HomeMy WebLinkAboutVinton Const. Change order No. 1, Contract 16-16 City
Of
Oshkosh
November 17, 2016
Mr. Ron Raboine
Vinton Construction Co.
PO Box 1987
Manitowoc, WI 54221
Subject: Change Order No. 1 (Final)
Contract 16-16
Dear Mr. Raboine:
Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and
Wood Sewer & Excavating, Inc, regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
des Rabe, P. CPESC
Director of Public Works
JER/tit
Enclosure: Change Order No. 1 (Final)
cc: Pam Ubrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director (w/copy)
File (w/original)
1A En&*edng\2016 CONTRACI5\1b-16 Seniors Ctr 5 Parking Lot Impr�Proied_lnfonnation\Conlract
WChange Orders116.16 Executed CO 41(Final)_11-18.16.docx Page I of 1
City Hall,215 Church Avenue P.O.BOX 1130 Oshkosh,W154903-1130 htip://www.ci.oshkosh.wi.us
REVISED
TO: VINTON CONSTRUCTION CO CHANGE ORDER#1 (FINAL)
P.O.130X 1987 DATE:NOVEMBER 8,2016
MANITOWOC,WI 54221
Your present contract with the City of Oshkosh,Contract No.16-16,awarded February 9,2016,is hereby
amended and changed as follows:
NET INCREASE T0: SECTION I-PARKING LOT IMPROVEMENTS $70,435.88
NET INCREASE TO CONTRACT $70,435.88
SECTION I
TOTALS
BID TOTAL $777,322.12 $777,322,12 '
CO#1 $70,435.88 $70,435.88
CONTRACT TOTAL $847,758,00 $847,758.00
CITY OF OSHKOSH
BY:
ityManager
City Clerk
Approved and accepted:
Contu,A or
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,
ander the within Change Order.
Comptroller
Approved as Form:
City A
i
CONTRACT 16-16 CHANGE ORDER k1(FINAL)
SECTION I-PARKING LOT IMPROVEMENTS
ITEM CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN
NUMBER DESCRIPTION UNIT QUANTITY CONTRACT
Q QUANTITIES INCREASE DECREASF. PRICE PRICE CONTRACT PRICE
Furnish and install sign
1023 osts;com lete asspecified Each 17.00 17.00 $260.00
Removing pavement; Square
1100 com lete asspecified Yards 6,500.00 6,569.49 69.49 $1.00 $69.49
Removing concrete and
asphalt sidewalk and
driveway;complete as Square
1120 specified Feet 1,600.00 1,307.51 -292.49 $0.50 ($146.25)
Common excavation
(includes removal of existing
base materials and soils to
proposed design elevations
for all areas,except bio-
filtration areas);complete as Cubic
1201 specified Yards 2,000.00 2,000.00 $14.90
Excavation below subgrade
(unsuitable soils);complete Cubic
1203 asspecified Yards 1,000.00 0.00 -1,000.00 1 $5.90 ($5,900.00)
Excavation special(paving);
1220 complete as specified Tons 2,000.00 3,805.81 1,805.81 $13.35 $24,107.56
Heavy non-woven fabric(2
Iayers)(does not include
overlap or waste);complete Square
1235 asspecified Feet 71,400.00 93,089.98 21,689.98
$0.12 $2,602.80
Biaxial geogrid(does not
include overlap or waste); Square
1240 complete asspecified Feet 50,200.00 46,544.99 -3,655.01 $0.21 ($767.55)
Geomembrane finer for
permeable pavement, Square
1245 com Iete as s ecified Feet 10,600.00 10,600.00 $2.30
Furnish and install dumpster
enclosure(includes
foundation,concrete slab;
walls,gates;and all
associated materials and
labor);complete as specified Lump
1250 Sum 1.00 1.00 $23,000.00
30"curb and gutter;with 12"
curb head;8";with 6"CABC
and grading;complete as Linear
1445 Ispecified Feet 1,710.00 1,785.50 75.50
$18.70 $1,411.85
Sidewalk curb;complete as Linear
1460 specified Feet 50.00 48.00 -2.00 $20.00 ($40.00)
Tapered concrete 30"curb
and gutter,with 6"CABC
and grading;complete as Linear
1470 specified Feet 525.00 513.53 -11,47 $16.25 ($186.39)
