HomeMy WebLinkAbout10. 17-395 AUGUST 8, 2017 17-395 RESOLUTION
(CARRIED 6-0 LOST LAID OVER WITHDRAWN )
PURPOSE: AWARD SID FOR PUBLIC WORKS CONTRACT NO. 17-01
VINTON CONSTRUCTION COMPANY, INC. FOR PARKING LOT
CONSTRUCTION ($319,029.48)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City of Oshkosh has heretofore advertised for bids for parking lot
construction; and
WHEREAS,upon the opening and tabulation of bids,it appears that the following is
the most advantageous bid:
VINTON CONSTRUCTION COMPANY, INC.
PO Box 1987
Manitowoc, WI 54221-1987
Total Bid: $319,029.48
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same,all
according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No. 323-1717-7216-06702 Property Improvement Fund—Land Improvements
CityOf`
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works 14"
DATE: August 3, 2017
RE: Award Bid for Public Works Contract No. 17-01
Parking Lot Construction
Vinton Construction Company, Inc. / ($319,029.48)
BACKGROUND
The purpose of this project is to reconstruct an existing parking lot at Fire Station #16 and asphalt mill and
overlay the Oshkosh Public Library parking lot.
ANALYSIS
Engineering staff reviewed two (2) bids. The low bid was received from Vinton Construction Company, Inc. of
Manitowoc, Wisconsin. The total bid is $319,029.48.
FISCAL IMPACT
Funding for the project is in the Property Improvements section of the 2017 Capital Improvements Program (CIP).
Of the $600,000 budgeted for parking lot improvements in the 2017 CIP, $291,000 is already being utilized for the
South Park Shelter Lot, which was awarded earlier this year. The remaining $49,000 required for this project is
available from the Property Improvements section of the 2016 CIP. Following is a summary of the available
funds and the construction costs, including engineering fees.
CIP Section CIP Funds Budgeted Construction Costs with Engr
Property Improvements $358,000 $357,313
Totals $358,000 $357,313
RECOMMENDATIONS
I recommend award to the low bidder, Vinton Construction Company, Inc. in the amount of $319,029.48.
Approved:
Mark A. Rohloff
City Manager
SMG/t1t
L\ Engineering\ 2017CONTRACTS\17-01 FS 16 Prkng Lot\Project_Information\Correspondence\Memo\17-01 Memo for Bid Award_8-3-17.docc
Contract 17-01 - Parking Lot Construction (#5243443)
Owner: Oshkosh, City of
Solicitor: Oshkosh, City of
Bid Opening: 08/01/2017 10:00 AM CDT
Vinton Construction Company
Northeast Asphalt2
PO Box 1987
Manitowoc, WI 54221-1987
Section Title
Item Code
Item Description
UofM
Quantity
Unit Price
Extension
Unit Price
Extension
Section 1: Work Unit A
$212,983.58
$257,374.90
Removing pavement;
A-1100
complete as specified
Square Yards
2,210.00
$2.55
$5,635.50
$4.95
$10,939.50
Removing concrete and
asphalt sidewalk and
driveway; complete as
A-1120
specified
Square Feet
150.00
$1.00
$150.00
$3.30
$495.00
Heavy biaxial geogrid;
A-1231
complete as specified
Square Yards
435.00
$1.10
$478.50
$11.00
$4,785.00
Geotextile fabric; complete as
A-1232
specified
Square Yards
550.00
$4.90
$2,695.00
$2.30
$1,265.00
3/4" clear stone storage
A-1341
gallery; complete as specified
Tons
335.00
$15.29
$5,122.15
$20.95
$7,018.25
Drilled dowel bars; 1 1/4";
A-1354
complete as specified
Each
34.00
$20.00
$680.00
$22.00
$748.00
Adjust manholes and inlets;
A-1360
complete as specified
Each
3.00
$400.00
$1,200.00
$1,310.00
$3,930.00
12" curb and gutter; 6; with
18" pan section; 8"; complete
A-1445
as specified
Linear Feet
400.00
$37.30
$14,920.00
$44.00
$17,600.00
4" concrete sidewalk with 3"
CABC and grading; complete
A-1500
as specified
Square Feet
270.00
$6.25
$1,687.50
$8.40
$2,268.00
8" concrete sidewalk/
driveway/ramp with 3"
CABC and grading; complete
A-1520
as specified
Square Feet
2,040.00
$7.60
$15,504.00
$9.50
$19,380.00
Drilled No. 4 sidewalk tie
bars - deformed; epoxy -
A -1560
coated; complete as specified
Each
8.00
$15.00
$120.00
$16.50
$132.00
Sawing existing pavement;
A-1700
complete as specified
Linear Feet
20.00
$5.00
$100.00
$12.90
$258.00
Tack coat; complete as
A-1900
specified
Gallons
139.30
$5.56
$774.51
$5.50
$766.15
5" asphaltic pavement with
10" CABC and grading;
A-1905
complete as specified
Square Yards
1,990.00
