RE: Change Order No. 1 (Final)
Contract 16-20
Dear Ms. Wood:
Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and
Wood Sewer & Excavating regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
2 11W
es Rabe, P.E., CPESC SC&
Director of Public Works
JER/t1t
Enclosure: Change Order No. 1 (Final)
cc: Pam Uhrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director (w/copy)
File (w/original)
I:\Engineering\2016 CONTRACrS\16-20 Mini Stonn Swr-Sturm Lat\Project_lnformation\Contract Page 1 of 1
Info\Change Orders\16-20 Executed CO Al Final Ltr�_12-7-16.docx
City Hall,215 Church Avenue P.O. Box 1130 Oshkosh,WI 54903-1130 http://www.ci.oshkosh.wi.us
TO: Wood Sewer& Excavating CHANGE ORDER #1 (FINAL)
E9238 Cty Rd X DATE: November 18,2016
New London,WI 54961
Your present contract with the City of Oshkosh,Contract No.16-20,awarded May 24,2016,is hereby
amended and changed as follows:
NET INCREASE TO: SECTION I-PAVING $10,011.04
NET DECREASE TO: SECTION II-STORM SEWER ($978.80)
NET DECREASE TO: SECTION III-SANITARY SEWER ($300.00)
NET INCREASE TO CONTRACT $8,732.24
Section I Section II Section III
(Paving) (Storm) (Sanitary) Totals
Bid Total $87,834.00 $125,670.00 $300.00 $213,804.00
CO N1 $10,011.04 ($978.80) ($300.00) $8,732.24
Contract Total $97,845.04 $124,691.20 $0.00 $222,536.24
CITY OF OSHKOSH
BY:
City Manager
i e k
Approved and accepted:
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,
under the within Change Order.
JU:U Ac�L nm
Comptroller
Approve s to form:
City Attorney
CONTRACT 16-20 CHANGE ORDER#1 (FINAL)
SECTION I-PAVING
ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
1100 Removing pavement; Square
com tete ass ecified Yards 389.00 431.30 42.30 $10.00 $423.00
1110 Removing curb and gutter; Linear
complete asspecified Feet 40.00 49.40 9.40 $5.00 $47.00
1120 Removing concrete and
asphalt sidewalk and
driveway;complete as Square
specified Yards 1253.00 1,325.04 72.04 $2.00 $144.08
1308 7"concrete pavement
removal and replacement;
including sawing;pavement
ties;integral curb and fine
grading;turf restoration;and
traffic control;complete as Square
specified Yards 466.00 203.45 -262.55 $76.00 $19,953.80
1309 7"concrete pavement HES
removal and replacement;
including sawing;pavement
ties;integral curb and fine
grading;turf restoration;and
traffic control;complete as Square
specified Yards 138.00 347.40 209.40 $79.00 $16,542.60
1350 Pavement ties, complete as
specified Each 16.00 18.00 2.00 $12.00 $24.00
1370 Turf restoration;complete as Square
specified Yards 345.00 268.08 -76.92 $9.00 $692.28
1440 30"curb and gutter;T;with
5"CABC and grading; Linear
complete asspecified Feet 40.00 49.40 9.40 $30.00 $282.00
1500 4"concrete sidewalk with 3"
CABC and grading;complete Squre
asspecified Feet 764.00 834.77 70.77 $6.00 $424.62
1510 6"concrete
sidewalk/driveway/ramp with
3"CABC and grading; Square
complete asspecified Feet 495.00 490.26 -4.74 $7.00 $33.18
1540 Curb ramp detectable
warning field(natural/non-
painted),complete as Square
specified Feet 16.00 8.00 -8.00 $30.00 $240.00
1550 No.4 reinforcing rods-
deformed,epoxy-coated, Linear
complete asspecified Feet 155.00 210.00 55.00 $2.00 $110.00
1560 Drilled No.4 sidewalk tie bars
-deformed,epoxy-coated,
complete as specified
Each 104.00 92.00 -12.00 $4.50 $54.00
1700 Sawing existing pavement, Linear
complete asspecified Feet 685.00 727.10 42.10 $3.00 $126.30
i
i
€
Page 1 of 3
I
CONTRACT 16-20 CHANGE ORDER#1 (FINAL)
ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
1906 4"asphaltic pavement with
10"CABC and grading; Square
complete as s ecified Yards 389.00 431.30 42.30 $49.00 $2,072.70
