HomeMy WebLinkAboutContract 15-09 Order No. 1-PTS Contractors 2017 r,A
City
0fV
Oshkosh
March 8, 2017
Mr.Mark Schleis
PTS Contractors
4075 Eaton Road
Green Bay, WI 54311
Subject: Change Order No. I (Final)
Contract 15-09
Dear Mr. Schleis:
Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and PTS
Contractors regarding the abovementioned project.
If you have any questions,please call our office at(920)236-5065.
Sincerely,
Jes Rabe,P.E., CPESC
Director of Public Works
JER/tIt
Enclosure: Change Order No. 1 (Final)
cc: Pam Ubrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director (w/copy)
Darlene Brandt, Grants Coordinator (w/copy)
File (w/original)
1:\Engineering\2015 CONTRACrS\15-09 Aviation Bus Prk\Project_Infornuation\Contract Info\Change
Orders\15-09 Executed CO#1 Ltr-3-8-17.docx Page 1 of 1
City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1130 http://www.ci.oshkosh.wi.us
`
TO: PTS CONTRACTORS, INC. CHANGE ORDER#1 (F|NAL
4O75EATON ROAD DATE: FEBRUARY 1. 2O17
GREEN BAY, VV| 54311
Your present contract with the City of Oshkosh, Contract No. 15-09, awarded November 24, 2015, is hereby
amended and changed eefollows:
NET INCREASE TO: SECTION | -PAVING $18.454.28
NET INCREASE TO: SECTION || 'STORM SEWER $78.475.81
NET INCREASE TO: SECTION III -SANITARY SEWER $3.928.16
NET INCREASE TO: SECTION |V-WATER MAIN $152.38
NET INCREASE TO: SECTION V- ELECTRICAL $13.606.83
NET INCREASE TO CONTRACT $10$,617.58
SECTION SECTION 11 SECTION III SECTION IV SECTION
(PAVING) (STORM) (SANITARY) (WATER) (ELECTRICAL TOTALS
B|DTOTAL $63786344 $1,532,523.65 $269,805.44 $361,357.75 $71,295.00
CITY OFOSHKOSH
BY:
City Manager,,
City Clem
Approved and
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,
under the within Change Order,
Comptroller
Approv7 jasform-,
CONTRACT 15-09 CHANGE ORDER#1(FINAL)
SECTION I-PAVING
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
8"concrete pavement
doweled;with 6"CABC and
grading;complete as Square
1314A specified Yards 11,627.00 11,587.00 .40.00 $36.45 $1,458.00
8"concrete pavement
removal and replacement;
including sawing;pavement
ties;integral curb and
grading;excavating;6"
CABC;terracing;and traffic Square
1318 control;complete asspecified Yards 367.00 568.44 201.44 $50.25 $10,122.36
Adjust manholes and inlets;
1360 complete asspecified Each 65.00 65.00 $205.00
Four-foot(4')gutter;8";with
6"CABC and grading; Linear
1455 com tete asspecified Feet 94.00 0.00 -94.00 $34.40 $3,233.60
4"concrete sidewalk with 3"
CABC and grading;complete Square
! 1500 as specified Feet 15,452.00 15 402.00 -50.00 $3.26 $163.00
6"concrete sidewalk/
j driveway/ramp with 3"CABC
and grading;complete as Square
1510 specified Feet 488.00 257.50 -230.50 $4.84 _($1,115.62)
Curb ramp detectable
warning field(natural/non-
painted);complete as Square
1540 specified Feet 28.00 28.001 $28.50
Base aggregate dense;3/4';
1800 complete asspecified Tons 74.00 85.00 11.00 $19.05 $209.55
( Tack coat;complete as
1900 specified Gallons 44.00 250.00 206.00 $24.50 $5,047.00
5"asphaltic pavement with
10"CABC and grading; Square
1905 complete asspecified Yards 1,736.001 1,798.00 62.00 $24.55 $1,522.10
4"asphaltic surface with 6"
CABC and grading;complete Square
1916 as,specified Yards 3,715.00 3,716.00 1.00 $19.25 $19.25
Prepare foundation for
asphaltic paving;complete Lump
! 1960 ass ecified Sum 1.00 1.00 $7,230.00