4"concrete sidewalk with 3"
CABG and grading;complete Square
1500 ass ecified Feet 4,630.00 4,356.40 -273.60 $4.17 ($1,140.91)
Page 1 of 7
CONTRACT 16-16 CHANGE ORDER 41(FINAL)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE INDECRPASEIN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACTPRICE
PRICE
6"concrete sidewalk/
driveway/ramp with 3"
CABC and grading;complete Square
1510 asspecified Feet 500.00 1,225.96 725.96 $5.00 $3,629.80
Curb ramp detectable
warning field(natural/non-
painted);complete as Square
1540 specified Feet 184.00 196.00 12.00 $28.00 $336.00
Sawing existing pavement; Linear
1700 complete ass ecified Feet 230.00 234.00 4.00 $3.00 $12.00
Base aggregate dense;1-1/4!';
1801 complete asspecified Tons 6,030.00 6,126.11 96.11 $11.25 $1,081.24
3/4"open graded base;
1850 complete asspecified Tons 1,090.00 826.84 -263.16 $18.33 ($4,82392)
Tack coat;complete as
1900 specified Gallons 230.00 365.00 135.00 $4.29 $579.15
HMA Pavement Type E-1.0;
1902 complete asspecified Tons 1,020.00 1,091.37 71.37 $67.17 $4,793.92
4"asphaltic surface with 6"
CABC and grading;complete Square
1916 asspecified Yards 300.00 299.03 -0.97 $29.54 ($28.65)
Parking;handicap,and
crosswalk epoxy striping Lump
1921 complete asspecified Sum 1.00 1.00 $9,460.00
Furnish and install asphaltic
material permeable
pavement;complete as Square
1925 Ispecified. Yards 480.00 0.00 -480.00 $32.32 1 ($15,513.60)
Furnish and install 6"storm Linear
2000A sewer;complete asspecified Feet 190.00 204.00 14.00 $28.24 $395.36
Furnish and install 6"
perforated storm sewer; Linear
2000E complete asspecified Feet 174.00 171.00 -3.00 $6.12 ($18.36)
Furnish and install 12"RCP
Class III storm sewer; Linear
2004 complete asspecified Feet 86.00 82.00 -4.00 $56.20 ($224.80)
Furnish and install 48"storm
sewer;complete as specified Linear
2030 Feet 346.00 330.00 -16.00 $160.00 ($2,560.00)
Furnish and install 48"RCP
Class III storm sewer, Linear
2031 complete asspecified Feet 157.00 1 159.00 2.00 $163R0 1 $326.00
Furnish and install 48"RCP
Class III apron endwall with
joint ties;complete as
2149 specified Each 1.00 1.00 $11,314.00
Furnish and install standard
storm sewer manhole(7'
diameter);complete as Vertical
2204 ]specified Feet 28.00 1 24.17 -3.83 $575.00 ($2,202.25)
Furnish and install Type 1
2236 inlet;complete asspecified Each 6.00 6.00 $1,511.00
Page 2 of 7
CONTRACT 16-16 CHANGE ORDER#1(FINAL)
INCREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT DECREASE IN
PRICE
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CO RICECT CONTRACTPRICE
Furnish and install 6"storm
server lateral;complete as Linear
2400 specified Feet 1 94.00 106.50 12.50 $28.24 $353.00
Furnish and install storm
sewer marker balls;complete
2404 ass ecified Each 13.00 6.00 -7.00 $32.00 ($224.00)
Furnish;install;maintain,
and remove Type D inlet
protection;complete as
2506 specified Each 1 10.00 12.00 2.00 $76.00 $152.00
Sediment removal-Type D
modified inlet protection;
2510 complete asspecified Each I0.00 0.00 -10.00 $65.00 ($650.00)
Furnish;install;maintain;
and remove stone tracking
2512 ad;complete ass ecified Each 2,00 0.00 -2.00 $0.01 ($0.02)
Furnish;install;maintain;
and remove silt fence; Linear
2514 complete asspecified Feet 1,400.00 991.00 -409.00 $1.50 ($613,50)
Furnish;install;maintain;
and remove stone bag;
2516 complete asspecified Each 18.00 28.00 10.00 $12,00 $120.00
Furnish;install;maintain;
