HomeMy WebLinkAboutBemis Company & Oshkosh Stormwater 2016 I
II
CITY OF OSHKOSH 8 3 1 8 1 9 8
STORMWATER MANAGEMENT FACILITY TX:4230898
MAINTENANCE AGREEMENT 1729013
Document Number Document Title
REGISTER'S OFFICE
IN E AGO COUNTY, WI
The City of Oshkosh,the Governing Body,and Bemis Company, Inc.,the Property RECORDED ON
owner,along with their successors and assigns, are the parties to this Agreement. The 12/02/2016 9:01 A
purpose of this Agreement is to ensure adequate storm water drainage facilities for the CHRISTOPHER LAR ON
Property described in this Agreement in connection with the surrounding public storm DEPUTY REGISTER OF DEEDS
water facilities. The consideration for this Agreement includes the City's approval of
proposed development on the Property. Additional consideration includes the Property RECORDING EEE 30.00
owner's clearer understanding of storm water drainage obligations for the Property, and PAGES: 14
the Governing Body's assurance that the storm water drainage issues relating to the
property can be more easily achieved through this Agreement.
CURRENT PROPERTY OWNERS SUBJECT TO THIS AGREEMENT:
Bemis Company,Inc. Recording Area
2200 Badger Avenue Name & Return Address:
Oshkosh, WI 54904 Oshkosh City Attorney's Office
(the successor entity after Curwood,Inc. combined with other entity(ies)) PO Box 1130
Oshkosh,WI 54903-1130
GOVERNING BODY: City of Oshkosh Tax Parcel Numbers:
PROPERTY SUBJECT TO THIS AGREEMENT
91325000000
The Property subject to this Agreement is located in the City of Oshkosh,Winnebago
County,and is more particularly described as follows:
[Legal Description Identified in Exhibit A]
GRADING AND DRAINAGE PLAN
The Property must always comply with the grading and drainage plan approved by the City. The approved grading and drainage plan may
be amended or modified from time to time after consultation with the Property owner. Compliance will be evaluated according to the
most current approved plan. A small scale version of the current grading and drainage plan is attached as Exhibit B or identification and
reference purposes. The full scale grading and drainage plan is on file for review with the City Department of Public Works,and will be
used to provide grading and drainage criteria and to govern compliance and any disputes.
PURPOSE
The three(3)primary purposes of this Agreement:
1)Notify the Property owner,as well as anyone interested in or connected to the Property that the Property is subject to this Agreement
and Chapter 14 of the Oshkosh Municipal Code,as amended,and that any owner of the Property assumes these obligations; and,
2)Identify specific storm water facilities that currently exist on the Property, or may be constructed or installed in the future;and,
3)Describe the minimum responsibilities for maintaining the Property's approved storm water management facilities and grading and
drainage plan.
RESTRICTIONS
The Property must always conform to its most current grading and drainage plan approved by the City. The Property is also subject to all
aspects of the Municipal Code, including storm water management requirements,as may be amended,which are currently located in
Chapter 14 of the Municipal Code. The storm water management requirements of the Municipal Code change from time to time,with the
Property owner receiving public notice as required by law. Changes may be made to the grading and drainage plan for the Property if
1
November 2,2016 I /
CITY OF OSHKOSH
STORNIWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Number Document Title
requested by the Property owner and after review of any changed circumstances on the Property. The approved grading and drainage plan
for the Property will be on file in the City of Oshkosh Department of Public Works and is fully incorporated by reference in this
Agreement.
RESPONSIBLE PARTIES
The owner of the Property,as well as their heirs,successors,and assigns,is responsible for maintaining the Property in the manner
described in this Agreement. The Property owner's responsibilities include maintaining approved vegetation,grading,drainage,and storm
water facilities on the Property.
