TRAFFIC REVIEW ADVISORY BOARD AND
BICYCLE & PEDESTRIAN ADIVSORY COMMITTEE
JOINT WORKSHOP DISCUSSION TOPICS
SEPTEMBER 12, 2017
TOPICS
.
1. DISCUSSION AND DIRECTION TO STAFF ON WISCONSIN STREET BIKE
LANES
This route is part of the 2011 council approved Bike and Pedestrian Plan. When
Wisconsin Street was reconstructed it was made 54 feet wide in preparation for the
eventual installation of two 4 foot bike lanes. This is also the reason for the curb cut
outs on each side of the bridge that connect the river walk to the road. This route will
connect the Riverwalk to the bike lanes on High Avenue, Algoma Boulevard and Irving
Avenue.
The TRAB voted against this plan at the August 8th meeting.
A compromise might be to start and end bike lanes where the cutouts for the Riverwalk
are on the north side on the bridge and continue them to Irving Avenue. Sharrows
could be incorporated over the bridge if desired.
2. DISCUSSION AND DIRECTION TO STAFF ON WASHINGTON AVENUE BIKE
LANES
Washington Avenue from Main Street to Broad Street is being reconstructed in 2018.
This segment of roadway is slated for bike lanes based on the 2011 Bike and Pedestrian
Plan. This segment would connect to the sharrows and bike lanes on Algoma
Boulevard. The current curb to curb pavement width is 44 feet from Main Street to
Jefferson Street, 36 feet from Jefferson Street to Mt. Vernon Street and 32 feet from Mt.
Vernon Street to Board Street. Please see the attached road profiles.
The following are the current parking stall counts on Washington Avenue:
Main to Jefferson – North Side 4 Parking Stalls
State to Court – South Side 14 Parking Stalls
Court to Broad – South Side 8 Parking Stalls
TRAB AGENDA ITEMS 2 August 2017
Please contact the Traffic Review Advisory Board at TRAB@ci.oshkosh.wi.us with any questions or concerns.
Total Parking Stalls on South Side – 22
Total Parking Stalls on North Side – 4
Please see the attached diagram which illustrates current parking conditions.
The Department of Public Works will be designing Washington Avenue this fall in
preparation for the project to be bid in early 2018. If bicycle amenities are to be
included in the plan it is best to design the street with them included. It is much harder
to retrofit them in at a later date.
2 2 9
216
414
410
406
402
504 508
413
454
109
205
200
108
216
216
112
116
405321313309303
226
304
421417409407403321317
309
525 533
5 0 7
4
0
8
2 2 7
218
220 4 2 4324
5 0 1 5 0 9 5 1 5
4
2
0
4
2
4
4
2
6
4
3
2
4
3
6
4
6
0
219
4
1
5
503A
521
513 517
503 509
529
216
336A
332A
5 0 3 5 1 3 5 1 5
336
332
512 518 520
518A
502 508 510 516
528522
310
511 513 517517A 523 525
3 1 3 A
319A
409A409B 417A
300 306
306A
310
402
412412A 418 420
420A
316
322
331
325
321
319
5 1 6516A
3 0 1 3 0 7307A
4 0 9403 413 427
475
2 2 3
4 2 6
300
206
210
216
220
224226
105
