HomeMy WebLinkAboutContract13-24, Change Order No. 4 2017 r,A
City
0fV
Oshkosh
January 19, 2017
Mr. Gerald Hietpas
August Winter&Sons, Inc.
PO Box 1896
Appleton, WI 54912-1896
Re: Change Order No.4
Contract 13-24
Dear Mr. Hietpas:
Enclosed is an executed copy of Change Order No. 4 between the City of Oshkosh and August Winter
&Sons, Inc. regarding the abovementioned project.
If you have any questions,please call our office at(920)236-5065.
Sincerely,
7 �4k
James Rabe,P.E.,CCP E S C
Director of Public Works
JER/t1t
Enclosure: Change Order No. 4
cc: Pam Ubrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director(w/copy)
Steve Brand, Public Works Utility Bureau Manager (w/copy)
Linda Mohr, CH2M HILL Engineers (w/copy)
File (w/original)
1:\Engineering\2013 CONTRACrS\13-24 WWTP Ctrl Syst,Influent Purnp,&Aeration Blower
Upgrade\Contract Info\Change Orders\13-24 Executed CO#4 Ltr.-I-19-17.docx Page 1 of 1
City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1130 httP://WWW.Ci.oShkosh.wi.us
^ �
^
. Ch2&* CONTRACT MODIFICATION
CITY OF OSHKOSH_ CONTRACT NO. 13-24
�lCHANGE ORDER F� VVR|TTENAKAENDK�ENT MODIFICATION NO:� OU4
�` | | |
TO August Winter& Sons, Inc
PROJECT: Wastewater Treatment Plant Control System, Influent PROJECT NO: 482461
Pumping &Aermtion Blowers Upgrade
OWNER: City ofOshkosh
ENGINEER: CH2K8H\LL
The following modification(s)to the Contract are hereby ordered (use additional pages if required):
See attached contract credit items 4a.. 4b., and 4o.
These changes are made to reflect removal of mechanical limit switches and corrections to previous overpayment
issues.
See attached table summary.
Contract Amount or Price Contract Times (Calculate Days
Original Original Duration 760 Days
Previous Contract Previous Contract
Modification(s) Modification(s)
(Add/Deduct) (Add/Deduct) 0 Days
This Contract Modification This Contract
(Add/Deduct) $9,433.44 (deduct) Modification 120 Oeya
Revised Contract Amount Revised Contract Time 880 Days
The Revised Contract Completion Date is: December 31, 2016
Change Order No. 4 December 23,2016
City of Oshkosh Contract No. 13-24
Wastewater Treatment Plant Control System,Influent Pumping &Aeration Blower
Upgrade RECEIVED
Contractor: August Winter & Sons,Inc. D E C 2 7 2016
DEPT OF PUBLIC WORKS
This document shall become a supplement to City of Oshkosh Contract No. 13-24) a1h H, W I SCONSIN
provisions will apply hereto.
Item Description Action Amount
4a. Aeration valve limit switch credit Deduct ($8,280.00)
4b. Change Order No.2 WDNR correction due to math errors and Deduct ($322.66)
overhead charges of greater than 5%on sub-contractors.
4c. Change Order No.3 WDNR correction due to math errors,overhead Deduct ($830.78)
charges of greater than 5%on sub-contractors,and sales tax charged
on untaxable items.
TOTAL VALUE OF THIS CHANGE ORDER Deduct (9,433.44)
Signed for and in behalf of the City of Oshkosh
Mark A. Rohloff, City Manager
Pamela R. Ubrig,City derk
"AE,
LLy�'n'o
renson, Cit�y-
A tt o 1n ievX
jwa&,Lnv�
Trena Larson,Director of Finance
I hereby certify that the necessary provisions
have been made to pay the liability which will
accrue under this contract.
AUGUST WINTER & SONS, INC.
MECHANICAL CONTRACTORS
2323 NORTH ROEMER ROAD-APPLETON,WI 54911
PO BOX 1896*APPLETON,WI 54912
PHONE: 920-739-8881 *FAX: 920-739-2230
October 1,2016
CH2M
Attn:Linda Mohr 27
CHANGE ORDER PRICE AND BREAKDOWN
Project/Job#: Oshkosh WWTP Influent pump mods 61114
Description: COR 025 Aeration Flow Control Valve Limit Switches
Our change order price and breakdown follows:
August Winter
Material....................................................... $ (6,027)
Labor........................................... 0 hirs $ -
Direct Costs................................................. $ -
Equipment Rental.......................................... $ -
Indirect Costs............................................... $ -
Subtotal...................................................... $ (6,027)
Overhead.................................................... $
Total........................................................... $ (6,027)
Subcontracts
Total Subcontractor Costs............................... $ (2,146)
Subcontractor Markup.................................... $ (107)
Total Subcontractor Costs w/overhead............... $ (2,253)
Total AWS/Subcontractor Costs....................... $ (8,280)
Profit/Bond......... ................... ..................... $
Change Order Total.......................
$ (8,280)
Time extension required is 0 days, This quotation based upon acceptance within 30 days.
