HomeMy WebLinkAboutWood Sewer & Oshkosh/Contract15-11, Change No. 1 Oq(e
City
0t
Oshkosh
July 3, 2017
Sue Wood
Wood Sewer & Excavating
E9238 County Road X
New London, WI 54961
RE: Change Order No. 1
Contract 15-11
Dear Ms. Wood:
Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Wood
Sewer & Excavating regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
ge sRabe, P.E., CPESC
Director of Public Works
JER/t1t
Enclosure: Change Order No. 1
cc: Pam Ubrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director (w/copy)
File (w/original)
Engineering\2015 CONTRACTS\15-11 San MH Rehab-1&I Reduction Prog\Project-Information\Contract
Info\Change Orders\15-11 Executed CO#1 Ltr-7-3-17.docx Page 1 of 1
City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,W1 54903-1130 http://www.ci.oshkosh.wi.us
`
TO: WOOD SEWER&EXCAVATING CHANGE ORDER#1
Eg23OCOUNTY ROAD X DATE: JUNE 13. 2U17
NEW LONDON,VV| S4081
Your present contract with the City ofOshkosh, Contract No. 15-11. awarded November 24.2815. iohereby
amended and changodaafollows:
NET DECREASE TO: SANITARY MANHOLE REHABILITATION ($52'893.43)
NET DECREASE TO CONTRACT ($62.8$3.43)
TOTALS
BID TOTAL $581.801.80 $881,301.80
CO#1 ($5289343) ($62,8$343
CONTRACT TOTAL $828'408.37 �—
CITY OFOSHKOSH
BY:
City Manager
Apgroved and
Z,/7��7,ontractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,
under the within Change Order.
Comptroller
App
CONTRACT:15-11 CHANGE ORDER#1
SECTION I-SANITARY MANHOLE REHABILITATION
ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Replace seanitary manhole
casting(CITY to furnish
100 casting);complete as Each 118.00 120.00 2.00 $200,00 $400,00
External manhole chimney
seal(9");complete as
102 specified Each 1 100.00 89.00 1 -11.00 $430.00 $4,730.00
External manhole chimney
seal(Infrahield);complete
103 asspecified Each 11.00 34.00 23.00 $600.00 $13,800.00
8"external manhole chimney
seal extension;complete as
104 specified Each 41.00 49.00 8.00 $280.00 $2,240.00
Internal manhole chimney
seal(10");complete as
106 specified each 14.00 14.00 1 $290.00
10"internal manhole chimney
seal extension;complete as
108 specified Each 3.00 2.00 -1.00 $200.00 $200.00
7"internal manhole chimney
seal extension;complete as
110 specified Each 5.00 2.00 1 -3.00 $200.00 $600.00
Re-form/re-shape manhole
111 bench;complete asspecified Each 15.00 0.00 -15.00 $100.00 $1,500.00
Concrete Fidjusting rings; Vertical
112 complete is specified Feet 45.99 47.41 1.42 $270.00 $383.40
Rubber adjusting rings; Vertical
114 complete is specified Feet 5.00 6.92 1.92 1 $600.00 $1,152.00
Reconstrut sanitary sewer
manhole(:slurry);complete as Vertical
116 specified Feet 88.96 84.95 -4.01 $590.00 $2,365.90
Furnish and install standard
sanitary manhole(4'
diameter) ,slurry);complete Vertical
118 asspecified Feet 100.57 107.52 6.95 $830.00 $5,768.50
Saw cut concrete pavement; Linear
122 complete ass ecified Feet 5460.00 3375.60 -2,084.40 $3.00 ($6,253,20)
Remove concrete pavement; Square
124 complete asspecified Yards 2275.00 1197,15 -1,077.85 $4.00 $4,311.40
Pavement ties;complete as
126 specified Each 1820.00 1025.00 -795.00 $6.00 $4,770.00
7"concrete pavement; Square
128 complete is specified Yards 2275.00 915.65 -1,359.35 $68.00 $92,435.80
7"concrete pavement(HES); Square
130 complete asspecified Yards 200.00 0.00 -200.00 $75.00 $15,000.00
8"concrete pavement; Square
132 complete asspecified Yards 200.00 15.50 -184.50 $69.00 $12,730.50
8"concrete pavement(HES); Square
134 complete is specified Yards 200.00 40.75 -159.25 $77.00 $12,262.25
Partial depth joints;complete Linear
136 asspecified Feet 100.00 0.00 -100.00 $0.10 $10.00
Page 1 of 3
f
CONTRACT:16-11 CHANGE ORDER#1
ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
Furnish;imitali;maintain;and
remove 12 diameter
sediment Icgs;complete as Linear
1-2518 specified Feet 0.00 80.00 80.00 $14.00 $1,120.00
Furnish;in:;tall;maintain;and
remove tumidity barrier;
1-2526 complete asspecified Each 0.00 2.00 2.00 $1,840.00 $3,680.00
Furnish and install no-mow Square
1-2622 fescue,,complete asspecified Yards 0.00 0.00 $3.00
Furnish and install annual
cover crop;complete as Square
1-2624 specified Yards 0.00 285.76 285.76 $3.00 $857.28
Furnish arra install
hydraulicaly-applied erosion
control product;complete as Square
1-2644 specified Yards 0.00 285.76 285.76 $3.00 $857.28
Furnish and install heavy rip-
rap with filtar fabric;complete Square
1-2650 asspecified I Yards 0.00 82.90 82.90 $30.00 $2,487.00
Mobiization;complete as Lump
1-2900 1 specified Sum 0.00 1.00 1.00 $2,800.00 $2,800.00
General excavation; Lump
1-2930 complete as specified Sum 0.00 1.00 1 1.00 $3,100.00 1 $3,100.00
Import clad material; Cubic
1-2932 complete s specified Yards 0.00 203.30 203.30 $18.00 $3,659.40
Furnish and install 12"x 6"
factory wyo;complete as
1-10000 specified Each 0.00 3.00 3.00 $400.00 $1,200.00
Furnish and install 12"PVC
sanitary main;complete as Linear
1-10001 specified Feet 0.00 52.20 52.20 $115.00 $6,003.00
Furnish and install marker
1-10002 balm compete asspecified Each 0.00 2.00 2.00 $55.00 $110.00
Furnish and Install 1 1/4"
smooth dowel bar;complete
1.10003 asspecified Each 0.00 52.00 52.00 $6.00 $416.00
Furnish and install 9"regular
concrete;complete as Square
1-10004 specified Yards 0.00 83.53 83.53 $75.00 $6,264.75
Furnish and install 9"HES
concrete;complete as Square
1-10005 s ecified Yards 0.00 112.06 112.06 $85.00 $9,525.10
Time and materials for
sanitary repair;complete as Lump
1-10010 s ecified Sum 0.00 1 1.00 1 1.00 $6,000.00 $6,000.00
SECTION I-(ADDITIONAL WORK REQUIRED: CO#1 ITEMS 1-2026-1-10010)-SUBTOTAL $66,923.81 $0.00
NET DECREASE TO: SECTION 1 ($62,893.43)
NET INCREASE TO SECTION[ $112,236.67
NET DECREASE TO SECTION 1 ($166,130.00)
NET DECREASE TO CONTRACT: ($62,893.43)
Page 3 of 3