STORM WATER FACILITIES
The Property's storm water facilities consist of:
1. Storm Water Detention Basin;and
2. Storm Sewer; and
3. Inlet and Manhole Covers.
INSPECTION AND MAINTENANCE
All storm water facilities and components of the storm water system shall be inspected at least semiannually,with one inspection occurring
in early spring and one inspection occurring in early autumn. The Property's storm water drainage system must also be inspected after
major storm events. The storm water facilities and grading and drainage scheme must be maintained as designed in order to achieve the
desired storm water drainage objectives. Therefore,maintenance and repairs must be performed expeditiously when system deficiencies
are identified. The existence of soil erosion, clogged or damaged inlets and/or pipes,sedimentation of the basin and/or biofilter,rilling of
side slopes, and other damaged features of the stormwater system are examples of items requiring maintenance or repair work. Material
removed from the basin or biofilter may require special handling dependent upon current Wisconsin Department of Natural Resources
disposal practices.
If an Infiltration Basin is installed/constructed,then maintenance activities include: remove coarse and gravel sediment that has
accumulated; inspecting surface and repair eroded areas; inspect energy dissipator rock or grass inlet areas; inspect overflow structures;
remove litter and debris;and replace vegetation when necessary. Infiltration Basin inspection and maintenance requirements applicable to
the Property will change as the rules enforced by the Governing Body change.
If a wet basin is installed/constructed,then dredging operations are required to remove the excess sediment when the depth of water in the
wet detention basin diminishes below three feet causing the efficiency of the detention basin to decrease. The storm water detention
basin(s)must retain the safety shelf after dredging. Damage to the safety shelf or detention basin liner must be repaired to preserve the
safety and operation of the facilities.
I
If a dry basin and/or swale is installed/constructed,then dry basin and swale maintenance includes removal of trash and debris,repairing
erosion,maintaining vegetation,and dredging when necessary.
The examples of maintenance activities that are identified above are not intended to be complete. The minimum information required to
be viewed as a guideline for potential maintenance or repair activities is identified in the Inspection and Maintenance Logs attached as
Exhibit C. The Property owner shall,upon request,make available for inspection all maintenance records to the City's Department of
Public Works, or any agent of the City, during the life of the system.
I
PROHIBITIONS
Mowing in buffer areas, detention basin banks and drainage ways shall be minimized in order to maximize filtration of runoff. If
occasional mowing is necessary,the mowing height must not be less than six inches. Applications of fertilizers,herbicides,pesticide or
other chemical applications are prohibited in buffer areas,on detention basin banks and along drainage ways.
2
November 2,2016
s
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Number Document Title
COMPLIANCE
The Property benefits from a properly maintained grading and drainage plan as well as properly maintained storm water facilities. In the
event the Property owner fails to perform any obligation related to this Agreement,the City of Oshkosh shall have the authority to enter
the private Property to inspect,maintain,repair,reconstruct,and/or modify any component of the approved grading and drainage plan or
storm water facility. The City has no duty to take such action but may do so at its discretion. The ability to enter the Property and take
such action is not an exclusive remedy, and the City may take any lawful action to enforce this Agreement and/or the Municipal Code.
The Property owner grants to the City of Oshkosh a limited,nonexclusive easement in perpetuity over the Property for the purpose of
addressing grading and drainage deficiencies, as well as providing reasonable and necessary access to any storm water facility that is
located on or within the Property. The City of Oshkosh shall use only that part of the Property reasonably necessary to allow the
inspection,maintenance,and/or repair of the approved grading and drainage plan or any storm water facility. If the City elects to perform
maintenance or repairs on the Property,then all associated costs for performing this work and enforcing this Agreement and/or storm
water management requirements of Chapter 14 of the Municipal Code,as may be amended from time to time, are subject to
reimbursement from Property owners,jointly and severally,or through encumbrances on the Property itself Reimbursement remedies
include placing an encumbrance against the Property as a Special Charge for Current Services pursuant to Sec. 66.0627 Wisconsin
Statutes,as amended,or through other methods to collect directly from the Property owner as allowed by law at the City's discretion. Any
Special Charge for Current Services shall be a lien on the Property and shall be collected with the real estate taxes. The Property owner
affirmatively waives notice requirements for Special Charges,and this provision shall constitute the Property owner's, and any respective
lot/parcel owner(s)if applicable,waiver of notice of hearing otherwise required by Sections 66.0627 or 66.0703 of the Wisconsin Statutes.
