HomeMy WebLinkAboutChange Order No.1 Contract 16-18 Mir Id City Oshkosh December 7, 2016 Mr. Ryan Minlschmidt RJM Construction 601 West Forest Street Black Creek, WI 54106 RE: Change Order No. 1 (Final) Contract 16-18 Dear Mr. Minlschmidt: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and RJM Construction regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, J es Rabe, P.E,, CPESC Director of Public Works JER/tlt Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk (w/original) Tara Wendt,Assistant Finance Director (w/copy) File (w/original) I:\Fngineertng`2016 CONTRAUS�16.18 WFP Storage BidgWmject_Wormalion\Contract trdo\Change Page 1 Of 1 Orders\l6 19 Executed C0#1 Final Ltr_12-7-16.da« Cliy Hall,215 Church Avenue P.O.Box ]130 Oshkosh,W]54903-1130 htip://www.cl.oshkosh,wf.us TO: RJM CONSTRUCTION LLC CHANGE ORDER#1 (FINAL) 601 WEST FOREST STREET DATE: NOVEMBER 21,2016 BLACK CREEK,IMI 54106 Your present contract v6th the Cita,of Oshkosh,Contract No.16-18, a-WaTded April 12,2036,is hereby amended and changed as follows: NET INCREASE TO: SECTION I $91.00 NET INCREASE TO CONTRACT, $91.00 SECTION I 'TOTALS BID TOTAL $164,200.00 $164,200.00 CO 91 $91.00 $91.00 CONTRACTTOTAL $164,291.00 $164,291.00 CITY OF OSHKOSH , BY- Sit),Manager k � A�rovedandaccepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, tinder the witl-dn Change Order. Comptroller Approved as t orrn: City Attonl CONTRACT 16-18 CHANGE ORDER 91(FINAL) SECTION I ITEhf DESCRIPTION UNIT CONTRALT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTA]' QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONFRACTPRICE Construction of Water Filtration flan[storage Lump 30000 Sum 1.(10 1.00 $164,200.00 SECTION I-(BIB ITEM 30000)-SUBTOTAL $0.00 $0.00 SECTION I-ADDITIONAL WORK REQUIRED: CO el ITEAf DESCRIPTION UNII• COA7RACT INSTALLED NET NET UNIT INCREASE IN DECREASPIN NU114HR QUANTIFY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACrPRICE Credit for installing 100-amp service panel instead of sl�erified 200-antp service lump 1-30001 panel;Complete as specified Sum 0.00 1.0D 1 1.00 _$275.00 (q275.00) Add adjushnent ring to existing storm manhole and instal]new frame with cover, including butyl sealant; Lump 1-30002 complete as specified Sum (1.00 1,00 1.00 $266.00 $266.00 Add adjustment ring to sanitary marbole due to nein elevation closer to building; Lump 1-30003 mntpleie as specified Sum 0.00 1.00 1,00 $220.00 $220.00 Credit for reduction of quantity of exterior overhead door keypads;complete as Lump 1-30f104 specified Sinn 0.00 1 1.00 1.00 -$120.00 SECTION I-(ADDI'T'IONAL WORK REQUIRED: CO If1 ITEMS 1-30001-1-30004)-SUBTOTAL $91.00 $0.00 NET INCREASE TO: SECTION 1 $91.00 NET INCREASE TO SECTION I: $91.00 NET DECREASE TO SECTION 1: $0.00 NET INCREASE TO CONTRACT: $91.00 Nagel of 3 d C[ty Of Oshkosh December 7, 2016 Mr. Ben Rinken Maguire Iron, Inc. PO Box 1446 Sioux Falls, WI 57101 RE: Change Order No. I (Final) Contract 16-10 Dear Mr, Rinken: Enclosed is an executed copy of Change Order No. 1 (Final) between the Maguire Iron, Inc, regarding the abovementioned project. CtY of Oshkosh and If you have any questions, please call our office at (920)236.5065. Sincerely, ?meRabe,PP.E. CPESC � Director of Public Works JER/t1t Enclosure: Change Order No. 1 (Final) CC., Pam Ubrig, City Clerk (w/original) Tara