTION i - (ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1-1100-1-1950) - SUBTOTAL $15,355.70 ($1.88) NET INCREASE TO: SECTION 1 $38,563.07 SECTION II - STORM SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 8" storm Linear 2001 sewer; complete as specified Feet 5.00 15.00 10.00 $110.00 $1,100.00 Furnish and install 10" storm Linear 2002 sewer; complete as specified Feet 1 115.00 139.70 24.70 $112.00 $2,766.40 Furnish and install 12" storm Linear 2003 sewer; complete as specified Feet 730.00 918.80 188.80 $62.00 $11,705.60 Furnish and install 15" storm Linear 2006 sewer; complete as specified Feet 605.00 731.70 126.70 $54.00 $6,841.80 Furnish and install 18" storm Linear 2009 sewer; complete as specified Feet 235.00 219.10 -15.90 $88.00 $1,399.20 Furnish and install 24" storm Linear 2015 sewer; complete as specified Feet 640.00 643.70 3.70 $69.00 $255.30 Furnish and install 30" storm Linear 2021 sewer; complete as specified Feet 10.00 8.00 -2.00 $124.00 $248.00 Furnish and install 36" storm Linear 2024 sewer; complete as specified Feet 300.00 300.00 $96.00 Furnish and install 48" storm Linear 2030 sewer; complete as specified Feet 180.00 176.40 -3.60 $157.00 $565.20 Furnish and install 54" storm Linear 2033 sewer; complete as specified Feet 370.00 363.00 -7.00 $163.00 $1,141.00 Furnish and install 34" x 53" HERCP Class III storm Linear 2053 sewer; complete as specified Feet 130.00 134.30 4.30 $155.00 $666.50 Furnish and install 38" x 60" HERCP Class III storm Linear 2055 sewer; complete as specified Feet 285.00 276.30 -8.70 $172.00 $1,496.40 Furnish and install standard storm sewer manhole (4' diameter); complete as Vertical 2201 specified Feet 31.50 62.93 31.43 $314.00 $9,869.02 Furnish and install standard storm sewer manhole (5' diameter); complete as Vertical 2202 specified Feet 15.40 11.52 -3.88 $362.00 $1,404.56 Furnish and install standard storm sewer manhole (7' diameter); complete as Vertical 2204 specified Feet 6.10 6.02 -0.08 $602.00 $48.16 Furnish and install standard storm sewer manhole (8' diameter); complete as Vertical 2205 s ecified Feet 16.50 16.25 -0.25 $724.00 $181.00 Furnish and install standard storm sewer manhole (7' x 7' Vertical 2210 box; complete as specified Feet 1 31.20 31.02 -0.18 1 $898.00 $161.64 Page 3 of 10 CONTRACT 16-05 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install standard strom sewer manhole (8'x 8' Vertical 2211 box), complete as specified Feet 6.50 6.34 -0.16 $1,152.00 $184.32 Furnish and install Type 1 2236 inlet complete asspecified Each 4.00 3.00 -1.00 $1,402.00 $1,402.00 Furnish and install Type 3 2237 inlet (with 18" sump), Each 33.00 34.00 1.00 $1,565.00 $1,565.00 Furnish and install 6" storm sewer lateral; complete as Linear 2400 specified Feet 800.00 798.00 -2.00 $38.00 $76.00 Furnish and install storm sewer marker balls, complete 2404 asspecified Each 44.00 53.00 9.00 $30.00 $270.00 Furnish and install storm sewer clay dams; complete 2406 asspecified Each 32.00 21.00 -11.00 $87.00 $957.00 Furnish and install storm sewer lateral inlet, complete 2408 asspecified Each 19.00 12.00 -7.00 $574.00 $4.018.00 and Furnish; install; maintain; and remove Type D modified protection; complete as 2508 specified Each 97.00 104.00 7.00 $72.00 $504.00 Sediment removal - Type D modified inlet protection; 2510 complete asspecified Each 97.00 0.00 -97.00 $5.00 $485.00 Furnish, install, maintain, and remove stone tracking pad; 2512 complete asspecified Each 1.00 0.00 -1.00 $0.01 $0.01 Furnish: install, maintain, and remove stone bag; complete 2516 asspecified Each 50.00 0.00 -50.00 $12.00 $600.00 Furnish; install, maintain, and remove 12" diameter sediment logs; complete as Linear 2518 Ispecified