Loading...
HomeMy WebLinkAboutBowers & Sons Const. & Oshkosh/ Contract 16-09, No. 1 r,A City 0fV Oshkosh June 23, 2017 Mr. Bill Bowers Carl Bowers & Sons Construction Co., Inc. N1844 Maloney Road Kaukauna, WI 54130 RE: Change Order No. 1 Contract 16-09 Dear Mr. Bowers: Enclosed is an executed copy of Change Order No. I between the City of Oshkosh and Carl Bowers & Sons Construction Co., Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, es Rabe, P.E., CPESC Director of Public Works JER/t1t Enclosure: Change Order No. I cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) : Engineering\2016 CONTRACTS\16-09 Wtr Mn Relay&Installation\Project_lnformation\Contract Page 1 of 1 r,fo\Change Orders\16-09 Executed CO#1 Ltr-6-23-17,docx City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1130 http://www.ci.oshkosh.wi.us . , TO: CARL BOWERS&SONS CHANGE ORDER#1 N1D44MALONEY ROAD DATE JUNE 2, 2O17 KAUKAUNA`VVIS413O Your present contract with the City ofOshkosh, Contract No. iG-OA, awarded July 28. 2V1G. ishereby amended and changed aafollows: NET INCREASE TO: SECTION | -PAVING *3.934.28 NET INCREASE TO: SECTION || 'STORM SEWER $3.875.99 NET INCREASE TO: SECTION III -SANITARY SEWER $1.985.48 NET DECREASE TO: SECTION |V-WATER MAIN ($41.814.30) NET DECREASE TOCONTRACT ($32.018.57) SECTION SECTION 11 SECTION III SECTION IV (PAVING) (STORM) (SANITARY) (WATER) TOTALS BID TOTAL $251,624.90 $1061101 $12830177 $446,228.25 $836,765.93 Co#1 COmTRACTTOTAL 96� �- $804,747.36 CITY OFOSHKOSH By: ' City Manager � � City ClerkApproved and accepted: \ certify that provision has been made to pay the liability that will accrue tothe City ufOshkosh,Wisconsin, � under the within Change Order. � � °v "p"w"" ' | � / City � � � � CONTRACT 16-09 CHANGE ORDER#1 SECTION I-PAVING ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Removing pavement; Square 1100 complete as specified Yards 15.00 110.00 95.00 $20.00 $1,900.00 Removing concrete and asphalt sidewalk and driveway;complete as Square 1120 specified Feet 3,335.00 1,308.10 -2,026.90 $0.70 $1,418.83 7"concrete pavement removal and replacement; including sawing;pavement ties;integral curb and fine grading;turf restoration; and traffic control;complete as Square 1308 specified Yards 500.00 570.00 70.00 $64.30 $4,501.00 8"concrete pavement removal and replacement; including sawing;pavement ties;integral curb and fine grading;turf restoration; and traffic control;complete as Square 1318 specified Yards 410.00 435.43 25.43 $69.30 $1,762.30 Adjust manholes and inlets; 1360 complete as specified Each 4.00 6.00 2.00 $250.00 $500.00 Turf restoration;complete as Square 1370 specified Yards 260.00 629.40 369.40 $7.00 $2,585.80 12"radius curb with 6"CABC and grading;complete as Linear 1410 specified Feet 70.00 47.70 -22.30 $12.00 $267.60 30"curb and gutter;7";with 5"CABC and grading; Linear 1440 complete as specified Feet 420.00 82.20 -337.80 $28.00 $9,458.40 4"concrete sidewalk with 3" CABC and grading;complete Square 1500 as specified Feet 4,630.00 1,096.40 -3,533.60 $4.50 $15,901.20 6"concrete sidewalk/ driveway/ramp with 3"CABC and grading;complete as Square 1510 specified Feet 190.00 211.70 21.70 $5.25 $113.93 Curb ramp detectable warning field(natural/non- painted);complete as Square 1540 specified Feet 24.00 32.00 8.00 $30.00 $240.00 No.4 reinforcing rods- deformed;epoxy-coated; Linear 1550 complete as specified Feet 1,460.00 198.50 -1,261.50 $1.20 $1,513.80 Drilled No.4 sidewalk tie bars deformed;epoxy-coated; 1560 complete as specified Each 250.00 56.00 -194.00 $4.00 $776.00 Sawing existing pavement; Linear 1700 complete as specified