The storm water management facilities shall be for the benefit of the City of Oshkosh and the Property as described in this Agreement.
This Agreement is not intended to benefit third parties and there shall be no third party beneficiaries.
i
RECORDING
This agreement shall be recorded with the land records of the Winnebago County,Wisconsin,Register of Deeds. Bemis Company,Inc.,
shall bear the cost of recording this document.
I AMENDMENTS
i
This Agreement may be amended in whole or in part at any time by the owner of the Property,provided: 1)the amendment(s)are
approved in writing by the owners of a majority of the lots within the Property as recorded with the Register of Deeds, Winnebago County,
Wisconsin;and,2)the amendment(s)are approved in writing by the City of Oshkosh Board of Public Works. This Agreement shall be a
permanent covenant that shall,as provided by law,run with the land and any amendment to this Agreement shall be subject to the prior
approval by the City of Oshkosh.
[SIGNATURE PAGE FOLLOWS]
I
I
� � r
t
E This document was drafted by:
David J. Praska
Assistant City Attorney
Oshkosh, WI 54903-1130
i
3
November 2,2016
I
i
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Number j. Document Title
For the Owner/Developer:
Date: N
Bemis Company Inc. (the successor entity after Curwood,Inc. combined with other entity(ies))
%41
% 6
By:
JajeslRansom,President Bemis North AmericaARY
CO 0-T
PUB
State of Wisconsin .......
ss. OF \N\Ss
Winnebago County #0 °'4
Personally came before me on this day 0104eIAX 2016,the above named,James Ransom,to me known
to be the person whom executed the foregoing instrument and acknowledged the same.
I . 0
5q VUWj-VA —
Notary Public, State of Wisconsin
My commission expires: I a o
For the City of Oshkosh:
Date: Date: L
'Ile
>ry
11 ,
Mark'A. Rohloff,City Manager ramela R. Ubrig, City Clerk
State of Wisconsin
ss.
Winnebago County
Personally came before me on tbis�day of k6AA102016,the above named,Mark A. Rohloff and Pamela
LLC rN
R.Ubrig,to me known to be the persons who executed the forgoing ins ent an knowled;ed the same.
A ow
(,�_N to ublic, State of'"i 64in
My M v co o I
mission ex s:
Approved as to form:
Date-
Lorenson,t,&W'm-ey�-J
4
November 2,2016
REFERENCE MAP
All of Lot 1 of Certified Survey Map 166.5 and
part of the North 1/2 of Section 33, Town 18 North, Range 16 East,
all in the Thirteenth Ward, City of Oshkosh, Winnebago County, Wisconsin
s042 rs-w af: 201h AVE.
Seefian JJ 1
Nc,lh.ort com.r
F. Sktion J3
i tiff y1
9
0 09�9. vqi v
0 Y
lv 6
DOCUMENT 754093
$k 02 89'2229" 1152.54'
501T�J�.3. - OGCUMENT,F677665 1
$ v I LOT 1s
W
a
q -
°0 1 PARCEL 'A'
C.SM, 1b65
'R
je DOCUMENT 1557216 DOCUMENT
o ja 1667605
� Fo i
o iry
1$ i
�ACArEb BADGER A1�iVU£ DOCUMENT
N89' 2' 9
" W I t
40.00 j X570639
h CO
DOCUMENT
J754093
Z I
PARCEL B'
W a 4 I DOCUMENT,,5.572 r 6
D 5 89 '22 29" E
- 740.00'
2 ^'
NN ` i y
U;N'
' �`�• �Section J3 h
rn (,
x �-_.N 89'sI9'95' W '�'S910 01" iY 7838:62' I"
96.84
I CURVE DATA
CURVE RADIUS mc CHORD- CHORD-BEARING
CJ-
5J4.00' 900.18' 898.70' 5 06'2248.0' W
C-1 4
C-2 1208.75' J4J.J4' J42.19- S 19'07'16.5' W 43
C-J J92.03' 121,55' 121.07' S 09'17 56,0' W
C-4 404,02' 181.77' 180,24' N 12'37"58.0' W
C-5 14,9.31.13' 449.Jf' 449.30' N 58'42'78.5' E }�T
B£ARAICS ARE R£fERENC£D W FIE NO.RTN
This map and Iegal description are derived from existing UNE 9F n+£NORTMV£Sr 1/4, 6ECADN JJ
-legal descriptions recorded in Documents 11'754093, 1667605, R£CORDEa TO MAR s B9'2229`£
1557216, 1570383 and 1754093 and were NOT field verified. 1 ` 4O0
0 400 wo
� _ SCArL tN Ff£T
Martenson & Eisele, Inc.
