HomeMy WebLinkAboutContract 15-09 Order No. 1-PTS Contractors 2017 r,A City 0fV Oshkosh March 8, 2017 Mr.Mark Schleis PTS Contractors 4075 Eaton Road Green Bay, WI 54311 Subject: Change Order No. I (Final) Contract 15-09 Dear Mr. Schleis: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and PTS Contractors regarding the abovementioned project. If you have any questions,please call our office at(920)236-5065. Sincerely, Jes Rabe,P.E., CPESC Director of Public Works JER/tIt Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) Darlene Brandt, Grants Coordinator (w/copy) File (w/original) 1:\Engineering\2015 CONTRACrS\15-09 Aviation Bus Prk\Project_Infornuation\Contract Info\Change Orders\15-09 Executed CO#1 Ltr-3-8-17.docx Page 1 of 1 City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1130 http://www.ci.oshkosh.wi.us ` TO: PTS CONTRACTORS, INC. CHANGE ORDER#1 (F|NAL 4O75EATON ROAD DATE: FEBRUARY 1. 2O17 GREEN BAY, VV| 54311 Your present contract with the City of Oshkosh, Contract No. 15-09, awarded November 24, 2015, is hereby amended and changed eefollows: NET INCREASE TO: SECTION | -PAVING $18.454.28 NET INCREASE TO: SECTION || 'STORM SEWER $78.475.81 NET INCREASE TO: SECTION III -SANITARY SEWER $3.928.16 NET INCREASE TO: SECTION |V-WATER MAIN $152.38 NET INCREASE TO: SECTION V- ELECTRICAL $13.606.83 NET INCREASE TO CONTRACT $10$,617.58 SECTION SECTION 11 SECTION III SECTION IV SECTION (PAVING) (STORM) (SANITARY) (WATER) (ELECTRICAL TOTALS B|DTOTAL $63786344 $1,532,523.65 $269,805.44 $361,357.75 $71,295.00 CITY OFOSHKOSH BY: City Manager,, City Clem Approved and Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within Change Order, Comptroller Approv7 jasform-, CONTRACT 15-09 CHANGE ORDER#1(FINAL) SECTION I-PAVING ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 8"concrete pavement doweled;with 6"CABC and grading;complete as Square 1314A specified Yards 11,627.00 11,587.00 .40.00 $36.45 $1,458.00 8"concrete pavement removal and replacement; including sawing;pavement ties;integral curb and grading;excavating;6" CABC;terracing;and traffic Square 1318 control;complete asspecified Yards 367.00 568.44 201.44 $50.25 $10,122.36 Adjust manholes and inlets; 1360 complete asspecified Each 65.00 65.00 $205.00 Four-foot(4')gutter;8";with 6"CABC and grading; Linear 1455 com tete asspecified Feet 94.00 0.00 -94.00 $34.40 $3,233.60 4"concrete sidewalk with 3" CABC and grading;complete Square ! 1500 as specified Feet 15,452.00 15 402.00 -50.00 $3.26 $163.00 6"concrete sidewalk/ j driveway/ramp with 3"CABC and grading;complete as Square 1510 specified Feet 488.00 257.50 -230.50 $4.84 _($1,115.62) Curb ramp detectable warning field(natural/non- painted);complete as Square 1540 specified Feet 28.00 28.001 $28.50 Base aggregate dense;3/4'; 1800 complete asspecified Tons 74.00 85.00 11.00 $19.05 $209.55 ( Tack coat;complete as 1900 specified Gallons 44.00 250.00 206.00 $24.50 $5,047.00 5"asphaltic pavement with 10"CABC and grading; Square 1905 complete asspecified Yards 1,736.001 1,798.00 62.00 $24.55 $1,522.10 4"asphaltic surface with 6" CABC and grading;complete Square 1916 as,specified Yards 3,715.00 3,716.00 1.00 $19.25 $19.25 Prepare foundation for asphaltic paving;complete Lump ! 