EDA project sign;complete Lump
1971 asspecified Sum 1.00 1.00 $810.00
E Permanently-mounted Type
III barricade;complete as
1973 specified Each 4.00 4.00 $102.00
Type II signs and posts; Square
1975 complete as s2.25 Feet 12.25 14.50 2.25 $21.00 $47.25
I
SECTION I-(BID ITEMS 1314A-1975)-SUBTOTAL $16,967.51 ($5,970.22)
i
SECTION I-ADDITIONAL WORK REQUIRED: CO#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
30"curb and gutter;8';with
6"CABC and grading; Linear
1-1442 complete asspecified Feet 0.00 45.00 45.00 $42.00 $1 890.00
No.4 reinforcing rods-
deformed;expoxy-coated; Linear
1-1550 complete asspecified Feet 0.00 540.00 540.001 $1.05 $567.00
SECTION I-(ADDITIONAL WORK REQUIRED: CO#1 ITEMS 1-1442-1-1550)-SUBTOTAL $2,457.00 $0.00
NET INCREASE TO: SECTION 1 $13,454.29
E
{
{
{
Page t of 8
f
i
CONTRACT 15-09 CHANGE ORDER 41(FINAL)
SECTION II-STORM SEWER
ITEM
NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
Mobilization;complete as Lump
2000 specified Sum 1.00 1.00 $30,00000
Strip and stockpile topsoil; Square
2002 complete asspecified Yards 350,000.00 350 000.00 $0.20
Clear trees;complete as Lump
2006 specified Sum 1.00 1.00 $47,855.00
Grub stumps;complete as Lump
2012 specified Sum 1.00 1.00 $1323000
General excavation;complete Lump
2020 asspecified Sum 1.00 1.00 $400 150.00
Construct clay liner;complete Lump
2024 asspecified Sum 1.00 1.00 $86,600.00
Excavation below sub-grade, Cubic
2025 complete asspecified Yards 500.00 0.00500.00 $8.45 $4,225.00
Excavation;undercut; Cubic
2027 complete asspecified Yards 250.00
Detention basin overhead 431.90 181.90 $8.45 $1,537.06
grid system;complete as Lump
2029 s ecified Sum 1.00 1.00 $7127500
Furnish and install 15"RCP
Class III storm sewer; Linear
2044 corn lete as specified Feet 206.00 213.00 7.00 $33.25 $232.75
Furnish and install 18"RCP
Class III storm sewer; Linear
2050 complete ass ecified Feet 885.00 867.00 -18.00 $36.60 $658.80
Furnish and install 24"RCP
Class III storm sewer; Linear
2062 complete ass ecified Feet 750.00 819.00 69.00 $46.00 $3,174.00
Furnish and install 27"RCP
Class III storm sewer; Linear
2068 complete asspecified Feet 32.00 32.00 $51.00
Furnish and install 30"RCP
Class III storm sewer; Linear
2074 complete ass ecified Feet 2,140.00 2,045.00 -95.00 $52.20 $4 959.00
Furnish and install 36"RCP
Class III storm sewer; Linear
2080corn tete asspecified Feet 142.00 142.00 $68.15
Furnish and install 14"x 23"
HERCP Class III storm Linear
2120 sewer;complete asspecified Feet 95.00 95.00 $48.50
Furnish and install 29"x 45"
HERCP Class III storm Linear
2132 sewer;complete asspecified Feet 377.00 377.00 $8P.95
Furnish and install 34"x 53"
HERCP Class III storm Linear
2136 sewer;complete ass ecified Feet 881.00 878.00 -3.00 $89.90 $269.70
Furnish and install 38"x 60"
HERCP Class III storm Linear
2140 sewer;complete asspecified Feet 727.00 727.00 $102.70
Furnish and install storm
sewer marker balls;complete
2284 ass ecifiedEach 10.00 10.00 $43.00
Furnish and install 15"RCP
Class III apron endwail with
joint ties;complete as
2302 specified Each 2.00 2.00 $583.00
Furnish and install 14"x 23"
RCP Class III apron endwail
with joint ties;complete as
2328 specified Each 2.00 2.00 $721.00
Furnish and install-34' x 53"
RCP Class III apron endwall
with joint ties;complete as
i
2336_,specified Each 1.00 1.00 $1,775.00
i
Page 2 of 8