Engineering - $urveying -- Planning PROJECT ND 221-3 i 6
1919 Amer'con Court FIELD BOOK PAGE
f� Neonah, W1 54956
(920) 7J 1-0381 FILE 22 f J 16por SHEET 2 OF 2
Fox (920) 7JJ-8578
E-AWL mailOmaitenson-eise/e.Com INNS TN$TRUM£NT WAS DRAM'0 9X-M.A.$'trobel
I
Capture screen nc,a
i
All of Lot I of Certified Survey Map 1665,and part of the North 1/2 of Section 33,Town 18 North, Range
16 P,kst,all in the Thirteenth Waist,City of Oshkosh, Winnebago County, Wisconsin described as follows:
Commencing at the North 1/4 corner of said Section 33;
thence along the North line of the Northeast 1/4 of said Section 33;
South 89 degrees 22 minutes 29 seconds East,873.50 feet;
thence South 00 degrees 42 minutes 36 seconds West,40.00 feet
to the South right-of-way line of W.20'h Avenue(C.T,H."K")and beuig the point of beginning;
thence along the East line of lands described in Document#754093,
South 00 degrees 42 minutes 36 seconds West,450.01 feet;
thence along the North lines of lands described in Document#557216 and said Lot 1,
South 89 degrees 22 minutes 29 seconds East, 1152.54 feet
thence along the West line of Washburn Street,
South 00 degrees 41 minutes 32 seconds West,490.42 feet;
thence continuing along the West line of Washburn Street,
900.18 feet along an arc of a curve to the right having a radius of 4534,00 feet whose chord is 898,70 feet
that bears South 06 degrees 22 minutes 48.0 seconds West:
thence continuing along the West lute of Washburn Street,
34.34 feet along an arc of a curve to the right having a radius of 1208.75 feet whose chord is 342:19 feet
that bears South 19 degrees 07 minutes 16.5 seconds West;
thence continuing along the West fine of Washburn Street,
South 27 degrees 15 minutes 3I seconds West,384.57 feet;
thence continuing along the West line of Washburn Street,
121.55 feet along an arc of a curve to the left having a radius of 392.03 fe^.t whose chord is 121.07 feet utat
bears South 09 degrees 12 minutes 56.0 seconds West
thence along the South line of the Northeast 1/4 of said Section 33;
North 89 degrees 10 minutes 01 seconds West, 1639.62 feet
to the Center of said Section 33;
thenece along the South line of the Northwest 1/4 of said Section 33;
North 89 degrees 09 minutes 45 seconds West,96.84 feet
thence along the East right-of-way line of Universal Street
North 25 degrees 30 minutes 56 seconds West,228,97 feet;
thence continuing along the East right-of-way line of Universal Street
181 77 feet along an arc of a curve to the right having a radius of 404.02 feet whose chord is 180.24 feet
that bears North 12 degrees 37 minutes 58:0 seconds West;
thence along the South line of Lot 1 of Certified Survey Map 845,
South 81)degrees 22 minutes 29 seconds East, 140.00 feet;
thence along the East line of Lot 1 of Certified Survey Map 845,
North 00 degrees 15 minutes 00 seconds East,645.00 feet;
thence along die Nor+1t Gne of Lot 1 of Certified Survey Map 845,
North 89 degrees 22 minutes 29 seconds West,40.00 feet:
thence along the West line of lands described in Document#557216,
North 00 degrees 15 minutes 00 seconds East,994.04 feet
thence along the Southerly right-0f--way of the Wisconsin Southern Railroad,
North 59 degrees 34 minutes 02 seconds.East,696.90 feet
thence continuing along the Southerly right-of-way of the Wisconsin Southern Railroad,
449.31 feet along an arc of a curve to the lett having a radius of 14,931.13 feet whose chord is 440.30 feet
that bears North 58 degrees 42 minutes 18.5 seconds East;
tlience along the South right-of-way time of W.20'h Avenue(C,T,H. "K"),
South 89 degrees 22 minutes 29 seconds East,49.37 feet to the point of beginning.containing. I0 aures
Subject to all easements and restrictions of record,
�.. \ K E g m
N �\_ \\ uNa Z maim>= Z
sa \ -
2z
t19 z'�y �>
O
—U){ ! \'
• \ \\ \ 6m 6_oa® 9
1.
