HomeMy WebLinkAbout09. 17-449 SEPTEMBER 12, 2017 17-449 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS
CONTRACT NO. 17-12 MISCELLANEOUS UTILITY
IMPROVMENTS ($116,607.05)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
DORNER, INC.
E506 Luxemburg Road
Luxemburg, WI 54217
Net Increase to contract: $116,607.05
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. Nos. 315-0410-7480-00000 Street Improvement Fund — Streets
ciro�
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works '4'j
DATE: September 7, 2017
RE: Change Order No. 1 for Public Works Contract No. 17-12
Miscellaneous Utility Improvements / Dorner, Inc. (+$116,607.05)
BACKGROUND
Change Order No. 1 for Contract 17-12 is scheduled for consideration by the Common Council at the September
12, 2017 meeting. The contract was originally awarded to Dorner, Inc. in June of 2017. This change order is for
additional work on West Packer Avenue, from Jackson Street to 325' west of Jackson Street. The existing pavement
is extensively cracked and settled, causing ponding water and icing. The bid prices for Contract 17-12 are relatively
low, due to the volume of concrete utility patches bid on this contract and the Contractor is willing to perform this
additional work at those prices.
ANALYSIS
Following is a summary of the significant changes to each section of the Capital Improvements Program (CIP):
• Streets — A portion of the West Packer Avenue repair will be added to Contract 17-12.
FISCAL IMPACT
Contract Section
Change Order Amount
New Contract Total
CIP Budget Amount
Streets
$116,607.05
$158,707.05
$185,000.00
Storm Sewer
$0.00
$57,083.00
$65,000.00
Sanitary Sewer
$0.00
$398,391.00
$500,000.00
Water Main
1 $0.001
$1,480,488.15
$3,386,600.00
Total
1$116,607.051$2,094,669.201$4,136,600.00
Funding for this change order is coming from the Annual Concrete Pavement Repairs project in the Streets section
of the 2017 CIP.
RECOMMENDATIONS
I recommend approval of Change Order No. 1 to Contact No. 17-12 in the amount of +$116,607.05 to Dorner, Inc.
Approv d:
Mark A. Rohloff
City Manager
SMG/tlt
1:\ Engineering \2017 CONTRACTS\17-12 Wtr Mn Page 1 of I
Relays \ Project—Information \ Correspondence \ Memo \ 17-12 Memo for CO #1_9-7-17.docx
TO: Dorner, Inc.
PO Box 129
Luxemburg, WI 54217
CHANGE ORDER #1
DATE: August 30, 2017
Your present contract with the City of Oshkosh, Contract No. 17-12, awarded June 13, 2017, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION 1 $116,607.05
NET INCREASE TO CONTRACT $116,607.05
SECTION I TOTALS
BID TOTAL $1,978,062.15 $1,978,062.16
CO #1 $116,607.05 $116,607.05
CONTRACT TOTAL $2,094,669.20 $2,094,669.20
CITY OF OSHKOSH
M
City Manager
City Clerk
prove a d accepted:
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order,
Approved as to form:
City Attorney
Comptroller
CONTRACT 17-12 CHANGE ORDER #1
SECTION I - ADDITIONAL WORK REQUIRED: CO #1 (W PACKER AVENUE)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
Removing pavement;
Square
1-1100
complete asspecified
Yards
0.00
142.00
142.00
$8.15
$1,157.30
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
1-1120
specified
Feet
0.00
395.00
395.00
$0.60
$237.00
Unclassified excavation;
Cubic
1-1200
complete asspecified
Yards
0.00
112.00
112.00
$14.30
$1,601.60
8" concrete pavement
removal and replacement;
Including sawing; pavement
ties; integral curb and fine
grading; turf restoration; and
traffic control; complete as
Square
1-1318
specified
Yards
0.00
1,320.00
1,320.00
$55.60
$73,392.00
Pavement ties; complete as
1-1350
specified
Each
0.00
45.00
45.00
$9.00
$405.00
Adjust manholes and inlets;
1-1360
complete asspecified
Each
0.00
8.00
8.00
$210.00
$1,680.00
12" radius curb with 6" CABC
and grading; complete as
Linear
1-1410
specified
Feel
0.00
65.00
65.00
$9.50
$617.50
30" curb and gutter; 8'; will)
6" CABC and grading;
Linear
1-1442
complete asspecified
Feet
0.00
10.00
10-00
$23.75
$237.50
Sidewalk curb; complete as
Linear
1-1460
specified
Feet
0.00
15.00
15.00
$25.00
$375.00
6" concrete sidewalk/
driveway /ramp with 3" CABC
and grading; complete as
Square
1-1510
specified
Feet
OM
355.00
355.00
$5.70
$2,023.50
Curb ramp detectable
warning field (natural/non-
painted); complete as
Square
1-1540
specified
Feet
0.00
8.00
8.00
$30.60
$244.80
Drilled No. 4 sidewalk tie
bars - deformed; epoxy -
coated; complete as
1-1560
specified
Each
0.00
8.00
8.00
$5.10
$40.80
Sawing existing pavement;
Linear
1-1700
complete asspecified
Feet
0.00
11.50
11.50
$2.30
$26.45
Sawing concrete pavement
full depth; complete as
Linear
1-1710
specified
Feet
0.00
1,130.00
1,130.00
$3.07
$3,469.10
Base aggregate dense; 3/4';
1-1800
complete asspecified
Tons
0.00
215.00
215.00
$13.30
$2,859.50
Tack coal; complete as
1-1900
s ecified
Gallons
0.00
10.00
10.00
$7.00
$70.00
Asphaltic cold weather
paving; complete as
Square
1-1918
specified
Yards
0.00
145.00
145.00
$15.00
$2,175.00
4" asphaltic surface MT with
8" concrete base course;
Square
1-1920
complete asspecified
Yards
0.00
145.00
145.00
$75.00
$10,875.00
Famish and install 12" storm
Linear
1-2003
sewer; complete asspecified
Feet
0.00
38.00
38.00
$60.00
$2,280.00
Furnish; install; maintain; and
remove Type D modified Inlet
protection; complete as
1-2508
specified
Each
0.00
9.00
9.00
$75.00
$675.00
Sediment removal - Type D
modified inlet protection;
1-2510
complete as s ecified
Each
0.00
9.00
9.00
$5.00
$45.00
Pogo ) of 2
CONTRACT 17-12 CHANGE ORDER #1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
Furnish; Install; maintain; and
remove stone bag; complete
1-2516
as specified
Each
0.00
9.00
9.00
$5.00
$45.00
Abandon 15" and larger
storm sewer; complete as
Linear
1-2802
specified
Feet
0.00
325.00
1 325.00
$25.00
1 $8,125.00
Remove storm sewer
manholes and inlets;
1-2812
complete asspecified
Each
0.00
1.00
1.00
$550.00
$550.00
Connect to existing storm
sewer main; complete as
1-2850
specified
Each
0.00
2.00
2.00
$550.00
$1,100.00
Connect to existing storm
sewer manhole; complete as
1-2856
specified
Each
0.00
1.00
1.00
$1,300.00
$1,300.00
Furnish and Install external
sanitary sewer manhole
chimney seal; complete as
1-3114
specified
Each
0.00
2.00
2.00
$500.00
$1,000.00
SECTION I - (ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1-1100 to 1.3114) • SUBTOTAL $116,607.05
NET INCREASE TO: SECTION 1 $116,607.05
Page 2 of 2