CONTRACT 15-09 CHANGE ORDER#1(FINAL)
ITEM
NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
Furnish and install 38"x 607--
RCP
0"
RCP Class III apron endwall
with joint ties;complete as
2338 specified Each 1.00 1.00 $2,170.00
Furnish and install standard
storm sewer manhole(4'
diameter);complete as Vertical
2532 specified Feet 12.00 13.71 1.71 $494.00 $844.74
Fumish and install standard
storm sewer manhole(5'
diameter);complete as Vertical
2534 specified Feet 16.00 17.69 1.69 $536.00
Furnish and install standard $905.84
storm sewer manhole(6'
diameter);complete as Vertical
2536 specified Feet 6.00 6.23 0.23 $585.00 $134.55
Furnish and install standard
storm sewer manhole(7'
diameter);complete as Vertical
2538 specified Feet 5.00 5.93 0.93 $976.00 $907.68
Furnish and install standard
storm sewer manhole(4'x 4' Vertical
2544 box'l;,complete ass ecified Feet 19.00 20.86 1.86 $677,00 $1,259.22
Fumish and install standard
storm sewer manhole(6'x 6' Vertical
2548 box;com fete as s ecified Feet 31.00 34.58 3.58 $935.00 $3,347.30
Fumish and install standard
storm sewer manhole(7'x 7' Vertical
2550 box com tete as ecified Feet 24.00 26.13 2.13 $1,095.00 $2,332.35
Fumish and install standard
storm sewer inlet manhole(6'
diameter);complete as Vertical
2560 specified Feet 6.00 6.310.31 $585.00 $181.35
Fumish and install standard
storm sewer Inlet manhole
(4'x 4'box);complete as Vertical
t 2568 specified Feet 23.00 22.62
Fumish and install storm -0.38 $777.00 $295.26
sewer outlet structure;
' 2582 complete asspecified Each 1.00 1.00
Furnish and install Type 3 $3,175.00
inlet(with 18"sump);
2614 complete asspecified Each 20.00 20.00 $1,600.00
Inlet Median 3;complete as
2619 specified Each 1.00 1.00 $2 100.00
Connect to existing storm
sewer main,complete as
2800 s ecifiedEach 1.00 1.00 $831.00
Connect to existing storm
sewer manhole;complete
2806 as specifiedEach 2.00 2.00 $880.00
Abandon 8"-12"storm Linear
2820 sewer,complete ass ecified Feet 27.00 27.00 $20.00
Remove 30-and smaller
storm sewer;complete as Linear
2824 specified Feet 12.00 12.00 $35.00
Remove storm sewer
manholes and inlets;
2832 com fete ass ecified Each 2.00 2.00 $400.00
Furnish,install,maintain,and
remove Type D modified inlet
protection,complete as
2858 s ecified Each 30.00 30.00 $77.50
Sediment removal-Type D
modified inlet protection,
2860 complete ass ecified Each 30.00 0.00 30.00 $65.00
$1,950.00
i
I
Page 3 of 8
B'I
CONTRACT 15-09 CHANGE ORDER 41(FINAL)
ITEM DESCRIPTIONCONTRACT INSTALLED NET NET
NUMBER UNIT UNIT INCREASE IN DECREASE IN
QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish,install,maintain,and
remove stone tracking pad,
2862 complete asspecified Each 1.00 1.00 $765.00
Furnish;install;maintain;and
remove silt fence;complete Linear
2864 asspecified Feet 10,000.00 10,604.00 604.00 rnis $1.45 $875.80
Fuh;install; ,and
remove ditch check;complete
2872 asspecified Each 4.00 3.00 -1.00 $72.00 $72.00
Furnish;install;maintain;and
remove dewatering tank
system;complete as
2874 specified Each 1.00 0.00 -1.00 $1.00 $1.00
Install salvaged topsoil 6" Square
2902 de th;complete ass ecified Yards 318,450.00 312 580.00 -5,870.00 $0.25 $1,467.50
Install salvaged topsoil 12" Square
2906 depth;complete asspecified Yards 1,550.00 1,550-00
Furnish and install wetland Square
2908 Plugs;complete asspecified Yards 2,120.00 2,120.00
Furnish and install native
