HomeMy WebLinkAbout10. 17-395 AUGUST 8, 2017 17-395 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD SID FOR PUBLIC WORKS CONTRACT NO. 17-01 VINTON CONSTRUCTION COMPANY, INC. FOR PARKING LOT CONSTRUCTION ($319,029.48) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for parking lot construction; and WHEREAS,upon the opening and tabulation of bids,it appears that the following is the most advantageous bid: VINTON CONSTRUCTION COMPANY, INC. PO Box 1987 Manitowoc, WI 54221-1987 Total Bid: $319,029.48 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same,all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 323-1717-7216-06702 Property Improvement Fund—Land Improvements CityOf` Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works 14" DATE: August 3, 2017 RE: Award Bid for Public Works Contract No. 17-01 Parking Lot Construction Vinton Construction Company, Inc. / ($319,029.48) BACKGROUND The purpose of this project is to reconstruct an existing parking lot at Fire Station #16 and asphalt mill and overlay the Oshkosh Public Library parking lot. ANALYSIS Engineering staff reviewed two (2) bids. The low bid was received from Vinton Construction Company, Inc. of Manitowoc, Wisconsin. The total bid is $319,029.48. FISCAL IMPACT Funding for the project is in the Property Improvements section of the 2017 Capital Improvements Program (CIP). Of the $600,000 budgeted for parking lot improvements in the 2017 CIP, $291,000 is already being utilized for the South Park Shelter Lot, which was awarded earlier this year. The remaining $49,000 required for this project is available from the Property Improvements section of the 2016 CIP. Following is a summary of the available funds and the construction costs, including engineering fees. CIP Section CIP Funds Budgeted Construction Costs with Engr Property Improvements $358,000 $357,313 Totals $358,000 $357,313 RECOMMENDATIONS I recommend award to the low bidder, Vinton Construction Company, Inc. in the amount of $319,029.48. Approved: Mark A. Rohloff City Manager SMG/t1t L\ Engineering\ 2017CONTRACTS\17-01 FS 16 Prkng Lot\Project_Information\Correspondence\Memo\17-01 Memo for Bid Award_8-3-17.docc Contract 17-01 - Parking Lot Construction (#5243443) Owner: Oshkosh, City of Solicitor: Oshkosh, City of Bid Opening: 08/01/2017 10:00 AM CDT Vinton Construction Company Northeast Asphalt2 PO Box 1987 Manitowoc, WI 54221-1987 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1: Work Unit A $212,983.58 $257,374.90 Removing pavement; A-1100 complete as specified Square Yards 2,210.00 $2.55 $5,635.50 $4.95 $10,939.50 Removing concrete and asphalt sidewalk and driveway; complete as A-1120 specified Square Feet 150.00 $1.00 $150.00 $3.30 $495.00 Heavy biaxial geogrid; A-1231 complete as specified Square Yards 435.00 $1.10 $478.50 $11.00 $4,785.00 Geotextile fabric; complete as A-1232 specified Square Yards 550.00 $4.90 $2,695.00 $2.30 $1,265.00 3/4" clear stone storage A-1341 gallery; complete as specified Tons 335.00 $15.29 $5,122.15 $20.95 $7,018.25 Drilled dowel bars; 1 1/4"; A-1354 complete as specified Each 34.00 $20.00 $680.00 $22.00 $748.00 Adjust manholes and inlets; A-1360 complete as specified Each 3.00 $400.00 $1,200.00 $1,310.00 $3,930.00 12" curb and gutter; 6; with 18" pan section; 8"; complete A-1445 as specified Linear Feet 400.00 $37.30 $14,920.00 $44.00 $17,600.00 4" concrete sidewalk with 3" CABC and grading; complete A-1500 as specified Square Feet 270.00 $6.25 $1,687.50 $8.40 $2,268.00 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete A-1520 as specified Square Feet 2,040.00 $7.60 $15,504.00 $9.50 $19,380.00 Drilled No. 4 sidewalk tie bars - deformed; epoxy - A -1560 coated; complete as specified Each 8.00 $15.00 $120.00 $16.50 $132.00 Sawing existing pavement; A-1700 complete as specified Linear Feet 20.00 $5.00 $100.00 $12.90 $258.00 Tack coat; complete as A-1900 specified Gallons 139.30 $5.56 $774.51 $5.50 $766.15 5" asphaltic pavement with 10" CABC and grading; A-1905 complete as specified Square Yards 1,990.00 $32.01 $63,699.90 $34.25 $68,157.50 Permeable articulating