Feet 1 30.00 78.00 48.00 $16.00 $768.00 Rock excavation, complete Cubic 2750 asspecified Yards 50.00 0.00 -50.00 $0.01 $0.50 Abandon 8" - 12" storm Linear 2800 sewer; complete as specified Feet 220.00 66.00 -154.00 $8.00 $1,232.00 Abandon 15" and larger storm sewer, complete as Linear 2802 specified Feet 1,225.00 958.00 -267.00 $13.00 $3,471.00 Remove 30" and smaller storm sewer; complete as Linear 2804 specified Feet 1 275.00 285.00 10.00 1 $17.00 $170.00 Abandon storm sewer manholes and inlets, 2810 complete asspecified Each 12.00 8.00 -4.00 $300.00 $1,200.00 Remove storm sewer manholes and inlets; 2812 complete asspecified Each 2.00 2.00 $510.00 Connect to existing storm sewer main; complete as 2850 specified Each 13.00 14.00 1.00 $275.00 $275.00 Connect to existing storm sewer lateral; complete as 2852s ecified Each 6.00 9.00 3.00 $140.00 $420.00 Connect to existing storm sewer manhole, complete as 2856 specified Each 3.00 6.00 3.00 $1,280.00 $3,840.00 Page 4 of 10 CONTRACT 16-05 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Storm sewer utility line Linear 1-2006 opening (ULO); complete as Feet 165.00 164.22 -0.78 $70.00 $54.60 2914 specified Each 5.00 0.00 -5.00 $580.00 $2,900.00 SECTION II - (BID ITEMS 2001-2914) - SUBTOTAL SECTION II - ADDITIONAL WORK REQUIRED: CO #1 $41,016.62 ($232170.99) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 15" storm Linear 1-2006 sewer; complete as specified Feet 165.00 164.22 -0.78 $70.00 $54.60 3000 Furnish; install; maintain; and Feet 1,770.00 1,743.40 -26.60 $82.00 $2,181.20 remove Type D modified inlet protection; complete as Linear 1-2508 specified Each 9.00 0.00 2.00 -9.00 $40.00 $360.00 $360.00 Sediment removal - Type D modified inlet protection; Linear 1-2810 complete as specified Each 9.00 0.00 -9.00 $0.01 $0.09 Connect to existing storm sewer manhole; complete as Vertical 1-2856 Ispecifed specified Each 2.00 2.00 -8.52 $250.00 $3,493.20 Mobilization; complete as 1-2900 specified Each 1.00 1.00 $3,000.00 SECTION 11 - (ADDITIONAL WORK REQUIRED: CO #1 - (ITEMS 1-2006-1-2900) - SUBTOTAL NET INCREASE TO: SECTION II SECTION III - SANITARY SEWER $0.00 ($414.69) $17,430.94 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 8" sanitary sewer (relay); complete as Linear 3000 specified Feet 1,770.00 1,743.40 -26.60 $82.00 $2,181.20 Furnish and install 12" sanitary sewer (relay); Linear 3004 complete asspecified Feet 12.00 14.00 2.00 $180.00 $360.00 Furnish and install 15" sanitary sewer (relay); Linear 3006 complete asspecified Feet 1 2,265.00 2,246.60 -18.40 1 $98.00 $1,803.20 Furnish and install 8" sanitary sewer drop; complete as Vertical 3060 specified Feet 14.25 5.73 -8.52 $410.00 $3,493.20 Furnish and install 12" sanitary sewer drop; Vertical 3064 complete asspecified Feet 5.25 12.79 7.54 $470.00 $3,543.80 Furnish and install standard sanitary sewer manhole (4' diameter); complete as Vertical 3100 specified Feet 246.00 243.12 -2.88 $243.00 $699.84 Furnish and install external sanitary sewer manhole chimney seal; complete as 3114 specified Each 24.00 23.00 1 -1.00 $500.00 $500.00 Furnish and install external sanitary sewer manhole chimney seal extension; 3116 complete asspecified Each 3.00 1.00 -2.00 $450.00 $900.00 Furnish and install internal sanitary sewer manhole chimney seal; complete as 3118 Ispecified I Each 2.00 1 4.00 1 2.00 1 $300.00 1 $600.00 Page 5 of 10 CONTRACT 16-05 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Reconstruct sanitary sewer manhole (4' diameter); Vertical 3122 complete asspecified Feet 6.00 5.00 -1.00 $310.00 $310.00 Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as 3210 specified Each 18.00 14.00 -4.00 $74.00 $296.00 Furnish and install 8" x 