HomeMy WebLinkAbout08. 17-448 SEPTEMBER 12, 2017 17-448 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 17-06 CONCRETE SIDEWALK (NEW & REHABILITATION) ($82,939.65) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: AL DIX CONCRETE, INC. 401 Gertrude Street Kaukauna, WI 54130 Net Increase to contract: $82,939.65 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. Nos. 315-0410-7480-00000 Street Improvement Fund - Streets 551-1910-1799-00000 Sewer Utility— Construction in Progress Citof� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works 51n DATE: September 7, 2017 RE: Change Order No. 1 for Public Works Contract No. 17-06 Concrete Sidewalk (New and Rehabilitation) Al Dix Concrete, Inc. (+$82,939.65) BACKGROUND Change Order No. 1 for Contract 17-06 is scheduled for consideration by the Common Council at the September 12, 2017 meeting. The contract was originally awarded to Al Dix Concrete, Inc. in March of 2017. This change order is for additional work provided to remove and replace cracked and settled concrete pavement in the vicinity of Oshkosh West High School. ANALYSIS Following is a summary of the significant changes to each section of the Capital Improvements Program (CIP): Streets - A portion of Southland Avenue and North Eagle Street were repaired, due to excessive cracking and settlement. Sanitary Sewer - A portion of the costs --" n11—+-1 — +t,- C-4-- 0—.-4-,-- „r 4-k– t -TP due to pavement conditions caused by set FISCAL IMPACT Contract Section Change Order Am Concrete Paving $72,8 Sanitary Sewer $10,0 CIP - Sidewalk Water Utility Operating Property Improvements Park Improvements Total $82,9 L\ Engineering \ 2017 CONTRACTS \ 17-06 Sidewalk Prog \ Project information \ Correspondence \ Memo \ 17-06 Memo for CO N1_9-7-17.doc Funding for this change order is available from the Annual Concrete Paving Repairs project in the 2017 CIP. Funding is available in the relative CIP sections of that project. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 17-06 in the amount of +$82,939.65 to Al Dix Concrete, Inc. Approved: Mark A. Rohloff City Manager SMG/t1t 1: \ Engineering \ 2017 CONTRACTS \ 17-06 Sidewalk Page 2 of 2 Prog \ Project_Information\ Correspondence \ Memo \ 17-06 Memo for CO 4 1 -9-7-17. docx TO: AL DIX CONCRETE, INC. CHANGE ORDER #1 401 GERTRUDE STREET DATE: AUGUST 17, 2017 KAUKAUNA, WI 54130 Your present contract with the City of Oshkosh, Contract No. 17-06, awarded March 28, 2017, is hereby amended and changed as follows: NET INCREASE TO: SECTION [-WORK UNIT D (N EAGLE ST) $82,939.65 SECTION I TOTALS BID TOTAL $1,041,710.90 $1,041,710.90 CO #1 (N EAGLE ST) $82,939.65 $82,939.65 CONTRACT TOTAL $1,124,650.55 $1,124,650.55 CITY OF OSHKOSH City Manager City Clerk Ap roved and accepted: o tractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney Comptroller CONTRACT 17-06 CHANGE ORDER #1 SECTION I: SECTION I - ADDITIONAL WORK REQUIRED: CO #1 (WORK UNIT D - N EAGLE ST) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE Removing curb and gutter; Linear 1-D-1110 complete as specified Feet 0.00 18.60 18.60 $5.00 $93.00 Removing concrete and asphalt sidewalk and driveway; complete as Square 1-D-1120 specified Feet 0.00 225.00 225.00 $1.10 $247.50 8" concrete pavement removal and replacement; including sawing; pavement ties; integral curb and fine grading; turf restoration; and traffic control; complete as Square 1-D-1318 specified Yards 0.00 1,064.10 1,064.10 $66.00 $70,230.60 8" concrete pavement HES removal and replacement; including sawing; pavement ties; integral curb and fine grading; turf restoration; and traffic control; complete as Square 1-D-1319 specified Yards 0.00 140.70 140.70 $69.00 $9,708.30 Pavement ties; complete as 1-D-1350 specified Each 1 0.00 8.00 8.00 1 $7.00 $56.00 30" curb and gutter, 7"; with 5" CABC and grading; Linear 1-D-1440 complete asspecified Feet 0.00 18.60 18.60 $27.00 $50220 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square 1-D-1510 specified Feet 0.00 225.00 225.00 $4.00 $900.00 Curb ramp detectable warning field (natural/non- painted); complete as Square 1-D-1540 Ispecified Feet 0.00 8.00 8.00 $30.00 1 $240.00 Drilled No. 4 sidewalk tie bars - deformed; epoxy -coated; complete as specified 1-D-1560 Each 0.00 4.00 4.00 $4.00 $16.00 Sawing existing pavement full depth; complete as specified Linear 1-D-1710 Feet 0.00 21.10 21.10 $3.50 $73.85 Base aggregate dense; 3/4"; 1-D-1800 1complete asspecified Tons 1 0.00 62.30 62.30 1 1 $14.00 1 $872.20 SECTION I - (ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1-D-1110 - 1-D-1800) - SUBTOTAL $82,939.65 NET INCREASE TO: SECTION 1 $82,939.65 Page 1 of 1