June 23, 2017
Mr. Bill Bowers
Carl Bowers & Sons Construction Co., Inc.
N1844 Maloney Road
Kaukauna, WI 54130
RE: Change Order No. 1
Contract 16-09
Dear Mr. Bowers:
Enclosed is an executed copy of Change Order No. I between the City of Oshkosh and Carl
Bowers & Sons Construction Co., Inc. regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
es Rabe, P.E., CPESC
Director of Public Works
JER/t1t
Enclosure: Change Order No. I
cc: Pam Ubrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director (w/copy)
File (w/original)
: Engineering\2016 CONTRACTS\16-09 Wtr Mn Relay&Installation\Project_lnformation\Contract Page 1 of 1
r,fo\Change Orders\16-09 Executed CO#1 Ltr-6-23-17,docx
City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1130 http://www.ci.oshkosh.wi.us
. ,
TO: CARL BOWERS&SONS CHANGE ORDER#1
N1D44MALONEY ROAD DATE JUNE 2, 2O17
KAUKAUNA`VVIS413O
Your present contract with the City ofOshkosh, Contract No. iG-OA, awarded July 28. 2V1G. ishereby
amended and changed aafollows:
NET INCREASE TO: SECTION | -PAVING *3.934.28
NET INCREASE TO: SECTION || 'STORM SEWER $3.875.99
NET INCREASE TO: SECTION III -SANITARY SEWER $1.985.48
NET DECREASE TO: SECTION |V-WATER MAIN ($41.814.30)
NET DECREASE TOCONTRACT ($32.018.57)
SECTION SECTION 11 SECTION III SECTION IV
(PAVING) (STORM) (SANITARY) (WATER) TOTALS
BID TOTAL $251,624.90 $1061101 $12830177 $446,228.25 $836,765.93
Co#1
COmTRACTTOTAL 96� �- $804,747.36
CITY OFOSHKOSH
By: '
City Manager
�
�
City ClerkApproved and accepted:
\
certify that provision has been made to pay the liability that will accrue tothe City ufOshkosh,Wisconsin, �
under the within Change Order. �
�
°v "p"w"" '
|
�
/
City
�
�
�
�
CONTRACT 16-09 CHANGE ORDER#1
SECTION I-PAVING
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Removing pavement; Square
1100 complete as specified Yards 15.00 110.00 95.00 $20.00 $1,900.00
Removing concrete and
asphalt sidewalk and
driveway;complete as Square
1120 specified Feet 3,335.00 1,308.10 -2,026.90 $0.70 $1,418.83
7"concrete pavement
removal and replacement;
including sawing;pavement
ties;integral curb and fine
grading;turf restoration; and
traffic control;complete as Square
1308 specified Yards 500.00 570.00 70.00 $64.30 $4,501.00
8"concrete pavement
removal and replacement;
including sawing;pavement
ties;integral curb and fine
grading;turf restoration; and
traffic control;complete as Square
1318 specified Yards 410.00 435.43 25.43 $69.30 $1,762.30
Adjust manholes and inlets;
1360 complete as specified Each 4.00 6.00 2.00 $250.00 $500.00
Turf restoration;complete as Square
1370 specified Yards 260.00 629.40 369.40 $7.00 $2,585.80
12"radius curb with 6"CABC
and grading;complete as Linear
1410 specified Feet 70.00 47.70 -22.30 $12.00 $267.60
30"curb and gutter;7";with
5"CABC and grading; Linear
1440 complete as specified Feet 420.00 82.20 -337.80 $28.00 $9,458.40
4"concrete sidewalk with 3"
CABC and grading;complete Square
1500 as specified Feet 4,630.00 1,096.40 -3,533.60 $4.50 $15,901.20
6"concrete sidewalk/
driveway/ramp with 3"CABC
and grading;complete as Square
1510 specified Feet 190.00 211.70 21.70 $5.25 $113.93
Curb ramp detectable
warning field(natural/non-
painted);complete as Square
1540 specified Feet 24.00 32.00 8.00 $30.00 $240.00
No.4 reinforcing rods-
deformed;epoxy-coated; Linear
1550 complete as specified Feet 1,460.00 198.50 -1,261.50 $1.20 $1,513.80
Drilled No.4 sidewalk tie bars
deformed;epoxy-coated;
1560 complete as specified Each 250.00 56.00 -194.00 $4.00 $776.00
Sawing existing pavement; Linear
1700 complete as specified Feet 5,100.00 4,921.00 -179.00 $1.50 $268.50
Tack coat;complete as