lA
y \ -
m vfill
oz
CIO
1 �n
D e
D �;
mm�
i \
S 3
m
m ! \
X68i
V5
Z
_. _ fie4
m
Z r
i
m i r'
.�
1p Ago! Piu Cyd
Ul-°
Ylo �o n
GRADING/ PROTECT
TANDEM COATER BUttDWG ADDITION A Av
li OA §DRAINAGE PLAN
T u A K A ixfWUJ119
BEMIS NORTH AMERIG-BEMIS SPEGW.TY FILMS
Eu
i I BIB \
m •.� ' � I I !
I j i a
� o
m G
M tTt m { 3003 z—q
I � z•�
I
I c o�
m c8 m
z mom^ z
t I � _ IS
, !LI
o
WASHBURN STREET -
n
T zyB� c
m omx \a,
.
I f�"
� m
vx
Z
C � n
C S
I o
'an $$$ x <
m z.. y -
Z gig ,x
a o o A1 12
o
m 650 Z
fin° m Ko 0 0 0 P�6" o foo v a
(A C
to �-
'1 m m m m cm " c ooz m — m fa
;0 n � m x
g n c f f Z O H ri Z Z m o [° qd r,>
Vl ,•p <
N ev Wo mo
O m N >
n z o y
n m o
y
m r.-
m
E < ■
m q 0
k,
PROJECT i T/8RD13 SANRARr Ure CONF IM GBA IIT
`MET gg PROPOSED PARKING LOT EIFANBIGN z D O� Z B/tTrz013 Plµly,.11iilfil'fANFLiGTB GBA
DETENTION m a R CURWOOD INC. uj
3 crzsrzofa Fwwc vsueµn A cBA
EI O "tf 72MRADGERAVENVE s Ip' _ n vury/ro my os osnvn v,ma,n
.4h POND PLAN 4m �
OSHKOSH WISCONSIN IREVI DATE I GEscluPnav Br uun°KG
� I I
o I I \ I
m czci
zn I i Int t I I
m
1 I I 'll I a— fcm
Ino z� c m i
ch m
co
— �- m� or I l
m o I I
fn'9Z cmz
to oxc� Zm € I I
-< �C)'oGziov qjl
O
oz LL
ZOp ro D
Dmb° Nm I 1 I qli
-------
ovm z I k qI /
m WZ*
Z
o s m
m r #
O I I ti r r
m m
mN o�
D w
� z
c/) R'
om—
�� I
�
�� I I
w I woo
zv p-no
i p(D I I oZ5
zop cm0
me D
D ox�x I t I! I, m
D 1
Ln I ( <
cf) qt
I ,
_ :�
mvz
ZOM
i
m Ac
�� ' I I \\
�...�... I M m
z m o
I \ G)_M nh
( a sm
pzo
E n �� �� 1 \\
\ � Z
I
„m t ° I •
anI
I
I m D p RNA
PROJECT
0 OVERALL PROPOS MPARIONGIOT"PANSION
N a PROJECTm a 4 CURWOOD INC. o o
F' ® 12M0 GERAVENVE : r» vaua_wre.w urr r..k vo rs wxmA.we/Powr:n/asrx vnv
€. e SITE PLAN OSHKOSH WISCONSIN K aEv boare cEscaPnGN <0»05 er crew C.