seeding;complete as Square
2910 s ecified Yards 19,500.00 27 417.00 7,917.00 $0.87 $6,887.79
Furnish and install native
seeding;complete as Square
2912 specified Yards 17,000.00 11 430.00 -5 570.00 $0.78 $4,344.60
Furnish and install turf grass; Square
2920 com fete as s ecified Yards 23,500.00 24,647.00_1.147.00 $0.18 $206.46
Furnish and install annual
cover crop;complete as Square
2924 specified Yards 302,000.00 312,580.00 10,580.00 $0.11shandinstaiitrees;Fumi $1163,80
2926 complete asspecified Each 43.00 43.00 $377.00
Furnish and install shrubs;
2928 complete asspecified Each 99.00 99.00 $51.00
Furnish and install Class I;
Urban;Type A erosion control
mat;complete as specified Square
2932 Yards 531000.00 60 898.00 7898.00 $1.02 $8 055.96
Furnish and install turt
reinforcement mat system; Square
2938 com tete ass ecified Yards 250.00 323.00 73.00 $579.62
Furnish and install heavy rip-
rap with filter fabric;complete Square
2948 I asspecified I Yards 1 126.00 126.00 $43.00
SECTION II-(BID ITEMS 2000-2948)-SUBTOTAL $32,626.27 ($18,242.86)
i
SECTION 11-ADDITIONAL WORK REQUIRED: CO#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT
NUMBER INCREASE IN DECREASE IN
QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install 24'x 38'
HERCP Class III storm Linear
4 1-2049sewer;complete asspecified Feet 0.00 102.00 102.00 $89.40 $9,118.80
Additional clearing in wetland Lump
1-20000 area;complete asspecified Sum 0.00 1.00 1.00 $11,400.00 $11,400.00
Endwali grate for 34"x 53"
storm AEW;complete as
1-20001 s ecified Each 0.00 1.00 1.00 $1,821.00 $1 821.00
Endwali grate for 38"x 60"
storm AEW;complete as
1-20002 s ecified Each 0.00 1.001.00 $1,855.00 $185500
Move trench spoils from KS
Energy;complete as Lump
1-20003 specified I Sum 0.00 1.00 1.00 $5,678.551 $5,678.55
i
Page 4 of 8
CONTRACT 15-09 CHANGE ORDER#1(FINAL)
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Mow wooded wetland area
and clearing adjacent to
airport fence;complete as Lump
1-20004 specified Sum 0.00 1.00 1.00 $22,837.50 $22,837.50
Removal of topsoil containing
large amounts of debris; Lump
1-20005 complete ass specified Sum 0.00 1.00 1.00 $8,703.00 $8,703.00
Install saddle inlet west of RI- Lump
1-20006 3;com lete ass eciffed Sum 0.00 1.00 1.00 $1,572.58 $1,572.58
Adjust inlet castings
associated with new inlet
west of RI-3;complete as Lump
1-20007 1 specified Sum 0.00 1.00 1.00 $405.68 $405.68
T&M cut hole in structure; Lump
1-20008 1 complete asspecified Sum 0.00 1.00 1.00 $700.291 $700.29
SECTION II-(ADDITIONAL WORK REQUIRED: CO#1-(ITEMS 1-2049-1-20008)-SUBTOTAL $64,092.40 $0.00
NET INCREASE TO: SECTION II $78,475.81
SECTION III-SANITARY SEWER
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install 8"sanitary
sewer(new);complete as Linear
3030s ecified Feet 206.00 220.00 14.00 $62.50 $875.00
Correction of error in bid tab
3030A rice for item 3030
Furnish and install 10" $0.43
sanitary sewer(new); Linear
3032 complete asspecified Feet 3,043.00 3,060.00 17.00 $70.00 $1,190.00
Furnish and install standard
sanitary sewer manhole(4'
diameter),complete as Vertical
3100 specified - - Feet 154.00 162.60 8.60 $210.00 $1,806.00 _
Furnish and instalnal
sanitary sewer manhole
chimney seal,complete as
3114 specified Each 11.00 11.00 $351.40
Furnish and install 10"x 6"
sanitary sewer factory wyes