1900 specified Gallons 608.00 456.00 -152.00 $3.50 $532.00
HMA Pavement Type E-1.0;
1902 complete as specified Tons 1,260.00 1,221.23 -38.77 $58.50 $2,268.05
5"asphaltic pavement with
10"CABC and grading; Square
1905 complete as specified Yards 20.00 23.00 3.00 $48.50 $145.50
2"asphaltic pavement with
10"CABC and grading; Square
1907 complete as specified Yards 3,254.00 2,709.60 -544.40 $9.10 $4,954.04
Page 1 of 6
CONTRACT 16-09 CHANGE ORDER#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
Asphaltic pavement milling; Square
1950 complete as specified Yards 8,530.00 8,452.20 -77.80 $1.95 $151.71
Prepare foundation for
asphaltic paving;complete as Lump
1960 specified Sum 1.00 1.00 $17,000.00
SECTION I-(BID ITEMS 1100-1960)-SUBTOTAL $11,748.53 ($37,510.13)
SECTION I-ADDITIONAL WORK REQUIRED: CO#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
Excavation(8"thick);
including rock;complete as Square
1-10000 specified Yards 0.00 1,649.77 1,649.77 $18.00 $29,695.86
SECTION I-(ADDITIONAL WORK REQUIRED: CO#1 -ITEM 1-10000)-SUBTOTAL $29,695.86 $0.00
NET INCREASE TO: SECTION 1 $3,934.26
SECTION II-STORM SEWER
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
Furnish and install 6"storm
sewer lateral;complete as Linear
2400 specified Feet 90.00 36.00 -54.00 $38.00 $2,052.00
Furnish and install storm
sewer marker balls;complete
2404 as specified Each 8.00 4.00 -4.00 $30.00 $120.00
Furnish and install storm
sewer clay dams;complete
2406 as specified Each 4.00 2.00 -2.00 $30.00 $60.00
Furnish and install storm
sewer lateral inlet;complete
2408 as specified Each 2.00 1.00 -1.00 $400.00 $400.00
Furnish;install; maintain;and
remove Type D modified inlet
protection;complete as
2508 specified Each 41.00 15.00 -26.00 $90.00 $2,340.00
Sediment removal-Type D
modified inlet protection;
2510 complete as specified Each 41.00 0.00 -41.00 $1.00 $41.00
Furnish;install; maintain;and
remove stone tracking pad;
2512 complete as specified Each 1.00 0.00 -1.00 $0.01 $0.01
Furnish;install;maintain;and
remove stone bag; complete
2516 as specified Each 30.00 0.00 -30.00 $10.00 $300.00
Furnish;install;maintain;and
remove 12"diameter
sediment logs;complete as Linear
2518 specified Feet 20.00 0.00 -20.00 $10.00 $200.00
Connect to existing storm
sewer lateral;complete as
2852 specified Each 3.00 2.00 -1.00 $400.00 $400.00
Page 2 of 6
CONTRACT 16.09 CHANGE ORDER#1
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Storm sewer utility line
opening(ULO);complete as
2914 specified Each 1.00 0.00 -1.00 $600.00 $600.00
SECTION II-(BID ITEMS 2400-2914)-SUBTOTAL $0.00 ($6,513.01)
SECTION II-ADDITIONAL WORK REQUIRED: CO#1
ITEMCONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Install storm sewer;manhole
and inlet on Sawyer Street;
time and materials;complete Lump
1-20000 as specified Sum 0.00 1.00 1 1.00 $10,389.00 $10,389.00
SECTION II-(ADDITIONAL WORK REQUIRED: CO#1 -ITEM 1-20000)-SUBTOTAL $10,389.00 $0.00
NET INCREASE TO: SECTION II $3,875.99
SECTION III-SANITARY SEWER
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPR/CE
Furnish and install 8"sanitary
sewer(relay);complete as Linear
3000 specified Feet 850.00 798.00 -52.00 $82.00 $4,264.00
Furnish and install 10"
sanitary sewer(relay); Linear
3002 complete as specified Feet 75.00 78.00 3.00 $90.00 $270.00
Furnish and install 10"
sanitary sewer drop; Vertical
3062 complete asspecified Feet 3.00 3.10 0.10 $450.00 $45.00
Furnish and install standard
sanitary sewer manhole(4'
diameter);complete as Vertical
3100 specified Feet 30.30 27.00 -3.30 $270.00 $891.00
Furnish and install external
sanitary sewer manhole
chimney seal;complete as
