HomeMy WebLinkAbout14. 17-418 AUGUST 22, 2017 17-418 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 17-04 PAVING, SIDEWALK, DRIVEWAY, & UTILITIES / FIRST LOCAL STREET CONCRETE PAVING PROGRAM (NEAR EAST SIDE) ($358,339.75) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: Carl Bower & Sons N1844 Maloney Road Kaukauna, WI 54130 Net Increase to contract: ($358,339.75) PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. Nos. 311-0410-7480-00000 Sidewalk Construction Fund 317-0410-7480-03304 Special Assessment Fund — Sidewalks 315-0410-7480-00000 Street Improvement Fund — Streets 317-0410-7480-03301 Special Assessments Fund — Streets 541-1810-1799-00000 Water Utility— Construction in Progress 317-0410-7480-03303 Special Assessments Fund —Water 551-1910-1799-00000 Sewer Utility— Construction in Progress 317-0410-7480-03302 Special Assessments Fund — Sewer 561-2010-1799-00000 Storm Utility— Construction in Progress 317-0410-7480-03305 Special Assessments Fund — Storm Water r,A City or Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works $60.4 DATE: August 17, 2017 RE: Change Order No. 1 for Public Works Contract No. 17-04 Paving, Sidewalk, Driveway, & Utilities / First Local Street Concrete Paving Program (Near East Side) Carl Bowers & Sons Construction Co., Inc. (+$358,339.75) BACKGROUND Change Order No. 1 for Contract 17-04 is scheduled for consideration by the Common Council at the August 22, 2017 meeting. The contract was originally awarded to Carl Bowers & Sons Construction Co., Inc. in February of 2017. In February, the storm sewer on Eveline Street failed, causing a sink hole. Upon review of the overall utility conditions on Eveline Street, an emergency was declared to replace the storm sewer, sanitary sewer, and water mains. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Streets — additional quantities for the paving, sidewalk, driveways, and landscaping of Eveline Street. FISCAL IMPACT Contract Section Change Order Amount New Contract Total CIP Budget Amount Concrete Paving $358,339.75 $1,524,872.40 $1,809,600.00 Storm Sewer $0.00 $961,898.50 $1,211,000.00 Sanitary Sewer $0.00 $1,116,140.00 $2,373,100.00 Water Main $0.001 $808,487.00 $1,941,900.00 Total $358,339.75 $4,411,397.90 $7,335,600.00 Adequate funds are available in the relating sections of the 2017 Capital Improvement Budget. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 17-04 in the amount of +$358,339.75 to Carl Bowers & Sons Construction Co., Inc. Approved: Mar A. Rohloff City Manager I: \ Engineering\ 2017 CONTRACTS \ 17-04 Conc Paving & Page 1 of 1 Util \ Project_Information \ Correspondence \ Memo \ 17-04 Memo for CO #1_8-17-17.docx TO: CARL BOWERS & SONS CONST. CO., INC. CHANGE ORDER #1 N1844 MALONEY ROAD DATE: JULY 31, 2017 KAUKAUNA, WI 54130 Your present contract with the City of Oshkosh, Contract No. 17-04, awarded February 28, 2017, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PAVING (EVELINE) $358,339.75 SECTION 1 (PAVING) TOTALS PREVIOUS SECTION TOTAL $1,166,532.65 $1,166,532.65 CO #1 EVELINE $358,339.75 $358,339.75 NEW SECTION TOTAL $1,524,872.40 $1,524,872.40 CITY OF OSHKOSH BY: City Manager City Clerk Approved and accepted: (COfractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney Comptroller CONTRACT 17-04 CHANGE ORDER #1 SECTION I ITEM DESCRIPTION UNIT CURRENT EVELINE NEW UNIT INCREASE IN NUMBER QUANTITY INCREASE QUANTITY PRICE CONTRACT PRICE 1010 Clearing; complete as specified Stations 2.00 $250.00 Inch 1011 Clearing; complete as specified Diameter 72.00 90.00 162.00 $14.00 $1,260.00 Limbing existing trees; complete 1012 as specified Each 49.00 $10.00 1020 Grubbing; complete as specified Stations 2.00 $250.00 Inch 1021 Grubbing; complete as specified Diameter 85.00 90.00 175.00 $20.00 $1,800.00 Removing pavement, complete Square 1100 as specified Yards 10,215.00 4,380.00 14,595.00 $2.50 $10,950.00 Removing concrete and asphalt sidewalk and driveway, complete Square 1120 as specified Feet 45,500.00 19,200.00 64,700.00 $0.50 1 $9,600.00 Salvage and stockpile brick Square 1121 pavers; complete as specified Feet 655.00 $2.00 Unclassified excavation, Cubic 1200 complete as specified Yards 6,995.00 1,560.00 8,555.00 $10.00 $15,600.00 Excavation special (paving); 1220 complete as specified Tons 900.00 200.00 1,100.00 $20.00 $4,000.00 T' concrete pavement; with 5" CABC and grading; complete as Square 1301 specified Yards 14,675.00 