Wendt,Assistant Finance Director (w/copy) File (w/original) 1:IEngineering12016COVTRAMT 16-10SIV I%TwrInt Painting lProject wrmaHonlContract W01 Change Orders 116-10 Executed CO 41 Final Lir 12-7-16.doa City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,W154903-1130 hl} Page 1 of 1 P:l/www.ci,oshkosh.wl.us TO: Maguire Iron,Inc, CHANGE ORDER#1 (FINAL) PO Box 1446 DATE: November 21,2016 Sioux Falls,SD 57101 Your present contract with the City of Oshkosh, Contract No, 16-10,awarded January 12,2016,is hereby amended and changed as follows: NET DECREASE TO: SECTION 1-METAL REPAIRS ($3,$00.00) NET INCREASE TO: SECTION 2-STEEL COATING $0.00 NET INCREASE TO: SECTION 3-MIXING SYSTEM $0.00 NET DECREASE TO CONTRACT: ($3,800,00) Section 1 Section 2 Section 3 (Metal Repairs) (Steel Coating) (Mixing Totals Bid Total $59,290.00 $148,000.00 $14,500,00 $M,790.00 . Co#1 ($3,800.00) $0.00 $0.00 . ($3;800,00) Contract Total $55,490.00 $1481000.00 $14,5.00.00 $217,990.00 CITY OF OSHKOSH BY: City Manager iy er A proved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within Change Order. Comptroller Approve s to form: City A orne CONTRACT 16.10 CHANGE ORDER 01(FINAL) SECTION 1-METAL REPAIRS ITEM {!N!7 PID INSTALLED NET NET UNfT INCREASE IN DECREASEIN DESCRIPTION NUMBER QUANTITY QUANTfr1ES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Install OverflOW flap gate; Lump 100 complete as specified Sum 1 1.00 1.00 $1,850.00 Replace mud valve,complete Lump 101 as specified Sum 1.00 1 1.00 $5,725.00 Supply fall prevention harnesses;complete as Lump 102 specified Sum 1.00 1.00 $1,9]5.00 Replace fall prevention Lump 103 device;complete as specified Sum 1.00 I.00 $2,400.00 Replace roof vent;complete Lump 104 as specified Sum 1.00 1.00 $9,500.00 Install cathodic clips and coupling;complete as Lump 105 specified Sum 1.00 1.00 $4,400.00 Weld cathodic covers; Lump 106 complete asspedffed Sum 1.00 1.00 Weld handrail brace baseplates;complete as Lump 107 specified Sum 1.00 1.00 $5,000.00 Install painter's rail; Lump 108 complete as specified Sum 1.00 1.00 $� SECTION I-(BID ITEMS 100-108)-SUBTOTAL $0.00 ADDITIONAL WORK REQUIRED. CO AS-SECTION 1 ITEM BID INSTALLED NET NET UNIT !tr! DESCRIPTION UNIT QUANTITY QUANTrTfES INCREASE DECREASE PRICE NUMBER Credit for City work associated with failed hatch Lump1-10000 askettom lete ass ecified Sum 0 1.00 53,800.«1 ADDITIONAL WORK: CO 91-(ITEM 1-10000)-SUBTOTAL ($3,800.00) $0.00 NET DECREASE TO: SECTION 1 ($3,800.00) SECTION 2-STEEL COATING ITEMBID 114STALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Wet interior repaint; Lump 200 complete as specified Sum I.00 1.00 $125300.00 Dry interior repaint; Lump 201 complete as specified Sum 1.00 1.00 $22,500.00 SECTION 2-(DID ITEMS 200-201)-SUBTOTAL $0.00 $0.00 NET iNCREASE TO: SECTION 2 $0.00 Pago I of 2 CONTRACT 16.10 CHANGE ORDER 11(FINAL) SECTION 3-MIXING SYSTEM ITEM DESCRIPTION UN7 HfD INSTALLED NET NET UNFf INCREASEIN DECREASE IN NUMOER QUANTfIY QUAMMIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACT pRICE Furnish and install mixing Lump 300 unit;complete as specified Sum 1.00 1,00 $14,5W.00 SECTION 3-(BID ITEM 300)-SUBTOTAL $0,00 $0.60 NETINCREASETO: SECTION $0.00 NET INCREASE TO SECTIONS 1,2,&3. ($3,800.00) NET DECREASE TO SECTIONS 1,2,&3: $0.00 NET DECREASE TO CONTRACT: ( Page 2 of 2