Exclusions: 0
Derek Lewin
August Winter&Sons, Inc.
PH:920-739-8881 FX:920-739-2230
VISIT OUR WEB SITE AT WWWAUGUSTWINTERCOM
Branch Office;5613 Schofield Avenue*Schofield,WI 54476*PH:7151355-7555 FAX:715/355-9048
HVAC'PLUMBING*TANK FABRICATION'PROCESS PIPING*IND.SHEETMETAL
SPECIALTY METAL FAB,*ASME PRESSURE VESSELS*ASME CODE WELDING*24 HR.SERVICE*ENGINEERING
STATE OF WISCONSIN LICENSED MASTER PLUMBERS,LICENSE NUMBER 227170
Mohr, Linda/MKE
From: Lecke, Darren/MKE
Sent: Tuesday, February 23, 2016 8:12 AM
To: Mohr, Linda/MKE
Subject: Oshkosh WWTP -Aeration Valve Positioner Limit Switches
Attachments: Oshkosh WWTP-Aeration Basin Flow Control Valves; RE:Oshkosh WWTP-RFI 033A
DeZurik correspondence re Rosemount converter;DVC6200 wiring; RE:DVC6200 wiring
Linda,
I have attached the quote for the parts from Novaspect, roughly about$6000.00 without labor included.
3/19/15 Email with Novaspect confirming wiring and need for external limit switch,also states that Dezurik was
quoted this option even though they deny it.
5/1/15 Email explaining wiring connections to valve and explains that limit switch connections are external to
positioner.
5/11/15 RFI-033A, Responds to positioner wiring questions and explains that limit switch connections are
external to positioner.it includes letter from DeZurik claiming that there is no external limit switch
option,which is not true.
2/23/16 Quote for parts.
Sincerely,
Darren Lecke
Instrument&Controls Engineer
D 414 847 0244
M 414 272 2426 x40244
CH2M
135 south 841"street
Suite 400
Milwaukee,WI 53214
USA
-RECEIVED
Novaspect
DEC 2 7 2016
DEPT OF PUBLIC WORKS
Quotation OSHKOS(-i, WISCONSIN
Attention: Darren Lecke Date: 2123/16
Company: CI-12M Hill,Inc, Quotation#: BS-210911 Rev: A
Address, 135 South 84th Street Please refer to quote number an PO.
Milwaukee,WI 53214 RFQ Number:
Re- mounting and limit switches for Dezurik
Phone: (414)847-0244 PR-RIA-PC6 and PR-R2A-PC6
Fax: Attachments:
Email: Darmn,LeckeCeh2m.com From. Ben Shaffner
Phone: (952)252-1535 Fax: (847)885-8200
Vendor. Novaspect,Inc, Email: bshafrncr@novaspect.com
Cc:
Novaspect,Inc.is pleased to offer the following quotation for your consideration.
Item Description Qty Cost Each Total Cost
1 TopWorx DXP-M21 GNE13 switches w 2 SPDT 8 $296.56 $2,400,00
Shipping:2 weeks ARO
2 PR-RIA-PC6,DVC6200 and DXP limit switch mounting kit 4 $450.00 $1,800.00
Shipping:10-12 weeks ARO
3 PR-R'A-PC6,DVC6200 and DXP limit switch mounting kit 4 $450,00 $1,800.00
Shipping:10-12 weeks ARO
Shipping: see items Freight: Prepay and Add
FOR: Shipping Point Partial Ship: Yes
Prices are firm for 30 days in US Dollars with any applicable taxes not included. Unless agreed to in advance by Vendor,and upon
approval of customers credit review,payment terms are net 30 days from receipt of invoice. Novaspect,Inc.standard terms and
conditions of sale apply to this quotation.
Please make your purchase order out to Novaspect,Inc-and reference quote 8S-210911.
Email purchase orders to customer xiOrnovi snect.com or login at www,novaspect.com for online ordering.
Thank you for the opportunity to provide this quotation.Please review and call with any questions,
BUYERS ACCEPTANCE IS LIMITED TO TERMS OF THIS QUOTE AND NOVASPECT,INC.STANDARD TERMS AND CONDITIONS
OF SALE,WHICH ARE INCORPORATED IN FULL BY THIS REFERENCE. THE PERMS ARE AVAILABLE
ATl31SP/Avvnv novasct c rm/�tcrms/tarms novasnecl.ndf(and will also be sent by mail,email or fax to the Buyer upon request).NOVASPECT,
INC.OBJECTS TO ANY DIFFERENT OR ADDITIONAL TERMS CONTAINED IN ANY PURCHASE ORDER OFFEROR
CONFIRMATION SENT OR TO BE SENT BY BUYER,WHICH ARE EXPRESSLY REJECTED.
i
I
k
wwtiv.novasnect.enm Page 1 of 1
f
i
i
i
I
AUGUST WINTER & SONS, INC.