concrete block; complete as A-1979 specified Square Yards 76.00 $142.50 $10,830.00 $285.00 $21,660.00 Furnish and install fence; A-1980 complete as specified Linear Feet 224.00 $50.65 $11,345.60 $55.75 $12,488.00 Furnish and install 8" storm A-2001 sewer; complete as specified Linear Feet 130.00 $41.00 $5,330.00 $35.20 $4,576.00 Furnish and install 12" storm A-2003 sewer; complete as specified Linear Feet 65.00 $58.00 $3,770.00 $50.45 $3,279.25 Furnish and install 18" storm A-2009 sewer; complete as specified Linear Feet 130.00 $69.30 $9,009.00 $57.75 $7,507.50 Furnish and install 6" storm sewer underdrain; complete A-2188 as specified Linear Feet 90.00 $17.20 $1,548.00 $24.20 $2,178.00 Furnish and install standard storm sewer manhole (4' diameter); complete as A-2201 specified Vertical Feet 3.00 $477.00 $1,431.00 $935.00 $2,805.00 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as A-2213 specified Vertical Feet 7.50 $557.00 $4,177.50 $935.00 $7,012.50 Furnish and install 30" diameter storm sewer manhole; complete as A-2233 specified Vertical Feet 2.25 $528.00 $1,188.00 $935.00 $2,103.75 Furnish and install trench drain inlet; complete as A-2240 specified Each 1.00 $18,355.00 $18,355.00 $4,250.00 $4,250.00 Furnish and install storm sewer cleanout; complete as A-2241 specified Each 1.00 $400.00 $400.00 $735.00 $735.00 Furnish; install; maintain; and remove Type D modified inlet protection; complete as A-2508 specified Each 15.00 $70.00 $1,050.00 $255.00 $3,825.00 Sediment removal - Type D modified inlet protection; A-2510 complete as specified Each 10.00 $5.00 $50.00 $255.00 $2,550.00 Furnish; install; maintain; and remove stone tracking pad; A-2512 complete as specified Each 1.00 $1,248.50 $1,248.50 $1,320.00 $1,320.00 Furnish; install; maintain; and remove silt fence; complete as A-2514 specified Linear Feet 620.00 $3.00 $1,860.00 $2.75 $1,705.00 Furnish; install; maintain; and remove stone bag; complete A-2516 as specified Each 15.00 $10.00 $150.00 $30.00 $450.00 Furnish; install; maintain; and remove 12" diameter A-2518 sediment logs; complete as Linear Feet 10.00 $10.00 $100.00 $30.00 $300.00 Furnish and install topsoil 6" A-2600 depth; complete as specified Square Yards 750.00 $5.00 $3,750.00 $7.00 $5,250.00 Furnish and install turf grass; A-2620 complete as specified Square Yards 750.00 $0.50 $375.00 $4.00 $3,000.00 Furnish and install hydraulically -applied erosion control product; complete as A-2644 specified Square Yards 750.00 $2.00 $1,500.00 $1.95 $1,462.50 Furnish and install river rock landscaping stone; complete A-2654 as specified Square Yards 40.00 $11.25 $450.00 $18.75 $750.00 Connect to existing storm sewer main; complete as A-2850 specified Each 1.00 $475.00 $475.00 $1,320.00 $1,320.00 Connect to existing storm sewer inlet; complete as A-2858 specified Each 1.00 $475.00 $475.00 $880.00 $880.00 Storm sewer utility line opening (ULO); complete as A-2914 specified Each 1.00 $500.00 $500.00 $880.00 $880.00 General excavation; complete A-2930 as specified Lump Sum 1.00 $19,348.92 $19,348.92 $23,825.00 $23,825.00 Relocate existing hydrant; A-4501 complete as specified Each 1.00 $1,500.00 $1,500.00 $3,520.00 $3,520.00 Section 2: Work Unit B $106,045.90 $104,397.50 Unclassified excavation; B-1200 complete as specified Cubic Yards 550.00 $15.39 $8,464.50 $11.55 $6,352.50 Sawing existing pavement; B-1700 complete as specified Linear Feet 1,700.00 $1.50 $2,550.00 $1.25 $2,125.00 Base aggregate dense; 1-1/4"; B-1801 complete as specified Tons 925.00 $10.78 $9,971.50 $12.65 $11,701.25 Tack coat; complete as B-1900 specified Gallons 300.00 $5.56 $1,668.00 $5.50 $1,650.00 HMA Pavement LT; complete B-1901 as specified Tons 585.00 $89.64 $52,439.40 $88.75 $51,918.75 HMA cold weather paving; B-1903 complete as specified Tons 50.00 $94.44 $4,722.00 $93.50 $4,675.00 Asphaltic pavement milling; B-1950 complete as specified Square Yards 4,250.00 $3.13 $13,302.50 $3.10 $13,175.00 Prepare foundation for asphaltic paving; complete as B-1960 specified Lump Sum 1.00 $12,928.00 $12,928.00 $12,800.00 $12,800.00 Base Bid Total: $319,029.48 $361,772.40