:3114 specified Each 2.00 0.00 -2.00 $400.00 $800.00
Furnish and install internal
sanitary sewer manhole
chimney seal;complete as
3118 specified Each 2.00 0.00 -2.00 $300.00 $600.00
Furnish and install 8"x 6"
sanitary sewer factory wyes
3210 or tees;complete as specified Each 12.00 17.00 5.00 $80.00 $400.00
Furnish and install 6"sanitary
sewer"Insert-A-Tee"or"Kor-
N-Tee';complete as
3222 specified Each 3.00 0.00 -3.00 $150.00 $450.00
Furnish and install 4"/6"
sanitary sewer lateral(relay); Linear
3234 complete asspecified Feet 425.00 228.00 -197.00 $68.00 $13,396.00)
Furnish and install sanitary
sewer lateral marker balls;
3236 complete as specified Each 24.00 28.00 4.00 $30.00 $120.00
Furnish and install clay dams;
3238 com tete as specified Each 12.00 15.00 3.00 $100.00 $300.00
Page 3 of 6
CONTRACT 16-09 CHANGE ORDER#1
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install connection
to existing 8"mains;complete
3300 as specified Each 6.00 8.00 2.00 $600.00 $1,200.00
Furnish and install connection
to existing 10"mains;
3302 complete as specified Each 3.00 4.00 1.00 $1,000.00 $1,000.00
Furnish and install sanitary
sewer concrete collars;
3330 complete asspecified Each 2.00 0.00 -2.00 $0.01 $0.02
Rock excavation;complete as Cubic
3600 specified Yards 75.00 0.00 -75.00 $0.01 $0.75
Closed circuit televising; Linear
3700 complete asspecified Feet 925.00 0.00 -925.00 $2.00 $1,850.00
Abandon 8"sanitary sewer; Linear
3802 complete as specified Feet 40.00 39.00 -1.00 $6.00 $6.00
SECTION 111-(BID ITEMS 3000-3802)-SUBTOTAL $3,335.00 ($22,257.77)
SECTION III-ADDITIONAL WORK REQUIRED: CO#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Sanitary main televising
1-30000 launch;complete as specified Each 0.00 13.00 13.00 $350.00 $4,550.00
Sanitary main televising; Linear
1-30001 complete asspecified Feet 0.00 2,947.20 2,947.20 $1.00 $2,947.20
Sanitary lateral televising
1-30002 launch;complete asspecified Each 0.00 61.00 61.00 $100.00 $6,100.00
Sanitary lateral televising; Linear
1-30003 complete as specified Feet 0.00 2,360.70 2,360.70 $1.50 $3,541.05
Sanitary lateral push cam
televising;complete as
1-30004 specified Each 0.00 2.00 2.00 $185.00 $370.00
Mobilization for unmarked
sanitary lateral;complete as Lump
1-30005 specified Sum 0.00 1.00 1.00 $1,000.00 $1,000.00
Remove and replace sanitary
manhole;time and materials; Lump
1-30006 complete as specified Sum 0.00 1.00 1.00 $2,400.00 $2,400.00
SECTION III-(ADDITIONAL WORK REQUIRED: CO#1 -ITEMS 1-30000-1-30006)-SUBTOTAL $20,908.25 $0.00
NET INCREASE TO: SECTION 111 $1,985.48
SECTION IV-WATER MAIN
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install 4"ductile
iron water main(relay)with
polywrap;complete as Linear
4000 specified Feet 10.00 5.50 -4.50 $120.00 $540.00
Furnish and install 6"ductile
iron water main(relay)with
polywrap;complete as Linear
4002 specified Feet 260.00 253.00 -7.00 $75.00 $525.00
Furnish and install 8"ductile
iron water main(relay)with
polywrap;complete as Linear
4004 specified Feet 2,805.00 2,743.00 -62.00 $82.65 $5,124.30
Page 4 of 6
CONTRACT 16-09 CHANGE ORDER#1
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install 12"ductile
iron water main(relay)with
polywrap and TR Flex
restrained joints;complete as Linear
4009 specified Feet 25.00 18.00 -7.00 $130.00 $910.00
Furnish and install 1"water
service(relay);complete,as Linear
4036 specified Feet 1,650.00 1,372.00 -278.00 $40.00 $11,120.00
Furnish and install 2"water
service(relay);complete as Linear
4040 specified Feet 20.00 0.00 -20.00 $71.00 $1,420.00
Furnish and install 1"
corporation and stop box;
4048 complete as specified Each 53.00 50.00 -3.00 $300.00 $900.00