1960 ass ecified Sum 1.00 1.00 $7,230.00 EDA project sign;complete Lump 1971 asspecified Sum 1.00 1.00 $810.00 E Permanently-mounted Type III barricade;complete as 1973 specified Each 4.00 4.00 $102.00 Type II signs and posts; Square 1975 complete as s2.25 Feet 12.25 14.50 2.25 $21.00 $47.25 I SECTION I-(BID ITEMS 1314A-1975)-SUBTOTAL $16,967.51 ($5,970.22) i SECTION I-ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 30"curb and gutter;8';with 6"CABC and grading; Linear 1-1442 complete asspecified Feet 0.00 45.00 45.00 $42.00 $1 890.00 No.4 reinforcing rods- deformed;expoxy-coated; Linear 1-1550 complete asspecified Feet 0.00 540.00 540.001 $1.05 $567.00 SECTION I-(ADDITIONAL WORK REQUIRED: CO#1 ITEMS 1-1442-1-1550)-SUBTOTAL $2,457.00 $0.00 NET INCREASE TO: SECTION 1 $13,454.29 E { { { Page t of 8 f i CONTRACT 15-09 CHANGE ORDER 41(FINAL) SECTION II-STORM SEWER ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Mobilization;complete as Lump 2000 specified Sum 1.00 1.00 $30,00000 Strip and stockpile topsoil; Square 2002 complete asspecified Yards 350,000.00 350 000.00 $0.20 Clear trees;complete as Lump 2006 specified Sum 1.00 1.00 $47,855.00 Grub stumps;complete as Lump 2012 specified Sum 1.00 1.00 $1323000 General excavation;complete Lump 2020 asspecified Sum 1.00 1.00 $400 150.00 Construct clay liner;complete Lump 2024 asspecified Sum 1.00 1.00 $86,600.00 Excavation below sub-grade, Cubic 2025 complete asspecified Yards 500.00 0.00500.00 $8.45 $4,225.00 Excavation;undercut; Cubic 2027 complete asspecified Yards 250.00 Detention basin overhead 431.90 181.90 $8.45 $1,537.06 grid system;complete as Lump 2029 s ecified Sum 1.00 1.00 $7127500 Furnish and install 15"RCP Class III storm sewer; Linear 2044 corn lete as specified Feet 206.00 213.00 7.00 $33.25 $232.75 Furnish and install 18"RCP Class III storm sewer; Linear 2050 complete ass ecified Feet 885.00 867.00 -18.00 $36.60 $658.80 Furnish and install 24"RCP Class III storm sewer; Linear 2062 complete ass ecified Feet 750.00 819.00 69.00 $46.00 $3,174.00 Furnish and install 27"RCP Class III storm sewer; Linear 2068 complete asspecified Feet 32.00 32.00 $51.00 Furnish and install 30"RCP Class III storm sewer; Linear 2074 complete ass ecified Feet 2,140.00 2,045.00 -95.00 $52.20 $4 959.00 Furnish and install 36"RCP Class III storm sewer; Linear 2080corn tete asspecified Feet 142.00 142.00 $68.15 Furnish and install 14"x 23" HERCP Class III storm Linear 2120 sewer;complete asspecified Feet 95.00 95.00 $48.50 Furnish and install 29"x 45" HERCP Class III storm Linear 2132 sewer;complete asspecified Feet 377.00 377.00 $8P.95 Furnish and install 34"x 53" HERCP Class III storm Linear 2136 sewer;complete ass ecified Feet 881.00 878.00 -3.00 $89.90 $269.70 Furnish and install 38"x 60" HERCP Class III storm Linear 2140 sewer;complete asspecified Feet 727.00 727.00 $102.70 Furnish and install storm sewer marker balls;complete 2284 ass ecifiedEach 10.00 10.00 $43.00 Furnish and install 15"RCP Class III apron endwail with joint ties;complete as 2302 specified Each 2.00 2.00 $583.00 Furnish and install 14"x 23" RCP Class III apron endwail with joint ties;complete as 2328 specified Each 2.00 2.00 $721.00 Furnish and install-34' x 53" RCP Class III apron endwall with joint ties;complete as i 2336_,specified Each 1.00 1.00 $1,775.00 i Page 2 of 8 CONTRACT 15-09 CHANGE