$32.01
$63,699.90
$34.25
$68,157.50
Permeable articulating
concrete block; complete as
A-1979
specified
Square Yards
76.00
$142.50
$10,830.00
$285.00
$21,660.00
Furnish and install fence;
A-1980
complete as specified
Linear Feet
224.00
$50.65
$11,345.60
$55.75
$12,488.00
Furnish and install 8" storm
A-2001
sewer; complete as specified
Linear Feet
130.00
$41.00
$5,330.00
$35.20
$4,576.00
Furnish and install 12" storm
A-2003
sewer; complete as specified
Linear Feet
65.00
$58.00
$3,770.00
$50.45
$3,279.25
Furnish and install 18" storm
A-2009
sewer; complete as specified
Linear Feet
130.00
$69.30
$9,009.00
$57.75
$7,507.50
Furnish and install 6" storm
sewer underdrain; complete
A-2188
as specified
Linear Feet
90.00
$17.20
$1,548.00
$24.20
$2,178.00
Furnish and install standard
storm sewer manhole (4'
diameter); complete as
A-2201
specified
Vertical Feet
3.00
$477.00
$1,431.00
$935.00
$2,805.00
Furnish and install standard
storm sewer inlet manhole (4'
diameter); complete as
A-2213
specified
Vertical Feet
7.50
$557.00
$4,177.50
$935.00
$7,012.50
Furnish and install 30"
diameter storm sewer
manhole; complete as
A-2233
specified
Vertical Feet
2.25
$528.00
$1,188.00
$935.00
$2,103.75
Furnish and install trench
drain inlet; complete as
A-2240
specified
Each
1.00
$18,355.00
$18,355.00
$4,250.00
$4,250.00
Furnish and install storm
sewer cleanout; complete as
A-2241
specified
Each
1.00
$400.00
$400.00
$735.00
$735.00
Furnish; install; maintain; and
remove Type D modified
inlet protection; complete as
A-2508
specified
Each
15.00
$70.00
$1,050.00
$255.00
$3,825.00
Sediment removal - Type D
modified inlet protection;
A-2510
complete as specified
Each
10.00
$5.00
$50.00
$255.00
$2,550.00
Furnish; install; maintain; and
remove stone tracking pad;
A-2512
complete as specified
Each
1.00
$1,248.50
$1,248.50
$1,320.00
$1,320.00
Furnish; install; maintain; and
remove silt fence; complete as
A-2514
specified
Linear Feet
620.00
$3.00
$1,860.00
$2.75
$1,705.00
Furnish; install; maintain; and
remove stone bag; complete
A-2516
as specified
Each
15.00
$10.00
$150.00
$30.00
$450.00
Furnish; install; maintain; and
remove 12" diameter
A-2518
sediment logs; complete as
Linear Feet
10.00
$10.00
$100.00
$30.00
$300.00
Furnish and install topsoil 6"
A-2600
depth; complete as specified
Square Yards
750.00
$5.00
$3,750.00
$7.00
$5,250.00
Furnish and install turf grass;
A-2620
complete as specified
Square Yards
750.00
$0.50
$375.00
$4.00
$3,000.00
Furnish and install
hydraulically -applied erosion
control product; complete as
A-2644
specified
Square Yards
750.00
$2.00
$1,500.00
$1.95
$1,462.50
Furnish and install river rock
landscaping stone; complete
A-2654
as specified
Square Yards
40.00
$11.25
$450.00
$18.75
$750.00
Connect to existing storm
sewer main; complete as
A-2850
specified
Each
1.00
$475.00
$475.00
$1,320.00
$1,320.00
Connect to existing storm
sewer inlet; complete as
A-2858
specified
Each
1.00
$475.00
$475.00
$880.00
$880.00
Storm sewer utility line
opening (ULO); complete as
A-2914
specified
Each
1.00
$500.00
$500.00
$880.00
$880.00
General excavation; complete
A-2930
as specified
Lump Sum
1.00
$19,348.92
$19,348.92
$23,825.00
$23,825.00
Relocate existing hydrant;
A-4501
complete as specified
Each
1.00
$1,500.00
$1,500.00
$3,520.00
$3,520.00
Section 2: Work Unit B
$106,045.90
$104,397.50
Unclassified excavation;
B-1200
complete as specified
Cubic Yards
550.00
$15.39
$8,464.50
$11.55
$6,352.50
Sawing existing pavement;
B-1700
complete as specified
Linear Feet
1,700.00
$1.50
$2,550.00
$1.25
$2,125.00
Base aggregate dense; 1-1/4";
B-1801
complete as specified
Tons
925.00
$10.78
$9,971.50
$12.65
$11,701.25
Tack coat; complete as
B-1900
specified
Gallons
300.00
$5.56
$1,668.00
$5.50
$1,650.00
HMA Pavement LT; complete
B-1901
as specified
Tons
585.00
$89.64
$52,439.40
$88.75
$51,918.75
HMA cold weather paving;
B-1903
complete as specified
Tons
50.00
$94.44
$4,722.00
$93.50
$4,675.00
Asphaltic pavement milling;
B-1950
complete as specified
Square Yards
4,250.00
$3.13
$13,302.50
$3.10
$13,175.00
Prepare foundation for
asphaltic paving; complete as
B-1960
specified
Lump Sum
1.00
$12,928.00
$12,928.00
$12,800.00
$12,800.00
Base Bid Total:
$319,029.48
$361,772.40