3212 or tees;complete asspecified Each 1.00 1.00 $123.00
Furnish and install 6"sanitary
sewer laterals(new); Linear
3232 complete asspecified Feet 50.00 50.00 $53.60
Furnish and install sanitary
sewer lateral marker balls,
3236 complete ass eciffed Each 4.00 5.00 1.00 $40.00 $40.00
Core into existing manhole,
3332 complete ass eciffed Each 2.00 2.00 $442.00
Rock excavation;complete Cubic
3600 asspecified Yards 300.00 0.00 -300.00 $0.01 $3.00
Closed circuit televising; Linear
3700 lcomplete asspecified I Feet 1 3,043.00
3060.00 1 17.00 $1.27 $21.59
SECTION III-(BID ITEMS 3030-3700)-SUBTOTAL $3,932.59 ($3.43)
NET INCREASE TO: SECTION III $3,929.16
C
I
Page 5 of 8
CONTRACT 15.09 CHANGE ORDER 01(FINAL)
SECTION IV-WATER MAIN
ITEM DESCRIPTIONUNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install new 6"
ductile iron water main with
polywrap;complete as Linear
4020 specified Feet 133.00 128.00 -5.00 $46.40 $232.00
Furnish and install new 10"
ductile iron water main with
polywrap;complete as Linear
4024 specified Feet 313.00 338.00 25.00 $55.85 $1,396.25
Furnish and install new 12"
ductile iron water main with
polywrap;complete as Linear
4026 specified Feet 25.00 0.00 -25.00 $115.00 $2,875.00
Furnish and install new 16"
ductile iron water main with
polywrap;complete as Linear
4028 specified Feet 2,874.00 2,851.00 -23.00 $71.85 ($1,652.55)
Furnish and install
connections to existing 12"
water main;complete as
4064 specified Each 3.00 1.00 -2.00 $1,945.00 $3,890.00
Furnish and install 10"x 8"
water main tee;complete as
4120 1 specified Each 1.00 1.00 $691.00
Fumish and Install 16"x 6"
water main tee;complete as
4137 specified Each 9.00 9.00 $1,436.00
Furnish and install-16"x 10"
water main tee;complete as
4139 specified Each 1.00 1.00 $1,690.00
Furnish and install 16"x 16"
water main tee;complete as
4141s ecifiedEach 2.00 2.00 $2,260.00
Fumish and install 16"11-114
degree water main bend;
4222 complete asspecified Each 6.00 3.00 -3.00 $1,178.00 $3,534.00
Furnish and install 16"22-172-
degree water main bend;
4231 complete asspecified Each 1.00 1.00 $1,180.00
Furnish and install 10"45
degree water main bend;
4238 complete ass ecified Each 1.00 2.00 1.00 $408.00 $408.00
Furnish and install 12"45
degree water main bend;
4239 complete asspecified Each 1.00 0.00 -1.00 $601.00 $601.00
Furnish and install 6"90
degree water main bend;
4245 complete asspecified Each 1.00 1.00 $235.00
Furnish and Install 6"water
main cap;complete as
4254 specified Each 1.00 0.00 -1.00 $115.60 $115.60
Furnish and Install 16"water
main cap;complete as
4258 specified Each 2.00 0.00 -2.00 $623.00 $1,246.00
Furnish and install 10"x 6"
water main reducer;complete
4266 asspecified Each 2.00 1.00 -1.00 $301.00 $301.00
Furnish and install 12"x 10"
water main reducer;complete
4271 ass ecified Each 1.00 1.00 $457.00
Furnish and install 16"x 12"
water main reducer;complete
4276 asspecified Each 2.00 1.00 -1.00 $868.00 $868.00
Furnish and install 8"water
main plug;complete as
4309 specified Each 1.00 1.00 $144.00
Page 6 of 8
CONTRACT 16-09 CHANGE ORDER 91(FINAL)
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install 16"water
main plug;complete as
4312 specified Each 2.00 2.00 $618.00
Furnish and install 6"water
main gate valve;complete as
4401 specified Each 11.00 11.00 $989.00
Furnish and install 10"water
main gate valve;complete as
4403 s ecified Each 1.00 1.00 $1,900.00