ORDER#1(FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install 38"x 607-- RCP 0" RCP Class III apron endwall with joint ties;complete as 2338 specified Each 1.00 1.00 $2,170.00 Furnish and install standard storm sewer manhole(4' diameter);complete as Vertical 2532 specified Feet 12.00 13.71 1.71 $494.00 $844.74 Fumish and install standard storm sewer manhole(5' diameter);complete as Vertical 2534 specified Feet 16.00 17.69 1.69 $536.00 Furnish and install standard $905.84 storm sewer manhole(6' diameter);complete as Vertical 2536 specified Feet 6.00 6.23 0.23 $585.00 $134.55 Furnish and install standard storm sewer manhole(7' diameter);complete as Vertical 2538 specified Feet 5.00 5.93 0.93 $976.00 $907.68 Furnish and install standard storm sewer manhole(4'x 4' Vertical 2544 box'l;,complete ass ecified Feet 19.00 20.86 1.86 $677,00 $1,259.22 Fumish and install standard storm sewer manhole(6'x 6' Vertical 2548 box;com fete as s ecified Feet 31.00 34.58 3.58 $935.00 $3,347.30 Fumish and install standard storm sewer manhole(7'x 7' Vertical 2550 box com tete as ecified Feet 24.00 26.13 2.13 $1,095.00 $2,332.35 Fumish and install standard storm sewer inlet manhole(6' diameter);complete as Vertical 2560 specified Feet 6.00 6.310.31 $585.00 $181.35 Fumish and install standard storm sewer Inlet manhole (4'x 4'box);complete as Vertical t 2568 specified Feet 23.00 22.62 Fumish and install storm -0.38 $777.00 $295.26 sewer outlet structure; ' 2582 complete asspecified Each 1.00 1.00 Furnish and install Type 3 $3,175.00 inlet(with 18"sump); 2614 complete asspecified Each 20.00 20.00 $1,600.00 Inlet Median 3;complete as 2619 specified Each 1.00 1.00 $2 100.00 Connect to existing storm sewer main,complete as 2800 s ecifiedEach 1.00 1.00 $831.00 Connect to existing storm sewer manhole;complete 2806 as specifiedEach 2.00 2.00 $880.00 Abandon 8"-12"storm Linear 2820 sewer,complete ass ecified Feet 27.00 27.00 $20.00 Remove 30-and smaller storm sewer;complete as Linear 2824 specified Feet 12.00 12.00 $35.00 Remove storm sewer manholes and inlets; 2832 com fete ass ecified Each 2.00 2.00 $400.00 Furnish,install,maintain,and remove Type D modified inlet protection,complete as 2858 s ecified Each 30.00 30.00 $77.50 Sediment removal-Type D modified inlet protection, 2860 complete ass ecified Each 30.00 0.00 30.00 $65.00 $1,950.00 i I Page 3 of 8 B'I CONTRACT 15-09 CHANGE ORDER 41(FINAL) ITEM DESCRIPTIONCONTRACT INSTALLED NET NET NUMBER UNIT UNIT INCREASE IN DECREASE IN QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish,install,maintain,and remove stone tracking pad, 2862 complete asspecified Each 1.00 1.00 $765.00 Furnish;install;maintain;and remove silt fence;complete Linear 2864 asspecified Feet 10,000.00 10,604.00 604.00 rnis $1.45 $875.80 Fuh;install; ,and remove ditch check;complete 2872 asspecified Each 4.00 3.00 -1.00 $72.00 $72.00 Furnish;install;maintain;and remove dewatering tank system;complete as 2874 specified Each 1.00 0.00 -1.00 $1.00 $1.00 Install salvaged topsoil 6" Square 2902 de th;complete ass ecified Yards 318,450.00 312 580.00 -5,870.00 $0.25 $1,467.50 Install salvaged topsoil 12" Square 2906 depth;complete asspecified Yards 1,550.00 1,550-00 Furnish and install wetland Square 2908 Plugs;complete asspecified Yards 2,120.00 2,120.00 Furnish and