8" sanitary sewer factory wyes or tees, complete as 3219 specified Each 1.00 0.00 -1.00 $135.00 $135.00 Furnish and install 6" sanitary sewer "Insert -A -Tee" or "Kor- N-Tee"; complete as 3222 specified Each 1 16.00 18.00 2.00 1 $142.00 $284.00 Furnish and install 4" sanitary sewer laterals (new), Linear 3230 complete as specified Feet 86.00 97.50 11.50 $83.00 $954.50 Furnish and install 4" sanitary sewer riser (new); complete Linear 3231 as specified Feet 25.00 19.00 -6.00 $83.00 $498.00 Furnish and install 4"/6" sanitary sewer lateral (relay), Linear 3234 complete asspecified Feet 1,000.00 880.00 -120.00 $75.00 $9,000.00 Furnish and install 4"/6" sanitary sewer riser (relay); Linear 3235 complete asspecified Feet 25.00 18.00 -7.00 $73.00 $511.00 Furnish and install sanitary sewer lateral marker balls, 3236 complete asspecified Each 65.00 70.00 5.00 $35.00 $175.00 Furnish and install clay 3238 dams, complete as specified Each 33.00 27.00 -6.00 $115.00 $690.00 Furnish and install connection to existing 8" 3300 mains, complete asspecified Each 7.00 6.00 -1.00 $915.00 $915.00 Furnish and install connection to existing 12" mains, complete as specified 3304 Each 2.00 2.00 $995.00 Furnish and install connection to existing 15" sanitary sewer mains, 3306 complete asspecified Each 2.00 1.00 1 -1.00 $1,144.00 $1,144.00 Furnish and install sanitary sewer concrete collars, 3330 complete asspecified Each 2.00 0.00 -2.00 $0.01 $0.02 Furnish and install 10" sanitary sewer open cut casing pipes, complete as Linear 3404 specified Feet 30.00 20.00 -10.00 $150.00 $1,500.00 Furnish and install 12" sanitary sewer open cut casing pipes; complete as Linear 3406 specified Feet 40.00 0.00 -40.00 $216.00 $8,640.00 Furnish and install 24" sanitary sewer open cut casing pipes; complete as Linear 3412 specified Feet 20.00 20.00 $224.00 Rock excavation, complete Cubic 3600 1 asspecified Yards 100.00 0.00 -100.00 $0.01 $1.00 Closed circuit televising, Linear 3700 complete asspecified Feet 4,047.00 4,004.00 -43.00 $2.00 $86.00 Page 6 of 10 CONTRACT 16-05 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Abandon sanitary sewer manholes; complete as 3800 specified Each 3.00 4.00 1.00 $332.00 $332.00 4000 Abandon 8" sanitary sewer; Linear 165.00 89.00 -76.00 $117.00 1 -$8,892.00 3802 complete asspecified Feet 945.00 945.00 $6.00 30000 Remove sanitary sewer; Linear 0.00 56.80 56.80 $250.00 $14,200.00 3854 complete as specified Feet 70.00 70.00 $36.00 4002 Sanitary sewer utility line Feet 200.00 263.50 1 63.50 $112.00 $7,112.00 opening (ULO); complete as Lump 3890 specified Each 2.00 0.00 1.00 -2.00 $0.01 $2,100.45 $0.02 Bentonite slurry dam Linear 4004 (sanitary), complete as Feet 2,360.00 2,284.00 1 -76.00 $95.00 $7,220.00 3894 Ispecified I Each 1 2.00 1 0.00 1 -2.00 1 $535.00 $1,070.00 SECTION III - (BID ITEMS 3000-3894) - SUBTOTAL $6,249.30 ($34,373.48) SECTION III - ADDITIONAL WORK REQUIRED: CO #1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Adjusted bid price for rock excavation due to total quantity change being greater Linear 4000 than 15% (section 100.37); Feet 165.00 89.00 -76.00 $117.00 1 -$8,892.00 complete as specified Cubic 30000 iron water main (relay) with Yards 0.00 56.80 56.80 $250.00 $14,200.00 Extra time and materials to Linear 4002 rebuild manhole W-16 due to Feet 200.00 263.50 1 63.50 $112.00 $7,112.00 encountered bedrock, Lump 30001 complete asspecified Sum 000 1.00 1.00 $2,100.45 $2,100.45 Extra time and materials to fix Linear 4004 a 45° bend not properly Feet 2,360.00 2,284.00 1 -76.00 $95.00 $7,220.00 installed beyond contract Lump 30002 limits; complete asspecified 1 Sum 1 0.00 1 1.00 1 1.00 1 1 $2,954.55 1 $2,954.55 SECTION III - (ADDITIONAL