Furnish and install 2"
corporation and stop box;
4053 complete as specified Each 1.00 0.00 -1.00 $1,000.00 $1,000.00
Furnish and install water
service clay dams;complete
4055 as specified Each 57.00 56.00 -1.00 $75.00 $75.00
Furnish and install
connections to existing 4"
water main;complete as
4056 specified Each 1,00 1.00 $1,100.00
Furnish and install
connections to existing 6"
water main;complete as
4058 specified Each 5.00 4.00 -1.00 $1,400.00 $1,400.00
Furnish and install
connections to existing 8"
water main;complete as
4060 specified Each 1.00 1.00 $1,500.00
Furnish and install
connections to existing 12"
water main;complete as
4064 specified Each 4.00 2.00 -2.00 $1,800.00 $3,600.00
Furnish and install 8"x 4"
water main tee;complete as
4109 specified Each 1.00 1.00 $325.00
Furnish and install 8"x 6"
water main tee;complete as
4110 specified Each 7.00 8.00 1.00 $400.00 $400.00
Furnish and install 6"x 8"
water main cross;complete
4182 as specified Each 2.00 2.00 $550.00
Furnish and install 8"x 12"
water main cross;complete
4191 asspecified Each 1.00 1.00 $900.00
Furnish and install 4"45
degree water main bend;
4235 complete asspecified Each 2.00 2.00 $200.00
Furnish and install 6"45
degree water main bend;
4236 complete as specified Each 14.00 4.00 -10.00 $225.00 $2,250.00
Furnish and install 8"45
degree water main bend;
4237 complete as specified Each 4.00 0.00 -4.00 $300.00 $1,200.00
Furnish and install 12"45
degre water main bend;
4239 complete as specified Each 4.00 2.00 -2.00 $600.00 $1,200.00
Page 5 of 6
CONTRACT 16-09 CHANGE ORDER#1
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install 8"x 6"
water main reducer;complete
4264 as specified Each 1.00 1.00 $275.00
Cut and cap existing 6"water
4352 main;complete asspecified Each 1.00 0.00 -1.00 $700.00 $700.00
Cut and cap existing 8"water
4354 main;complete as specified Each 1.00 0.00 -1.00 $800.00 $800.00
Cut and cap existing 12"
water main;complete as
4358 specified Each 1.00 0.00 -1.00 $1,200:00 $1,200.00
Furnish and install 4"water
main gate valve;complete as
4400 specified Each 1.00 1.00 $1,000.00
Furnish and install 6"water
main gate valve;complete as
4401 specified Each 12.00 9.00 -3.00 $1,200.00 ($3,600.00)
Furnish and install 8"water
main gate valve;complete as
4402 specified Each 12.00 11.00 -1.00 $1,600.00 $1,600.00
Furnish and install 12"water
main gate valve;complete as
4404 specified Each 1.00 0.00 -1.00 $2,700.00 $2,700.00
Furnish and install 6"x 6"
tapping valve and sleeve;
4419 complete asspecified Each 1.00 0.00 -1.00 $2,500.00 $2,500.00
Furnish and install hydrant;
4500 complete as specified Each 8.00 7.00 -1.00 $3,500.00 $3,500.00
water main onW5th Avenue;complete as Lump
490]Abandon
s ecified Sum 1.00 1.00 $2,000.00
SECTION IV-(BID ITEMS 4000-4900)-SUBTOTAL $400.00 ($47,864.30)
SECTION IV-ADDITIONAL WORK REQUIRED: CO#1
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE 1N
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install 12"22.5
degree bends;complete as
1-4230 specified Each 0.00 2.00 2.00 $600.00 $1,200.00
Install hydrant only;complete
1-40000 as specified Each 0.00 2.00 2.00 $1,500.00 $3,000.00
Install 8"gate valve only;
1-40002 complete as specified Each 0.00 1.00 1.00 $500.00 $500.00
Install 6"gate valve only;
1-40003 complete as specified Each 0.00 2.00 2.00 $475.00 $950.00
SECTION IV-(ADDITIONAL.WORK REQUIRED:CO#1-ITEMS 1-4230-1-40003)-SUBTOTAL $5,650.00 $0.00
NET DECREASE TO: SECTION IV ($41,814.30)
NET INCREASE TO SECTIONS I,II,III,&IV $82,126.64
NET DECREASE TO SECTIONS 1,11,III,&IV ($114,146.21)
NET DECREASE TO CONTRACT: ($32,018.57)