Feet 5,100.00 4,921.00 -179.00 $1.50 $268.50 Tack coat;complete as 1900 specified Gallons 608.00 456.00 -152.00 $3.50 $532.00 HMA Pavement Type E-1.0; 1902 complete as specified Tons 1,260.00 1,221.23 -38.77 $58.50 $2,268.05 5"asphaltic pavement with 10"CABC and grading; Square 1905 complete as specified Yards 20.00 23.00 3.00 $48.50 $145.50 2"asphaltic pavement with 10"CABC and grading; Square 1907 complete as specified Yards 3,254.00 2,709.60 -544.40 $9.10 $4,954.04 Page 1 of 6 CONTRACT 16-09 CHANGE ORDER#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Asphaltic pavement milling; Square 1950 complete as specified Yards 8,530.00 8,452.20 -77.80 $1.95 $151.71 Prepare foundation for asphaltic paving;complete as Lump 1960 specified Sum 1.00 1.00 $17,000.00 SECTION I-(BID ITEMS 1100-1960)-SUBTOTAL $11,748.53 ($37,510.13) SECTION I-ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Excavation(8"thick); including rock;complete as Square 1-10000 specified Yards 0.00 1,649.77 1,649.77 $18.00 $29,695.86 SECTION I-(ADDITIONAL WORK REQUIRED: CO#1 -ITEM 1-10000)-SUBTOTAL $29,695.86 $0.00 NET INCREASE TO: SECTION 1 $3,934.26 SECTION II-STORM SEWER ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install 6"storm sewer lateral;complete as Linear 2400 specified Feet 90.00 36.00 -54.00 $38.00 $2,052.00 Furnish and install storm sewer marker balls;complete 2404 as specified Each 8.00 4.00 -4.00 $30.00 $120.00 Furnish and install storm sewer clay dams;complete 2406 as specified Each 4.00 2.00 -2.00 $30.00 $60.00 Furnish and install storm sewer lateral inlet;complete 2408 as specified Each 2.00 1.00 -1.00 $400.00 $400.00 Furnish;install; maintain;and remove Type D modified inlet protection;complete as 2508 specified Each 41.00 15.00 -26.00 $90.00 $2,340.00 Sediment removal-Type D modified inlet protection; 2510 complete as specified Each 41.00 0.00 -41.00 $1.00 $41.00 Furnish;install; maintain;and remove stone tracking pad; 2512 complete as specified Each 1.00 0.00 -1.00 $0.01 $0.01 Furnish;install;maintain;and remove stone bag; complete 2516 as specified Each 30.00 0.00 -30.00 $10.00 $300.00 Furnish;install;maintain;and remove 12"diameter sediment logs;complete as Linear 2518 specified Feet 20.00 0.00 -20.00 $10.00 $200.00 Connect to existing storm sewer lateral;complete as 2852 specified Each 3.00 2.00 -1.00 $400.00 $400.00 Page 2 of 6 CONTRACT 16.09 CHANGE ORDER#1 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Storm sewer utility line opening(ULO);complete as 2914 specified Each 1.00 0.00 -1.00 $600.00 $600.00 SECTION II-(BID ITEMS 2400-2914)-SUBTOTAL $0.00 ($6,513.01) SECTION II-ADDITIONAL WORK REQUIRED: CO#1 ITEMCONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Install storm sewer;manhole and inlet on Sawyer Street; time and materials;complete Lump 1-20000 as specified Sum 0.00 1.00 1 1.00 $10,389.00 $10,389.00 SECTION II-(ADDITIONAL WORK REQUIRED: CO#1 -ITEM 1-20000)-SUBTOTAL $10,389.00 $0.00 NET INCREASE TO: SECTION II $3,875.99 SECTION III-SANITARY SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPR/CE Furnish and install 8"sanitary sewer(relay);complete as Linear 3000 specified Feet 850.00 798.00 -52.00 $82.00 $4,264.00 Furnish and install 10" sanitary sewer(relay); Linear 3002 complete as specified Feet 75.00 78.00 3.00 $90.00 $270.00 Furnish and install 10" sanitary sewer drop; Vertical 3062 complete asspecified Feet 3.00 3.10 0.10 $450.00 $45.00 Furnish and install standard sanitary sewer manhole(4' diameter);complete as Vertical 3100 specified Feet 30.30 27.00 -3.30 $270.00 $891.00 Furnish and install external sanitary sewer manhole chimney