WORK REQUIRED: CO #1 - ITEMS 30000 - 30001) - SUBTOTAL $19,255.00 $0.00 NET DECREASE TO: SECTION III ($8,869.18) SECTION IV - WATER MAIN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install 4" ductile iron water main (relay) with polywrap, complete as Linear 4000 specified Feet 165.00 89.00 -76.00 $117.00 1 -$8,892.00 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as Linear 4002 specified Feet 200.00 263.50 1 63.50 $112.00 $7,112.00 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as Linear 4004 specified Feet 2,360.00 2,284.00 1 -76.00 $95.00 $7,220.00 Furnish and install 12" ductile iron water main (relay) with polywrap; complete as Linear 4008 specified Feet 135.00 128.00 -7.00 $194.00 $1,358.00 Furnish and install 1" water service (relay); complete as Linear 4036 Ispecified I Feet 1 510.00 1 394.00 1 -116.00 1 $62.00 $7,192.00 Page 7 of 10 CONTRACT 16-05 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 2" water service (relay), complete as Linear 4040 specified Feet 185.00 280.00 95.00 $118.00 $11,210.00 Furnish and install 1" corporation and stop box; 4048 complete asspecified Each 15.00 12.00 -3.00 $300.00 $900.00 Furnish and install 2" corporation and stop box; 4053 complete asspecified Each 1 5.00 6.00 1.00 $800.00 $800.00 Furnish and install water service clay dams; complete 4055 asspecified Each 20.00 18.00 -2.00 $115.00 $230.00 Furnish and install connections to existing 4" water main; complete as 4056 specified Each 4.00 2.00 -2.00 $1,520.00 $3,040.00 Furnish and install connections to existing 6" water main, complete as 4058 specified Each 2.00 3.00 1.00 1 $1,680.00 $1,680.00 Furnish and install connections to existing 8" water main; complete as 4060 specified Each 3.00 3.00 $1,855.00 Furnish and install connections to existing 12" water main; complete as 4064 specified Each 2.00 2.00 $2,100.00 Furnish and install 6" x 12" water main tee; complete as 4104 specified Each 1.00 1.00 $625.00 Furnish and install 8" x 4" water main tee; complete as 4109 specified Each 1 3.00 3.00 1 $355.00 Furnish and install 8" x 6" water main tee, complete as 4110 specified Each 8.00 9.00 1.00 $398.00 $398.00 Furnish and install 8" x 8" water main tee; complete as 4111 specified Each 3.00 3.00 $472.00 Furnish and install 8" x 12" water main tee; complete as 4113 specified Each 1.00 1.00 1 $785.00 Furnish and install 4" 11 -1 /4 degree water main bend; 4217 complete asspecified Each 1.00 1.00 $165.00 Furnish and install 8" 11-1/4 degree water main bend; 4219 complete asspecified Each 6.00 4.00 -2.00 $280.00 $560.00 Furnish and install 4" 22-1/2 degree water main bend; 4226 complete asspecified Each 1.00 1.00 $175.00 Furnish and install 8" 22-1/2 degree water main bend; 4228 complete asspecified Each 6.00 7.00 1.00 $290.00 $290.00 Furnish and install 4" 45 degree water main bend; 4235 complete asspecified Each 1.00 4.00 3.00 $215.00 $645.00 Furnish and install 6" 45 degree water main bend, 4236 complete ass specified Each 1 29.00 15.00 -14.00 $242.00 $3,388.00 Page 8 of 10 CONTRACT 16-05 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 8" 45 degree water main bend, 4237 complete as specified Each 2.00 2.00 $285.00 40000 Furnish and install 12" 45 Sum 0.00 1.00 1.00 $5,133.86 $5,133.86 degree water main bend; 4239 Icomplete as specified Each 4.00 4.00 $600.00 Furnish and install 8" x 6" water main reducer; complete Lump 4264 as specified Each 2.00 2.00 1.00 $315.00 $1,531.40 Cut and cap existing 8" water main, complete as specified 4354 valve and replace with an Each 1.00 2.00 1.00 $235.00 $235.00 Furnish and install 4" water Lump 400002 main gate valve, complete as Sum 0.00 1.00 1.00 $2,764.33 $2,764.33 4400 specified Each 4.00 