Furnish and install 12"water
main gate valve;complete as
4404 specified Each 3.00 1.00 -2.00 $2,302.00 $4,604.00
Furnish and install 16"water
main gate valve;complete as
4405 specified Each 5.00 5.00 $7,172.00
Furnish and install hydrant;
4500 complete ass ecified Each 9.00 9.00 $3,204,00
Relocate existing hydrant;
4501 complete asspecified I Each I I An 1.00 $864.00
Six-inch(6");90 degree
hydrant ell;complete as
4503 specified Each 8.00 8.00 $300.00
SECTION IV-(BID ITEMS 4020-4503)-SUBTOTAL $1,804.25 ($19,919.15)
SECTION IV-ADDITIONAL WORK REQUIRED: CO#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install 6"45
degree water main bend;
1-4236 complete asspecified Each 0.00 5.00 5.00 $300.00 $1,500.00
Cost to live tap;complete as
1-40000 specified Each 0.00 1.00 1.00 $9,361.20 $9,361.20
Raise hydrant H-1 and Lump
1440001 valves;complete asspecified Sum 0.00 1.00 1.00 $1,610.34 $1,610.34
Hydrant extensions;complete Lump
1-40002 asspecified Sum 0.00 1.00 1.00 $2,878.25 $287825
Cut-in bill from City;complete Lump
1-40003 asspecified I Sum 1 0.00 1.00 1 1.00 $2,917.50 $2,917.50
SECTION IV-(ADDITIONAL WORK REQUIRED: CO#1 ITEMS 1.4236-1-40003)-SUBTOTAL $18,257.29 $0.00
NET INCREASE TO: SECTION IV $152.39
SECTION V-ELECTRICAL
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Fumish and install pull box
(steel);18"x 30';complete as
5010 specified Each 10.00 10.00 $560.00
Furnish and install pull box
(steel);24"x 36';complete as
5016 specified Each 1.00 2.00 1.00 $611.00 $611.00
Furnish and install lighting
control cabinet;complete as
5050 specified Each 1.00 1.00 $5,906.00
Furnish and install 2"
Schedule 40 PVC;complete Linear
5120 asspecified Feet 2,800.00 2,829.00 29.00 $5.09 $147.61
Furnish and install 3"
Schedule 40 PVC;complete Linear
5130 asspecified Feet 40.00 40.00 $61.10
Furnish and install 12 gauge
red-coated wire;complete as Linear
5270 specified Feet 1 6,000.00 1 1,200.00 -4,800.00 $0.51 $2,448.00
Page 7 of 8
CONTRACT 16-09 CHANGE ORDER#1(FINAL)
E
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
i Furnish and install 12 gauge
black-coated wire;complete Linear
5271 asspecified Feet 6,000.00 0.00 -6,000.00 $0.51 $3,060.00
Furnish and install 12 gauge
green-coated wire;complete Linear
5272 asspecified Feet 6,000.00 0.00 -6,000.00 $0.51 $3,060.00
LED light pole assembly;
5405 complete asspecified Each 10.00 10.00 $2,597.00
Furnish and install Type 5
5504 base;complete asspecified Each 10.00 10.00 $611.00
Concrete control cabinet
5509 base;complete asspecified Each 1.00 1.00 $1,222.00
i
SECTION V-(BID ITEMS 5010-5609)-SUBTOTAL $758.61 ($8,568.00)
SECTION V-ADDITIONAL WORK REQUIRED: CO#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install 6 gauge
red-coated wire;complete as Linear
1-5240 s ecified Foot 0.00 5,407.00 5,407.00 $1.58 $8,543.06
Furnish and install 6 gauge
black-coated wire;complete Linear
1-5241 as s ecified Foot 0.00 5,407.00 5,407.00 $1.58 $8,543.06
Furnish and install 6 gauge
green-coated wire;complete Linear
1-5242 ass specified Foot 0.00 2,740.00 2,740.00 $1.58 $4,329.20
SECTION V-(ADDITIONAL WORK REQUIRED: CO#1 ITEMS 1-5240-1-5242)-SUBTOTAL $21,415.32 $0.00
NET INCREASE TO: SECTION V $13,606.93
NET INCREASE TO SECTIONS I,II,III,IV&V $162,321.24
NET DECREASE TO SECTIONS I,II,III,IV&V ($62,703.66)
NET INCREASE TO CONTRACT: $109,617.58
Page 8 of 8