install native seeding;complete as Square 2910 s ecified Yards 19,500.00 27 417.00 7,917.00 $0.87 $6,887.79 Furnish and install native seeding;complete as Square 2912 specified Yards 17,000.00 11 430.00 -5 570.00 $0.78 $4,344.60 Furnish and install turf grass; Square 2920 com fete as s ecified Yards 23,500.00 24,647.00_1.147.00 $0.18 $206.46 Furnish and install annual cover crop;complete as Square 2924 specified Yards 302,000.00 312,580.00 10,580.00 $0.11shandinstaiitrees;Fumi $1163,80 2926 complete asspecified Each 43.00 43.00 $377.00 Furnish and install shrubs; 2928 complete asspecified Each 99.00 99.00 $51.00 Furnish and install Class I; Urban;Type A erosion control mat;complete as specified Square 2932 Yards 531000.00 60 898.00 7898.00 $1.02 $8 055.96 Furnish and install turt reinforcement mat system; Square 2938 com tete ass ecified Yards 250.00 323.00 73.00 $579.62 Furnish and install heavy rip- rap with filter fabric;complete Square 2948 I asspecified I Yards 1 126.00 126.00 $43.00 SECTION II-(BID ITEMS 2000-2948)-SUBTOTAL $32,626.27 ($18,242.86) i SECTION 11-ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT NUMBER INCREASE IN DECREASE IN QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 24'x 38' HERCP Class III storm Linear 4 1-2049sewer;complete asspecified Feet 0.00 102.00 102.00 $89.40 $9,118.80 Additional clearing in wetland Lump 1-20000 area;complete asspecified Sum 0.00 1.00 1.00 $11,400.00 $11,400.00 Endwali grate for 34"x 53" storm AEW;complete as 1-20001 s ecified Each 0.00 1.00 1.00 $1,821.00 $1 821.00 Endwali grate for 38"x 60" storm AEW;complete as 1-20002 s ecified Each 0.00 1.001.00 $1,855.00 $185500 Move trench spoils from KS Energy;complete as Lump 1-20003 specified I Sum 0.00 1.00 1.00 $5,678.551 $5,678.55 i Page 4 of 8 CONTRACT 15-09 CHANGE ORDER#1(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Mow wooded wetland area and clearing adjacent to airport fence;complete as Lump 1-20004 specified Sum 0.00 1.00 1.00 $22,837.50 $22,837.50 Removal of topsoil containing large amounts of debris; Lump 1-20005 complete ass specified Sum 0.00 1.00 1.00 $8,703.00 $8,703.00 Install saddle inlet west of RI- Lump 1-20006 3;com lete ass eciffed Sum 0.00 1.00 1.00 $1,572.58 $1,572.58 Adjust inlet castings associated with new inlet west of RI-3;complete as Lump 1-20007 1 specified Sum 0.00 1.00 1.00 $405.68 $405.68 T&M cut hole in structure; Lump 1-20008 1 complete asspecified Sum 0.00 1.00 1.00 $700.291 $700.29 SECTION II-(ADDITIONAL WORK REQUIRED: CO#1-(ITEMS 1-2049-1-20008)-SUBTOTAL $64,092.40 $0.00 NET INCREASE TO: SECTION II $78,475.81 SECTION III-SANITARY SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 8"sanitary sewer(new);complete as Linear 3030s ecified Feet 206.00 220.00 14.00 $62.50 $875.00 Correction of error in bid tab 3030A rice for item 3030 Furnish and install 10" $0.43 sanitary sewer(new); Linear 3032 complete asspecified Feet 3,043.00 3,060.00 17.00 $70.00 $1,190.00 Furnish and install standard sanitary sewer manhole(4' diameter),complete as Vertical 3100 specified - - Feet 154.00 162.60 8.60 $210.00 $1,806.00 _ Furnish and instalnal sanitary sewer manhole chimney seal,complete as 3114 specified Each 11.00 11.00 $351.40 Furnish and install 10"x 6" sanitary sewer factory wyes 3212 or tees;complete asspecified