HomeMy WebLinkAboutWood Sewer & Oshkosh/Contract15-11, Change No. 1 Oq(e City 0t Oshkosh July 3, 2017 Sue Wood Wood Sewer & Excavating E9238 County Road X New London, WI 54961 RE: Change Order No. 1 Contract 15-11 Dear Ms. Wood: Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Wood Sewer & Excavating regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, ge sRabe, P.E., CPESC Director of Public Works JER/t1t Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) Engineering\2015 CONTRACTS\15-11 San MH Rehab-1&I Reduction Prog\Project-Information\Contract Info\Change Orders\15-11 Executed CO#1 Ltr-7-3-17.docx Page 1 of 1 City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,W1 54903-1130 http://www.ci.oshkosh.wi.us ` TO: WOOD SEWER&EXCAVATING CHANGE ORDER#1 Eg23OCOUNTY ROAD X DATE: JUNE 13. 2U17 NEW LONDON,VV| S4081 Your present contract with the City ofOshkosh, Contract No. 15-11. awarded November 24.2815. iohereby amended and changodaafollows: NET DECREASE TO: SANITARY MANHOLE REHABILITATION ($52'893.43) NET DECREASE TO CONTRACT ($62.8$3.43) TOTALS BID TOTAL $581.801.80 $881,301.80 CO#1 ($5289343) ($62,8$343 CONTRACT TOTAL $828'408.37 �— CITY OFOSHKOSH BY: City Manager Apgroved and Z,/7��7,ontractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within Change Order. Comptroller App CONTRACT:15-11 CHANGE ORDER#1 SECTION I-SANITARY MANHOLE REHABILITATION ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Replace seanitary manhole casting(CITY to furnish 100 casting);complete as Each 118.00 120.00 2.00 $200,00 $400,00 External manhole chimney seal(9");complete as 102 specified Each 1 100.00 89.00 1 -11.00 $430.00 $4,730.00 External manhole chimney seal(Infrahield);complete 103 asspecified Each 11.00 34.00 23.00 $600.00 $13,800.00 8"external manhole chimney seal extension;complete as 104 specified Each 41.00 49.00 8.00 $280.00 $2,240.00 Internal manhole chimney seal(10");complete as 106 specified each 14.00 14.00 1 $290.00 10"internal manhole chimney seal extension;complete as 108 specified Each 3.00 2.00 -1.00 $200.00 $200.00 7"internal manhole chimney seal extension;complete as 110 specified Each 5.00 2.00 1 -3.00 $200.00 $600.00 Re-form/re-shape manhole 111 bench;complete asspecified Each 15.00 0.00 -15.00 $100.00 $1,500.00 Concrete Fidjusting rings; Vertical 112 complete is specified Feet 45.99 47.41 1.42 $270.00 $383.40 Rubber adjusting rings; Vertical 114 complete is specified Feet 5.00 6.92 1.92 1 $600.00 $1,152.00 Reconstrut sanitary sewer manhole(:slurry);complete as Vertical 116 specified Feet 88.96 84.95 -4.01 $590.00 $2,365.90 Furnish and install standard sanitary manhole(4' diameter) ,slurry);complete Vertical 118 asspecified Feet 100.57 107.52 6.95 $830.00 $5,768.50 Saw cut concrete pavement; Linear 122 complete ass ecified Feet 5460.00 3375.60 -2,084.40 $3.00 ($6,253,20) Remove concrete pavement; Square 124 complete asspecified Yards 2275.00 1197,15 -1,077.85 $4.00 $4,311.40 Pavement ties;complete as 126 specified Each 1820.00 1025.00 -795.00 $6.00 $4,770.00 7"concrete pavement; Square 128 complete is specified Yards 2275.00 915.65 -1,359.35 $68.00 $92,435.80 7"concrete pavement(HES); Square 130 complete asspecified Yards 200.00 0.00 -200.00 $75.00 $15,000.00 8"concrete pavement; Square 132 complete asspecified Yards 200.00 15.50 -184.50 $69.00 $12,730.50 8"concrete pavement(HES); Square 134 complete is specified Yards 200.00 40.75 -159.25 $77.00 $12,262.25 Partial depth joints;complete Linear 136 asspecified Feet 100.00 0.00 -100.00 $0.10 $10.00 Page 1 of 3 f CONTRACT:16-11 CHANGE ORDER#1 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish;imitali;maintain;and remove 12 diameter sediment Icgs;complete as Linear 1-2518 specified Feet 0.00 80.00 80.00 $14.00 $1,120.00 Furnish;in:;tall;maintain;and remove tumidity barrier; 1-2526 complete asspecified Each 0.00 2.00 2.00 $1,840.00 $3,680.00 Furnish and install no-mow Square 1-2622 fescue,,complete asspecified Yards 0.00 0.00 $3.00 Furnish and install annual cover crop;complete as Square 1-2624 specified Yards 0.00 285.76 285.76 $3.00 $857.28 Furnish arra install hydraulicaly-applied erosion control product;complete as Square 1-2644 specified Yards 0.00 285.76 285.76 $3.00 $857.28 Furnish and install heavy rip- rap with filtar fabric;complete Square 1-2650 asspecified I Yards 0.00 82.90 82.90 $30.00 $2,487.00 Mobiization;complete as Lump 1-2900 1 specified Sum 0.00 1.00 1.00 $2,800.00 $2,800.00 General excavation; Lump 1-2930 complete as specified Sum 0.00 1.00 1 1.00 $3,100.00 1 $3,100.00 Import clad material; Cubic 1-2932 complete s specified Yards 0.00 203.30 203.30 $18.00 $3,659.40 Furnish and install 12"x 6" factory wyo;complete as 1-10000 specified Each 0.00 3.00 3.00 $400.00 $1,200.00 Furnish and install 12"PVC sanitary main;complete as Linear 1-10001 specified Feet 0.00 52.20 52.20 $115.00 $6,003.00 Furnish and install marker 1-10002 balm compete asspecified Each 0.00 2.00 2.00 $55.00 $110.00 Furnish and Install 1 1/4" smooth dowel bar;complete 1.10003 asspecified Each 0.00 52.00 52.00 $6.00 $416.00 Furnish and install 9"regular concrete;complete as Square 1-10004 specified Yards 0.00 83.53 83.53 $75.00 $6,264.75 Furnish and install 9"HES concrete;complete as Square 1-10005 s ecified Yards 0.00 112.06 112.06 $85.00 $9,525.10 Time and materials for sanitary repair;complete as Lump 1-10010 s ecified Sum 0.00 1 1.00 1 1.00 $6,000.00 $6,000.00 SECTION I-(ADDITIONAL WORK REQUIRED: CO#1 ITEMS 1-2026-1-10010)-SUBTOTAL $66,923.81 $0.00 NET DECREASE TO: SECTION 1 ($62,893.43) NET INCREASE TO SECTION[ $112,236.67 NET DECREASE TO SECTION 1 ($166,130.00) NET DECREASE TO CONTRACT: ($62,893.43) Page 3 of 3