3.00 -1.00 $870.00 $870.00 Furnish and install 6" water Linear 4722 main gate valve, complete as Feet 0.00 40.00 40.00 $145.00 $5,800.00 4401 specified Each 10.00 10.00 $960.00 Furnish and install 8" water main gate valve; complete as 4402 specified Each 13.00 10.00 1 -3.00 $1,360.00 $4,080.00 Furnish and install 12" water 4404 main gate valve, complete as Each 1.00 1.00 $2,730.00 Furnish and install hydrant; 4500 complete asspecified Each 8.00 8.00 $3,550.00 Furnish and install 2" water main casing pipe; complete Linear 4712 asspecified Feet 3000 0.00 -30.00 $56.00 $1,680.00 Furnish and install 4" water main casing pipe; complete Linear 4714 1 asspecified Feet 1 30.00 20.00 -10.00 1 $88.00 $880.00 Furnish and install 10" water main casing pipe, complete Linear 4720 asspecified Feet 50.00 0.00 -50.00 $104.00 $5,200.00 Remove water main; Linear 4920 complete asspecified Feet 380.00 372.00 -8.00 $22.00 $176.00 SECTION IV - (BID ITEMS 4000-4920) - SUBTOTAL $22,370.00 ($45,666.00) SECTION IV - ADDITIONAL WORK REQUIRED: CO #2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Time and materails to repair miss marked hit 2" water service. Invoice Number 16- Lump 40000 678-01 Sum 0.00 1.00 1.00 $5,133.86 $5,133.86 Crew time to restake watermain and install insulation over the new watermain. Invoice Number Lump 40001 16-678-02 Sum 0.00 1.00 1.00 $1,531.40 $1,531.40 Time and materails to remove 8"x4" tee and 4" valve and replace with an 8"x6" tee and 6" valve. Lump 400002 Invoice Number 16-678-04 Sum 0.00 1.00 1.00 $2,764.33 $2,764.33 Furnish and Install 12" Steel Water main Casing Pipe; Linear 4722 complete ass specified Feet 0.00 40.00 40.00 $145.00 $5,800.00 Page 9 of 10 CONTRACT 16-05 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPR/CE CONTRACTPRICE Furnish and Install 18" Steel Water main Casing Pipe; Linear 4726 complete asspecified Feet 0.00 20.00 20.00 $155.00 $3,100.00 SECTION IV - (ADDITIONAL WORK REQUIRED: CO #1 ITEMS 40000 - 4726) - SUBTOTAL NET DECREASE TO: SECTION IV SECTION V - ELECTRICAL $18,329.59 $0.00 ($4,966.41) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install pull box (steel); 24" x 42"; complete 5018 asspecified Each 12.00 12.00 $665.00 Adjust pull box; complete as 5025 specified Each 12.00 12.00 $128.00 Remove pull box; complete 5026 asspecified Each 2.00 2.00 $52.00 Remove concrete base; 1.00 5027 complete ass specified Each 5.00 6.00 $104.00 $104.00 Furnish and install control cabinet; complete as 5050 specified Each 2.00 2.00 $8,690.00 Furnish and install 1" Schedule 80 PVC; complete Linear 5102 asspecified Feet 750.00 480.00 -270.00 $4.60 $1,242.00 Furnish and install 3" Schedule 40 PVC; complete Linear 1073.00 5130 1 asspecified Feet 1,335.00 2,408.00 1 $6.15 $6,598.95 Furnish and install 3" Linear 5132 Schedule 80 PVC; complete Feet 1 460.00 481.60 21.60 $7.15 $154.44 Furnish and install Type 2 5502 Base; complete as specified Each 8.00 13.00 5.00 $793.00 $3,965.00 Furnish and install Type 5 5504 Base; complete as specified Each 6.00 6.00 $640.00 Furnish and install pull box (steel); 24" x 42"; complete 5018-B as specified Each 5.00 6.00 1.00 $665.00 $665.00 Adjust pull box; complete as 5025-B specified Each 5.00 6.00 1.00 $130.00 $130.00 Furnish and install 1" Schedule 80 PVC; complete Linear 5102-B as specified Feet 1,425.00 0.00 -1425.00 $4.60 $6,555.00 Connect to existing pull box; 5180-B complete as specified Each 1.00 1.00 $130.00 SECTION V - (BID ITEMS 5018-5180-13) - SUBTOTAL NET INCREASE TO: SECTION V NET INCREASE TO SECTIONS 1, 11, III, IV, & V NET DECREASE TO SECTIONS I, 11, III, IV, & V NET INCREASE TO CONTRACT: Page 10 of 10 $11,617.39 ($7,797.00) $3,820.39 $195,081.27 ($149,102.46) $45,978.81