Each 1.00 1.00 $123.00 Furnish and install 6"sanitary sewer laterals(new); Linear 3232 complete asspecified Feet 50.00 50.00 $53.60 Furnish and install sanitary sewer lateral marker balls, 3236 complete ass eciffed Each 4.00 5.00 1.00 $40.00 $40.00 Core into existing manhole, 3332 complete ass eciffed Each 2.00 2.00 $442.00 Rock excavation;complete Cubic 3600 asspecified Yards 300.00 0.00 -300.00 $0.01 $3.00 Closed circuit televising; Linear 3700 lcomplete asspecified I Feet 1 3,043.00 3060.00 1 17.00 $1.27 $21.59 SECTION III-(BID ITEMS 3030-3700)-SUBTOTAL $3,932.59 ($3.43) NET INCREASE TO: SECTION III $3,929.16 C I Page 5 of 8 CONTRACT 15.09 CHANGE ORDER 01(FINAL) SECTION IV-WATER MAIN ITEM DESCRIPTIONUNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install new 6" ductile iron water main with polywrap;complete as Linear 4020 specified Feet 133.00 128.00 -5.00 $46.40 $232.00 Furnish and install new 10" ductile iron water main with polywrap;complete as Linear 4024 specified Feet 313.00 338.00 25.00 $55.85 $1,396.25 Furnish and install new 12" ductile iron water main with polywrap;complete as Linear 4026 specified Feet 25.00 0.00 -25.00 $115.00 $2,875.00 Furnish and install new 16" ductile iron water main with polywrap;complete as Linear 4028 specified Feet 2,874.00 2,851.00 -23.00 $71.85 ($1,652.55) Furnish and install connections to existing 12" water main;complete as 4064 specified Each 3.00 1.00 -2.00 $1,945.00 $3,890.00 Furnish and install 10"x 8" water main tee;complete as 4120 1 specified Each 1.00 1.00 $691.00 Fumish and Install 16"x 6" water main tee;complete as 4137 specified Each 9.00 9.00 $1,436.00 Furnish and install-16"x 10" water main tee;complete as 4139 specified Each 1.00 1.00 $1,690.00 Furnish and install 16"x 16" water main tee;complete as 4141s ecifiedEach 2.00 2.00 $2,260.00 Fumish and install 16"11-114 degree water main bend; 4222 complete asspecified Each 6.00 3.00 -3.00 $1,178.00 $3,534.00 Furnish and install 16"22-172- degree water main bend; 4231 complete asspecified Each 1.00 1.00 $1,180.00 Furnish and install 10"45 degree water main bend; 4238 complete ass ecified Each 1.00 2.00 1.00 $408.00 $408.00 Furnish and install 12"45 degree water main bend; 4239 complete asspecified Each 1.00 0.00 -1.00 $601.00 $601.00 Furnish and install 6"90 degree water main bend; 4245 complete asspecified Each 1.00 1.00 $235.00 Furnish and Install 6"water main cap;complete as 4254 specified Each 1.00 0.00 -1.00 $115.60 $115.60 Furnish and Install 16"water main cap;complete as 4258 specified Each 2.00 0.00 -2.00 $623.00 $1,246.00 Furnish and install 10"x 6" water main reducer;complete 4266 asspecified Each 2.00 1.00 -1.00 $301.00 $301.00 Furnish and install 12"x 10" water main reducer;complete 4271 ass ecified Each 1.00 1.00 $457.00 Furnish and install 16"x 12" water main reducer;complete 4276 asspecified Each 2.00 1.00 -1.00 $868.00 $868.00 Furnish and install 8"water main plug;complete as 4309 specified Each 1.00 1.00 $144.00 Page 6 of 8 CONTRACT 16-09 CHANGE ORDER 91(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 16"water main plug;complete as 4312 specified Each 2.00 2.00 $618.00 Furnish and install 6"water main gate valve;complete as 4401 specified Each 11.00 11.00 $989.00 Furnish and install 10"water main gate valve;complete