300
302
11 5
224
208
206
112
123
215
20
4
0
1
4
11
4
3
9
4
5
1
106
4
4
8
223
217
212
4
5
0
4
5
6
2 0 4
318
212A
4
0
8
4
0
4
16
2 1 7213
4
4
2
442A
456A
4
5
7
4
5
3
204
9 11 13 17 1921
219
4
4
9
4
3
4
4 3 6
4 6 3
4 6 1459
4
5
7
4
4
5
4 4 1
4
2
7
4
6
0
452
4
4
8
4
3
8
4 3 0
4 2 3
4 1 9
4 1 7
4 1 5
4 1 3
4
0
7
4 2 8
4 2 6
4 2 2
420
416
300
4
5
6
309A
325A
4
2
0
A
312
318
322
315
5 0 3
205
4
6
3
4
1
4
413A413B413C
522A
303
223
2
2
3
A 5 2 52713A
405
4 1 4
4 1 8
4 2 4421
435
4
4
8
A
4
4
8
B
4
4
8
C
4
4
8
D
4 5 2 A 4 5 2 B
4
6
0
4
8
0
4
7
0 7 9 11
4
3
8
A
4
3
8
B
4
4
0
A
4
4
0
B
4 3 6 A
4
3
2
A
4
3
2
B
4
3
4
A
4
3
4
B
4 3 0 A
4 2 8 A
4 2 4 A 4 2 4 B
4 2 2 A 4 2 2 B
4 2 0 A
4 1 8 B
312A
318A
322A
4 2 1 #1421 #2421 #3421 #4
4 0 9 A409B409C
5 0 3 A
517A517B517C517D
2 2 7 A227B
4 0 1
218A
443
440
306
17
City Lot30 Parking Stalls
No On-site Parking
4 Parking
4 Parking 2 8 Parking 2 1 1 Parking4 Parking
4
4
4
7
41
7
City Lot - Permit Parking 20 Stalls
WA SH I N GT ON AVWASHINGTON AV
N
M
A
I
N
S
T
N
M
A
I
N
S
T
N MAIN ST
N MAIN ST
HIGH AVHIGH AV
ALGOMA BLVD
ALGOMA BLVD
WWAAUUGGOOOOAAVV
BBRROOAADD
SSTT
SSTTAATTEE
SSTT
COURT ST
COURT ST
OOTTTTEERRAAVV
J
E
F
F
E
R
S
O
N
S
T
J
E
F
F
E
R
S
O
N
S
T
M
T
V
E
R
N
O
N
S
T
M
T
V
E
R
N
O
N
S
T
N OR T H W E S T E R N AVNORTHWESTERN AV
SCHOOL AVSCHOOL AV
M
A
D
I
S
O
N
S
T
M
A
D
I
S
O
N
S
T
PEARL AVPEARL AV
BBRROOAADD
SSTT
EASEMENT - MISC
EA
S
EM
E
N
T
-
WAT
E
R
I:\Planning\BikePed Committee\Plan Implementation\Washington Avenue Parking.mxd User: alexan
Washington AvenueWashington AvenueParking AnalysisParking Analysis
On-Street_Parking
Other Parking Type
TAG
NO PARKING
LOADING
4 HOUR
30 MINUTE
2 HOUR
1 HOUR
US Highway Anno
State Highway Anno
County Highway Anno
Local Streets Inside ROW Anno
Railroads
City Buildings
Road Right of Way Line
Parcels
PARCELTYPE
parcel
building on leased land
condo
condo common area
gap
overlap
Vacated Right-of-Way
Easement Encroachments
WATER MAIN
PUBLIC UTILITY
PRIVATE UTILITY
SANITARY SEWER; LIFT STATION
STORM SEWER; DRAINAGE; DRAINAGE FEATURE
VISION; WALL
SIDEWALK; PEDESTRIAN; ACCESS
MISC
SANITARY
STORM
WATER
RELEASED
Right of Way
Vacated Right-of-Way
Town Parcels
The City of Oshkosh creates and maintains GIS maps and data for its own use.They may show the approximate relative location of property, boundaries and otherfeature from a variety of sources. These map(s)/datasets are provided forinformation purposes only and may not be sufficient or appropriate for legal,engineering, or surveying purposes. They are provided “AS-IS” without warrantiesof any kind and the City of Oshkosh assumes no liability for use or misuse.
¯1 in = 61 ft1 in = 0.01 mi
Printing Date: 8/28/2017Prepared by: City of Oshkosh, WI
~12'
14'
10'
12'
8'
~12'
~12'
14'
10'
12'
8'
~12'
~12'
14'
10'
12'
8'
~12'
~12'
12'
18'
~10'
8'
~10'
12'
12'
~10'