MECHANICAL CONTRACTORS
2323 NORTH ROEMER ROAD*APPLETON,WI 54911
PO BOX 1896*APPLETON,WI 54912
PHONE: 920-739-8881 *FAX: 920-739-2230
October 1,2015
CH2M
Attn:Linda Mohr 27
CHANGE ORDER PRICE AND BREAKDOWN
Project/Job#: Oshkosh WWTP Influent pump mods 61114
Description: COR 025 Aeration Flow Control Valve Limit Switches
Our change order price and breakdown follows:
August Winter
Material.................. ........: ........................ $
Labor......... ....,..,r 0 hrs $
Direct Costs . ,......-- $'
Equipment Rental. .
Indirect Costs ...... ..... $
Subtotal.. '
$ -
Overhead.... $
Total.......... ...:. $
Subcontracts
Total Subcontractor Costs...............:..:........:. $ (2,146)
Subcontractor Markup.................................... $ (107)_
Total Subcontractor Costs w/overhead..:..:..:..:... $ (2,253)
Total AWS/Subcontractor Costs—. $ (2,253)
Profit/Bond,............ ......... $ (27)
Change Order Total....................... $ (2,280)
Time extension required is 0 days. This quotation based upon acceptance within 30 days.
z
Exclusions: 0
Derek Lewin
August Winter& Sons, Inc,
PH:920-739-8881 FX:920-739-2230
VISIT OUR WEB SITE AT WWW.AUGUSTWINTER.COM
Branch Office:5613 Schofield Avenue'Schofield,WI 54476*PH:715/355-7555FAX:715/355-9048
HVAC*PLUMBING'TANK FABRICATION*PROCESS PIPING*IND,SHEETMETAL
SPECIALTY METAL FAB.*ASME PRESSURE VESSELS*ASME CODE WELDING*24 HR,SERVICE'ENGINEERING
STATE OF WISCONSIN LICENSED MASTER PLUMBERS,LICENSE NUMBER 227170
I'
August Winter Sons, Inc. Page 1
Change Order/Small Projects Report
Project/Job#: Oshkosh WWTP Influent pump mods 61114 Date: 10/1/2015
Description: COR 025 Aeration Flow Control Valve Limit Switches
Change Order#: 27
MATERIAL
Material Credit w/restocking ................. 0.00
Material ADD ................ $
Sales Tax 0.0% $
Material Subtotal $ -
LABOR
General Foreman Hours 0.0 @ $ $
Foreman Hours 0.0@ $ $
Field Plumber/Fitter Hours 0.0 @ $ $
Field Tinner Hours 010 @ $ = $
Shop Hours 00 @ $ $
Operator Hours 0.0 @ $$- $
Labor Subtotal $
DIRECT COSTS
Insurance&Taxes 27.0% of Labor $
Trucking 5.0% of Labor $
Testing& Cleaning 0.0% of Labor $
Balance Air/Water 0.0% of Labor $
Tools&Expendables 6.0% of Labor $
Shop Equipment Charge $ 6.00 per shop hour $ -
Subsistence $
Subtotal $
Equipment 0.0 Hours @ $ $ -
Rental 0.0 Hours @ $ - $ -
0.0 Hours @ $ $
0.0 Hours @ $ $
0.0 Hours @ $ - $ -
j 0.0 Hours @ $ - $ - Subtotal $ -
1 Indirect Costs Indirect Costs Total $ -
Total Contractor Costs $_
Overhead 0.0%
Subtotal Contractor Costs
SUBCONTRACTS
Altmeyer Electric $ (2,146.00)
„................ $ -
............................ $
$
Total Subcontractor Costs $ (2,146)
NOTE: This change order does not address impact costs on Overhead 5.0° $ (107)
base contract. Subtotal Subcontractors Costs
Total Contractor/Subcontractor Costs $ (2,253)
Profit 0.0% $ -
Bond 1.2% $ (27)
Total Amount Of Change $ (2,280
Time extension required is 0 days. This quotation based upon acceptance within 30 days.
Exclusions:
I
NOTE:This change order does not address impact costs on base contract.
i
SAAWS Depariments\Change Order Form 10-11 rev. 12-23-09(2nd pg)
r
Altmeyer Electric, Inc.
COMMERCIAL • INDUSTRIAL - RESIDENTIAL
827 S.21st Street•Sheboygan,WI 53081
Phone:(920)458-3406• Fax:(920)458-4626
09/21/15
August Winter and Sons
P.O. BOX 1896
Appleton, WI 54911
Attn: Derek Lewin/Wendy Zeinert
RE: Oshkosh WWTP, COR #25
The cost to do the electrical portion of COR #25 is a credit of
$2,146.00,
-- IPS, no charge, already on site and complete
90% of piping is complete
Credit Breakdown:
E 1. 3/4" rigid pipe, 80' x 1.60 ($128.00)
2. 3/4" seal tight, 24' x 1.68 ($40.32)
3. 3/4" straight conn., 16 x 3.98 ($63.68)
4. #14 THHN, 3400' x .11 ($374.00)
5. Labor, 20 hrs x 77.00 ($1,540.00)
i
t
I
Sincerely,
Altmeyer Electric, Inc.
6
E
kEk
[1g
V'i