Date
June 27,2017
Mr.Allen Davis AECOM Project No.
Director of Community Development 60531430
City of Oshkosh
215 Chruch Avenue
PO Box 1130
Oshkosh,WI 54903-1130
Amendment Request No. 1 for VPLE Support Related to the Site Redevelopment at the Former Buckstaff Facility,
1118 South Main Street,Oshkosh,Wisconsin City Resolution No. 16-552
Dear Mr. Davis,
AECOM Technical Services, Inc. (AECOM)is requesting an amendment to the agreement dated December 14,2016,
OPP-592265. The amendment request includes the following out of scope services:
• Preparation of Low Hazard Exemption for Beneficial Reuse of Recycled Concrete
• Four(4)Weeks of Additional Field Documentation
Low Hazard Exemption for Beneficial Reuse of Recycle Concrete
As a cost effective disposal and reuse option the concrete,masonry and bricks removed from the site during
foundation demolition were stockpile and crushed. The crushed material was planned to be used as site backfill
Voluntary Party Liability Exemption(VPLE)site fill guidance now requires all non-virgin materials added to the site
require prior approval by Wisconsin Department of Natural Resources(WDNR). AECOM received verbal approval
from WDNR to use the material. After further consideration,the WDNR changed their verbal approval to require
laboratory analysis of the material. Subsequently,based on the laboratory results,a Low Hazard Exemption for
beneficial reuse was required to utilize the material. This exemption was prepared and approved by the WDNR. This
work was not anticipated during the preparation of the original proposal.
Additional Field Documentation
The original proposal included five(5)weeks of full time construction documentation. The actual field documentation
extended to 13 weeks. We were able to reduce the number of hours to part time each week to allow the original
budget to be extended to cover an additional four(4)weeks. Therefore,we are requesting an additional four(4)
weeks of construction documentation. The request includes field and office time for AECOM staff,supplies and
equipment. A cost of$4,712 per week has been incurred.
The services provided will be performed in accordance with the 2017 Negotiated Fee Schedule and conditions of the
General Conditions of Service—City of Oshkosh,April 2009,which are expressly incorporated into,and are an
integral part of,our agreement for professional services.
If you have any questions or need to clarify a point, please call any of the undersigned at
920-236-6718.
Yours sincerely,
k ,
Faul F.Timm Kevin L.Brehm, P.E.
Account Manager Associate Vice President
encl: Amendment to Agreement Form
Authorization Form
K:\Projects\60531430_Buckstaff Vple Support\100-Contract\110-Client Contract\60531430_Amendment
Request1.Docx 113
AECOM AECOM
558 North Main Street
Oshkosh,WI,54901
aecom.com
Amendment to Agreement Form
Amendment No. 1
Environmental Consulting Services
Former Buckstaff Facility
AECOM Project No.60531430
City of Oshkosh Resolution No.16-522, P.O.128621
RETURN TO: AECOM Date:June 27,2017
558 North Main Street
Oshkosh,WI 54901
Attention: Paul Timm
Summary: Original Contract Amount: $143,500
Total Previous Amendments: $0.0
Amount this Amendment: $25,000
Revised Contract Amount $168,500
Amendment# Description Amount
1 Low Hazard Exemption $3,500
Low Hazard Exemption Subcontract Laboratory Services $2,650
Four(4)Weeks of Additional Field Documentation($4,712.50/week) $18,850
TOTAL $25,000
K:\Projects\60531430—BuckstaffVple Support\100-Contract\110-Client Contract\60531430_Amendment
Request 1.Docx 2/3
AECOM
AECOM
�j 558 North Main Street
Oshkosh,WI,54901
aecom.com
Authorization
June 27,2017
1 hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract.
I hereby authorize AECOM to proceed with the scope of services outlined in Amendment Request No. 1 to amend
AECOM's Proposal No.OPP-592265 dated December 14,2015 for VPLE Support Services for the Site
Redevelopment of the Former Buckstaff Property, 1118 South Main Street,Oshkosh,Wisconsin,with a revised budget
authorization amount of$168,500 under the general terms and conditions specified in the proposal.
121 11
Signa re Date
Mark A Rohloff
Print Name
City Manager
Title/Organization
ff -i : 0") 1
Si na u re ,�_.
g Date
Pamela R. Ubrig
Print Name
City Clerk
Title/Organization
gnat Date
Lynn A. Lorenson
Print Name
City Attorney
Title/Organization
m)m �& f 1 h
Signature Date
Trena Larson
Print Name
Director of Finance
Title/Organization
K:\Projects\60531430_Buckstaff Vple SupporAl00-Contract\110-Client Contract\60531430_Amendment