seal;complete as :3114 specified Each 2.00 0.00 -2.00 $400.00 $800.00 Furnish and install internal sanitary sewer manhole chimney seal;complete as 3118 specified Each 2.00 0.00 -2.00 $300.00 $600.00 Furnish and install 8"x 6" sanitary sewer factory wyes 3210 or tees;complete as specified Each 12.00 17.00 5.00 $80.00 $400.00 Furnish and install 6"sanitary sewer"Insert-A-Tee"or"Kor- N-Tee';complete as 3222 specified Each 3.00 0.00 -3.00 $150.00 $450.00 Furnish and install 4"/6" sanitary sewer lateral(relay); Linear 3234 complete asspecified Feet 425.00 228.00 -197.00 $68.00 $13,396.00) Furnish and install sanitary sewer lateral marker balls; 3236 complete as specified Each 24.00 28.00 4.00 $30.00 $120.00 Furnish and install clay dams; 3238 com tete as specified Each 12.00 15.00 3.00 $100.00 $300.00 Page 3 of 6 CONTRACT 16-09 CHANGE ORDER#1 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install connection to existing 8"mains;complete 3300 as specified Each 6.00 8.00 2.00 $600.00 $1,200.00 Furnish and install connection to existing 10"mains; 3302 complete as specified Each 3.00 4.00 1.00 $1,000.00 $1,000.00 Furnish and install sanitary sewer concrete collars; 3330 complete asspecified Each 2.00 0.00 -2.00 $0.01 $0.02 Rock excavation;complete as Cubic 3600 specified Yards 75.00 0.00 -75.00 $0.01 $0.75 Closed circuit televising; Linear 3700 complete asspecified Feet 925.00 0.00 -925.00 $2.00 $1,850.00 Abandon 8"sanitary sewer; Linear 3802 complete as specified Feet 40.00 39.00 -1.00 $6.00 $6.00 SECTION 111-(BID ITEMS 3000-3802)-SUBTOTAL $3,335.00 ($22,257.77) SECTION III-ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Sanitary main televising 1-30000 launch;complete as specified Each 0.00 13.00 13.00 $350.00 $4,550.00 Sanitary main televising; Linear 1-30001 complete asspecified Feet 0.00 2,947.20 2,947.20 $1.00 $2,947.20 Sanitary lateral televising 1-30002 launch;complete asspecified Each 0.00 61.00 61.00 $100.00 $6,100.00 Sanitary lateral televising; Linear 1-30003 complete as specified Feet 0.00 2,360.70 2,360.70 $1.50 $3,541.05 Sanitary lateral push cam televising;complete as 1-30004 specified Each 0.00 2.00 2.00 $185.00 $370.00 Mobilization for unmarked sanitary lateral;complete as Lump 1-30005 specified Sum 0.00 1.00 1.00 $1,000.00 $1,000.00 Remove and replace sanitary manhole;time and materials; Lump 1-30006 complete as specified Sum 0.00 1.00 1.00 $2,400.00 $2,400.00 SECTION III-(ADDITIONAL WORK REQUIRED: CO#1 -ITEMS 1-30000-1-30006)-SUBTOTAL $20,908.25 $0.00 NET INCREASE TO: SECTION 111 $1,985.48 SECTION IV-WATER MAIN ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 4"ductile iron water main(relay)with polywrap;complete as Linear 4000 specified Feet 10.00 5.50 -4.50 $120.00 $540.00 Furnish and install 6"ductile iron water main(relay)with polywrap;complete as Linear 4002 specified Feet 260.00 253.00 -7.00 $75.00 $525.00 Furnish and install 8"ductile iron water main(relay)with polywrap;complete as Linear 4004 specified Feet 2,805.00 2,743.00 -62.00 $82.65 $5,124.30 Page 4 of 6 CONTRACT 16-09 CHANGE ORDER#1 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 12"ductile iron water main(relay)with polywrap and TR Flex restrained joints;complete as Linear 4009 specified Feet 25.00 18.00 -7.00 $130.00 $910.00 Furnish and install 1"water service(relay);complete,as Linear 4036 specified Feet 1,650.00 1,372.00 -278.00 $40.00 $11,120.00 Furnish and install 2"water service(relay);complete as Linear 4040 specified Feet 20.00 0.00 -20.00 $71.00 $1,420.00 Furnish and install 1" corporation and stop box; 4048 complete as specified Each 53.00 50.00 -3.00 $300.00 $900.00 Furnish and install 2" corporation and stop box; 4053 complete as specified Each 1.00 0.00 -1.00 $1,000.00 $1,000.00 Furnish and install water service clay dams;complete 4055 as specified Each 57.00 56.00 -1.00 $75.00 $75.00 Furnish and install connections to existing 4" water main;complete as 4056 specified Each 1,00 1.00 $1,100.00 Furnish and install connections to existing 6" water main;complete as 4058 specified Each 5.00 4.00 -1.00 $1,400.00 $1,400.00 Furnish and install connections to existing 8" water main;complete as 4060 specified Each 1.00 1.00 $1,500.00 Furnish and install connections to existing 12" water main;complete as 4064 specified Each 4.00 2.00 -2.00 $1,800.00 $3,600.00 Furnish and install 8"x 4" water main tee;complete as 4109 specified Each 1.00 1.00 $325.00 Furnish and install 8"x 6" water main tee;complete as 4110 specified Each 7.00 8.00 1.00 $400.00 $400.00 Furnish and install 6"x 8" water main cross;complete 4182 as specified Each 2.00 2.00 $550.00 Furnish and install 8"x 12" water main cross;complete 4191 asspecified Each 1.00 1.00 $900.00 Furnish and install 4"45 degree water main bend; 4235 complete asspecified Each 2.00 2.00 $200.00 Furnish and install 6"45 degree water main bend; 4236 complete as specified Each 14.00 4.00 -10.00 $225.00 $2,250.00 Furnish and install 8"45 degree water main bend; 4237 complete as specified Each 4.00 0.00 -4.00 $300.00 $1,200.00 Furnish and install 12"45 degre water main bend; 4239 complete as specified Each 4.00 2.00 -2.00 $600.00 $1,200.00 Page 5 of 6 CONTRACT 16-09 CHANGE ORDER#1 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 8"x 6" water main reducer;complete 4264 as specified Each 1.00 1.00 $275.00 Cut and cap existing 6"water 4352 main;complete asspecified Each 1.00 0.00 -1.00 $700.00 $700.00 Cut and cap existing 8"water 4354 main;complete as specified Each 1.00 0.00 -1.00 $800.00 $800.00 Cut and cap existing 12" water main;complete as 4358 specified Each 1.00 0.00 -1.00 $1,200:00 $1,200.00 Furnish and install 4"water main gate valve;complete as 4400 specified Each 1.00 1.00 $1,000.00 Furnish and install 6"water main gate valve;complete as 4401 specified Each 12.00 9.00 -3.00 $1,200.00 ($3,600.00) Furnish and install 8"water main gate valve;complete as 4402 specified Each 12.00 11.00 -1.00 $1,600.00 $1,600.00 Furnish and install 12"water main gate valve;complete as 4404 specified Each 1.00 0.00 -1.00 $2,700.00 $2,700.00 Furnish and install 6"x 6" tapping valve and sleeve; 4419 complete asspecified Each 1.00 0.00 -1.00 $2,500.00 $2,500.00 Furnish and install hydrant; 4500 complete as specified Each 8.00 7.00 -1.00 $3,500.00 $3,500.00 water main onW5th Avenue;complete as Lump 490]Abandon s ecified Sum 1.00 1.00 $2,000.00 SECTION IV-(BID ITEMS 4000-4900)-SUBTOTAL $400.00 ($47,864.30) SECTION IV-ADDITIONAL WORK REQUIRED: CO#1 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE 1N NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 12"22.5 degree bends;complete as 1-4230 specified Each 0.00 2.00 2.00 $600.00 $1,200.00 Install hydrant only;complete 1-40000 as specified Each 0.00 2.00 2.00 $1,500.00 $3,000.00 Install 8"gate valve only; 1-40002 complete as specified Each 0.00 1.00 1.00 $500.00 $500.00 Install 6"gate valve only; 1-40003 complete as specified Each 0.00 2.00 2.00 $475.00 $950.00 SECTION IV-(ADDITIONAL.WORK REQUIRED:CO#1-ITEMS 1-4230-1-40003)-SUBTOTAL $5,650.00 $0.00 NET DECREASE TO: SECTION IV ($41,814.30) NET INCREASE TO SECTIONS I,II,III,&IV $82,126.64 NET DECREASE TO SECTIONS 1,11,III,&IV ($114,146.21) NET DECREASE TO CONTRACT: ($32,018.57) Page 6 of 6