�I
Inspection & Maintenance Log
Detention Basin
Inspection Year:
Name of Site: Address:
Inspector: Company:
Municipality Phone;
Contact:
* Facility owner responsible for inspecting, maintaining, and repairing facility components after major
storm events (greater than %"), annually at a minimum. Check any deficiencies noted and comment
for maintenance actions taken, date of repair, and any alerts. Inspection items with no*should be
completed by a qualified professional every five years (or more frequently if concerns are noted).
Inspection {tem Storm Storm Storm Maintenance Action Date
Date Date Date
Pond
Bank Erosion
Debris/Trash Accumulation
Visible pollution
Abnormal water levels
Sediment Accumulation
Depressions, Whirlpools, Sinkholes
Embankment
1. Upstream Slope- Poor Grass Cover*
Erosion or Slides
Trees/Brush Growing on Slopes
Deficient Riprap Protection
Animal Burrows
Depressions or Bulges
Settlement
Longitudinal Cracks
Transverse Cracks
UJ
Pagel of 4 Rev.02122/2008
Inspection & Maintenance Log
Detention' Basin
Inspection Item Storm Storm Storm Maintenance Action Date
Date Date Date
2, Crest—Settlement*
j Misalignment
I
Cracking
1 Downstream Slope- Poor Grass
Cover
Erosion or Slides
j Trees/Brush Growing on Slopes
r
I
Animal Burrows
Excessive or Cloudy Seepage
Longitudinal Cracks
Transverse Cracks
Depressions or Bulges
Settlement
Seeps, leaks, or boils
I
Uj
r
i
i
I
F
Page 2 of 4 Rev.02/22/2008
Inspection & Maintenance Log
Detention Basin
--Storm S_torm Storm
Maintenance Action Date
Inspection Item Date Date Date
4. Emergency Spillway—Exposed
Fabric
Overgrown Vegetation
Erosion/Backcutting at berm or road*
Rutting or pot-holes
Obstructions or debris
Inadequate Riprap/Armor
Cracking
Slumping/Sloughing of Embankment
Settlement
Spillway
1, Eroding or Backcutting
Overgrown Vegetation
Obstructions with Debris
Excessive Siltation
Slumping/Sloughing
Control Structure
1. Inlet- Debris in Conveyance Area
Erosion or Undercutting *
Stop-log deterioration leaking
Joint Separation
Cracks in Concrete
Deteriorated piping
Displacemgnt of Structure
.0
Page 3 of 4 Rev,02/2212008 X
Uj
Inspection & Maintenance Log
Detention Basin
2. Outlet- Erosion or Backcutting
i
Debris in'Culvert or Trash Rack
i
IUndermining/Scour'
Inoperable control valve
Inoperable flap gate
Joint Separation
i
Cracks in Concrete
Downstream Area
1. Erosion
Debris/Obstructions
i
2. Bridge/Culvert Problems
Buildings Issues
i
Foundation Concerns
I
i
y �
Page 4 of 4 Rev.02/2212008 LU
Inspection & Maintenance Log
Catch Basin / Proprietary Device
Inspection Year:
Name of Site: Address:
Inspector: Company:
Municipality
Contact: Phone:
Facility owner responsible for inspecting, maintaining, and repairing facility components after major
storm events (greater than %"), annually at a minimum. Check any deficiencies noted and comment
for maintenance actions taken, date of repair, and any alerts. Inspection items with no *should be
completed by a qualified professional every five years (or more frequently if concerns are noted).
Inspection Item Storm Storm Storm Maintenance Action Date
Date Date Date
Catch Basin / Proprietary Device
Inlet Protection * Remove after
Stabilization
Debris/Trash Accumulation * Clean up/Remove
Abnormal water levels * Contact Municipality
Sediment/ Floatables Accumulation * Remove(pump and
dispose of at
wastewater treatment
plant) **
Depressions around facility Contact Municipality
Joint Separation Contact Municipality
Cracks in Concrete Contact Municipality
Deteriorated piping Contact Municipality
Displacement of Structure Contact Municipality
** Pumping Details (based on design guidelines): 1
Type of unit(s) Design Pumping Frequency
Dates Pumped
Pumper Disposal Location
LU
Page 1 of 1 Rev. 02/22/2008