4,950.00 19,625.00 $36.25 1 $179,437.50 7" concrete pavement HES; with 5" CABC and grading; complete Square 1303 as specified Yards 0.00 150.00 150.00 $44.25 $6,637.50 Concrete pavement gaps; 1334 complete as specified Each 0.00 1.00 1.00 $1,200.00 $1,200.00 Crushed aggregate base course,- ourse;1340 1340 complete as specified Tons 3,265.00 950.00 4,215.00 $10.00 $9,500.00 Pavement ties; complete as 1350 specified Each 8.00 14.00 22.00 $8.00 $112.00 Drilled dowel bars; 1"; complete 1352 as specified Each 60.00 23.00 83.00 $12.00 $276.00 Adjust manholes and inlets, 1360 complete as specified Each 105.00 40.00 145.00 $275.00 $11,000.00 Turf restoration, complete as Square 1370A specified Yards 5,244.20 $7.00 Turf restoration on Lake Street; Square 1370B complete as specified Yards 3,005.60 $7.00 Turf restoration on Ceape Square 1370C Avenue; complete as specified Yards 674.40 $7.00 Page 1 of 3 CONTRACT 17-04 CHANGE ORDER #1 ITEM DESCRIPTION UNIT CURRENT EVELINE NEW UNIT INCREASE IN NUMBER QUANTITY INCREASE QUANTITY PRICE CONTRACT PRICE Turf restoration on alley east of Bowen Street; complete as Square 1370D specified Yards 375.80 $7.00 Turf restoration on Eveline Square 1370E Street; complete as specified Yards 0.00 1,800.00 1,800.00 $7.00 $12,600.00 Restore gravel driveway/apron; Square 1372 complete as specified Yards 20.00 60.00 80.00 $15.00 $900.00 12" radius curb with 6" CABC and grading, complete as Linear 1410 specified Feet 575.00 135.00 710.00 $7.50 $1,012.50 30" curb and gutter; 7"; with 5" CABC and grading; complete as Linear 1440 specified Feet 150.00 105.00 255.00 $25.00 $2,625.00 30" curb and gutter; plain; 7; with 5" CABC and grading; Linear 1441 complete as specified Feet 2,955.00 $12.00 Sidewalk curb; complete as Linear 1460 specified Feet 70.00 $35.00 4" concrete sidewalk with 3" CABC and grading, complete as Square 1500 specified Feet 27,300.00 10,830.00 38,130.00 $3.80 $41,154.00 6" concrete sidewalk/ driveway/ramp with 3" CABC and Square 1510 grading, complete as specified Feet 17,450.00 1,280.00 18,730.00 $4.25 $5,440.00 6" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as Square 1514 specified Feet 4,305.00 1,280.00 5,585.00 $4.50 $5,760.00 6" concrete step; complete as Square 1530 specified Feet 75.00 155.00 230.00 $45.00 $6,975.00 Curb ramp detectable warning field (natural/non-painted), Square 1540 complete as specified Feet 112.00 72.00 184.00 $30.00 $2,160.00 No. 4 reinforcing rods - deformed, epoxy -coated, Linear 1550 1complete as specified Feet 6,310.00 2,800.00 9,110.00 $1.20 $3,360.00 Drilled No. 4 sidewalk tie bars - deformed, epoxy -coated, 1560 complete as specified Each 380.00 120.00 500.00 $3.50 $420.00 Furnish and install tree; complete 1600 as specified Each 9.00 5.00 14.00 $300.00 $1,500.00 Locate existing property monuments; complete as 1650 specified Each 100.00 35.00 135.00 $33.00 $1,155.00 Page 2 of 3 CONTRACT 17-04 CHANGE ORDER #1 ITEM DESCRIPTION UNIT CURRENT EVELINE NEW UNIT INCREASE IN NUMBER QUANTITY INCREASE QUANTITY PRICE CONTRACT PRICE Replace existing property monuments; complete as 1652 specified Each 51.00 20.00 71.00 $30.00 $600.00 Sawing existing pavement, Linear 1700 complete as specified Feet 875.00 280.00 1,155.00 $2.50 $700.00 Sawing concrete pavement full Linear 1710 depth; complete as specified Feet 55.00 50.00 105.00 $5.00 $250.00 Base aggregate dense; 3/4"; 1800 complete as specified Tons 55.00 $15.00 Base aggregate dense; 1-1/4"; 1801 complete as specified Tons 420.00 $10.00 Base aggregate dense; 3", 1802 complete as specified Tons 690.00 $10.00 1900 Tack coat, complete as specified Gallons 160.00 38.00 198.00 $5.00 $190.00 HMA Pavement LT; complete as 1901 specified Tons 425.00 $64.00 HMA cold weather paving; 1903 complete as specified Tons 100.00 $0.01 4" asphaltic transition LT with 10" CABC and grading; complete as Square 1911 specified Yards 400.00 460.00 860.00 $25.55 $11,753.00 4" asphaltic surface with 6" CABC and grading, complete as Square 1916 specified Yards 180.00 65.00 245.00 $83.25 $5,411.25 2" asphaltic surface LT with 6" CABC and grading; complete as Square 1917 specified Yards 340.00 200.00 540.00 $15.00 $3,000.00 Asphaltic cold weatther paving; Square 1918 Icomplete as specified Yards 140.00 100.00 240.00 $0.01 $1.00 Prepare foundation for asphaltic Lump 1960 paving; complete as specified I Sum 1.00 $26,000.00 $358,339.75 NET INCREASE TO CONTRACT: $358,339.75 Page 3 of 3