SECTION I-(BID ITEMS 1100-1906)-SUBTOTAL $20,196.30 ($20,973.26)
ADDITIONAL WORK REQUIRED: CO#1 -SECTION I
ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
1-1710 Sawing concrete pavement
full depth;complete as Linear
specified Foot 0.00 177.00 177.00 $4.00 $708.00
1-10000 9"concrete pavement
doweled;HES removal and
replacement;including
sawing;pavement ties;
integral curb&grading;
terracing&traffic control; Square
com tete ass ecified Yards 0.00 120.00 120.00 $84.00 $10,080.00
ADDITIONAL WORK: CO#1 -(ITEMS 1-1710-1-10000)-SUBTOTAL $10,788.00 $0.00
NET INCREASE TO: SECTION 1 $10,011.04
SECTION 11-STORM SEWER
ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
2000 Furnish and install 6"storm Linear
sewer,complete as specified Feet 35.00 26.20 -8.80 $70.00 $616.00
2001 Furnish and install 8"storm Linear
sewer,complete as specified Feet 210.00 201.10 -8.90 $69.00 $614.10
2003 Furnish and install 12"storm Linear
sewer,complete as specified Feet 160.00 153.50 -6.50 $75.00 $487.50
2006 Furnish and install 15"storm Linear
sewer,complete as specified Feet 170.00 162.00 -8.00 $77.00 $616.00
2201 Furnish and install standard
storm sewer manhole(4'
diameter);complete as Vertical
specified Feet 10.12 10.19 0.07 $500.00 $35.00
2237 Furnish and install Type 3
inlet(with 18"sump);
complete as specified Each 1.00 1.00 $2,000.00
2400 Furnish and install 6"storm Linear
sewer,complete as specified Feet 715.00 670.20 -44.80 $84.00 $3,763.20
2404 Furnish and install storm
sewer marker balls,complete
as specified Each 50.00 47.00 -3.00 $20.00 $60.00
2406 Furnish and install storm
sewer clay dams;complete
as specified Each 25.00 24.00 -1.00 $40.00 $40.00
2408 Furnish and install storm
sewer lateral inlet;complete
as specified Each 14.00 11.00 -3.00 1 $490.00 $1,470.00
Page 2 of 3
CONTRACT 16-20 CHANGE ORDER#1 (FINAL)
ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
2412 Slurry backfill(storm service);
complete as specified Cubic
Yards 10.00 0.00 -10.00 $80.00 $800.00
2508 Furnish; install;maintain;and
remove Type D modified inlet
protection;complete as
specified Each 60.00 58.00 -2.00 $40.00 $80.00
2850 Connect to existing storm
sewer main;complete as
specified Each 2.00 4.00 2.00 $200.00 $400.00
2852 Connect to existing storm
sewer lateral;complete as
specified Each 1.00 1.00 $100.00
2854 Connect lateral to existing
storm sewer main;complete
as specified Each 13.00 17.00 4.00 $220.00 $880.00
2856 Connect to existing storm
sewer manhole;complete as
specified Each 2.00 2.00 $220.00
2858 Connect to existing storm
sewer inlet;complete as
specified Each 3.00 2.00 -1.00 $220.00 $220.00
SECTION II-(BID ITEMS 2014-2960)-SUBTOTAL $1,315.00 ($8,766.80)
ADDITIONAL WORK REQUIRED: CO#1 - SECTION II
ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
1-20000 6"perforated drain tile; Linear
complete as specified Foot 0.00 67.00 67.00 $19.00 $1,273.00
1-20001 Storm lateral repair on
Bernheim Street for Charter; Lump
complete as specified Sum 0.00 1 1.00 1.00 $5,200.00 $5,200.00
ADDITIONAL WORK: CO#1 -(ITEMS 20000-20006)-SUBTOTAL $6,473.00 $0.00
NET DECREASE TO: SECTION II ($978.80)
SECTION 111-SANITARY SEWER
ITEM DESCRIPTIONUNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
3114 Furnish and install external
sanitary sewer manhole
chimney seal; complete as
specified Each 1.00 0.00 -1.00 $300.00 $300.00
SECTION 111-(BID ITEMS 3114)-SUBTOTAL $0.00 ($300.00)
NET DECREASE TO: SECTION 111 ($300.00)
NET INCREASE TO SECTIONS I,11,&III $38,772.30
NET DECREASE TO SECTIONS I, 11,&111 ($30,040.06)
NET INCREASE TO CONTRACT: $8,732.24