as 4403 s ecified Each 1.00 1.00 $1,900.00 Furnish and install 12"water main gate valve;complete as 4404 specified Each 3.00 1.00 -2.00 $2,302.00 $4,604.00 Furnish and install 16"water main gate valve;complete as 4405 specified Each 5.00 5.00 $7,172.00 Furnish and install hydrant; 4500 complete ass ecified Each 9.00 9.00 $3,204,00 Relocate existing hydrant; 4501 complete asspecified I Each I I An 1.00 $864.00 Six-inch(6");90 degree hydrant ell;complete as 4503 specified Each 8.00 8.00 $300.00 SECTION IV-(BID ITEMS 4020-4503)-SUBTOTAL $1,804.25 ($19,919.15) SECTION IV-ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 6"45 degree water main bend; 1-4236 complete asspecified Each 0.00 5.00 5.00 $300.00 $1,500.00 Cost to live tap;complete as 1-40000 specified Each 0.00 1.00 1.00 $9,361.20 $9,361.20 Raise hydrant H-1 and Lump 1440001 valves;complete asspecified Sum 0.00 1.00 1.00 $1,610.34 $1,610.34 Hydrant extensions;complete Lump 1-40002 asspecified Sum 0.00 1.00 1.00 $2,878.25 $287825 Cut-in bill from City;complete Lump 1-40003 asspecified I Sum 1 0.00 1.00 1 1.00 $2,917.50 $2,917.50 SECTION IV-(ADDITIONAL WORK REQUIRED: CO#1 ITEMS 1.4236-1-40003)-SUBTOTAL $18,257.29 $0.00 NET INCREASE TO: SECTION IV $152.39 SECTION V-ELECTRICAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Fumish and install pull box (steel);18"x 30';complete as 5010 specified Each 10.00 10.00 $560.00 Furnish and install pull box (steel);24"x 36';complete as 5016 specified Each 1.00 2.00 1.00 $611.00 $611.00 Furnish and install lighting control cabinet;complete as 5050 specified Each 1.00 1.00 $5,906.00 Furnish and install 2" Schedule 40 PVC;complete Linear 5120 asspecified Feet 2,800.00 2,829.00 29.00 $5.09 $147.61 Furnish and install 3" Schedule 40 PVC;complete Linear 5130 asspecified Feet 40.00 40.00 $61.10 Furnish and install 12 gauge red-coated wire;complete as Linear 5270 specified Feet 1 6,000.00 1 1,200.00 -4,800.00 $0.51 $2,448.00 Page 7 of 8 CONTRACT 16-09 CHANGE ORDER#1(FINAL) E ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE i Furnish and install 12 gauge black-coated wire;complete Linear 5271 asspecified Feet 6,000.00 0.00 -6,000.00 $0.51 $3,060.00 Furnish and install 12 gauge green-coated wire;complete Linear 5272 asspecified Feet 6,000.00 0.00 -6,000.00 $0.51 $3,060.00 LED light pole assembly; 5405 complete asspecified Each 10.00 10.00 $2,597.00 Furnish and install Type 5 5504 base;complete asspecified Each 10.00 10.00 $611.00 Concrete control cabinet 5509 base;complete asspecified Each 1.00 1.00 $1,222.00 i SECTION V-(BID ITEMS 5010-5609)-SUBTOTAL $758.61 ($8,568.00) SECTION V-ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 6 gauge red-coated wire;complete as Linear 1-5240 s ecified Foot 0.00 5,407.00 5,407.00 $1.58 $8,543.06 Furnish and install 6 gauge black-coated wire;complete Linear 1-5241 as s ecified Foot 0.00 5,407.00 5,407.00 $1.58 $8,543.06 Furnish and install 6 gauge green-coated wire;complete Linear 1-5242 ass specified Foot 0.00 2,740.00 2,740.00 $1.58 $4,329.20 SECTION V-(ADDITIONAL WORK REQUIRED: CO#1 ITEMS 1-5240-1-5242)-SUBTOTAL $21,415.32 $0.00 NET INCREASE TO: SECTION V $13,606.93 NET INCREASE TO SECTIONS I,II,III,IV&V $162,321.24 NET DECREASE TO SECTIONS I,II,III,IV&V ($62,703.66) NET INCREASE TO CONTRACT: $109,617.58 Page 8 of 8