and remove turbidity barrier;
complete as specified
2526 Each 1.00 1.00 1 $3,600.00
Furnish and install topsoil 6'
depth;complete as specified Square
2600 Yards 3,020.00 2,416.83 -603.17 $4.40 ($2,653.95)
Furnish and install turf grass; quare
2620 complete asspecified Yards 3,020.00 2,416.83 -603.17 $0.18 ($108.57)
Furnish and install annual
cover crop;complete as Square
2624 specified Yards 3,020.00 0.00 -3,020.00 $0.14 ($422.80)
Furnish and install trees;
2626 complete asspecified Each 11.00 11.00 $390.00
Furnish and install Class I;
Urban;Type A erosion
control mat,complete as Square
2632 specified Yards 3,020.00 2,416.83 -603.17 1 $1.05 ($633.33)
Furnish and install heavy rip-
rap with filter fabric; Square
2648 com ]etc ass ecified Yards 12.00 1 91.00 79.00 $58.00 $4,582.00
Abandon 8"-12"storm Linear
2800 sewer;complete asspecified Feet 24.00 24.00 $12.50
Remove 30"and smaller
storm sewer;complete as Linear
2804 specified Feet 32.00 32.00 $8.60
Mobilization,complete as Lump
2900 specified Sum 2.00 2.00 $10,000.00
Strip and stockpile topsoil; Square
2902 complete asspecified Yards 910.00 0.00 -910.00 $2.50 ($2,275.00}
Page 3 of 7
CONTRACT 16-16 CHANGE ORDER Irl(FINAL)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASEINDF.CREASEIN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE
PRICE
Clear trees;complete as Lump
2906 specified Sum 2.00 2.00 $50.00
Grub stumps;complete as Lump
2912 specified Sum 2.00 2,00 $5.00
Excavation special(storm);
2950 complete asspecified Tons 1,400.00 2,591.13 1,191.13 $6.75 $8,040.13
Furnish and install bio-filter
plantings,complete as Lump
2998 specified Sum 1.00 1.00 $13,500.00
Furnish and install bio-filters
(includes excavation;all
materials;piping;manhole,
cleanout;and liner;complete Lump
2998 lasspecified Sum 1.00 1,00 $45,000.00
Furnish and install 8"ductile
iron water main(relay)with
polywrap;complete as Linear
4004 specified Feet 35.00 60.50 25.50 $87.00 $2,218.50
Furnish and install 8"45
degree water main bend;
4237 complete asspecified Each 4.00 1 4.00 $956.00
Furnish and install 8"water
main gate valve;complete as
4402 specified Each 2.00 1.00 -1.00 $1,684.00 ($1,684.00)
Furnish and install 18"steel
water main casing pipe; Linear
4726 complete asspecified Feet 10.00 12.00 2.00 $168.00 $336.00
Furnish and install pull box
(steel);24"x 48",,complete as
5020 Specified Each 7.00 7.00 $650.00
Furnish and install
communication vault,30"x
5032 48';complete asspecified Each 3.00 3.00 $1,500.00
Furnish and install control
cabinet;complete as specified
5050 Each 1.00 1.00 $11,000.00
Furnish and install 1"
Schedule 40 PVC;complete Linear
5100 asspecified Feet 400.00 478.61 78.61 $4.00 $314.44
Furnish and install 2"
Schedule 40 PVC;complete Linear
5120 asspecified Feet 290.00 122.00 -168.00 $5.00 ($840.00)
Furnish and install 3"
Schedule 40 PVC;complete Linear
5130 asspecified Feet 1,340.00 1 1,157.27 -182.73 $7.00 1 ($1,279.11)
Install single head fixture,
"City Supplied,"complete as
5400 specified Each 6.00 7,00 1.00 $450.00 $450.00
Furnish and install Type 2
Modified Base;complete as
5508 specified Each 7.00 7.00 $2,750.00
Page 4 of 7
CONTRACT 16-16 CHANGE ORDER#1(FINAL)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE.
PRICE
Common Excavation
(includes removal of existing
pavement;base materials;
and soils to proposed design
elevations for all areas);
complete as specified Cubic
A2-1201 Yards 410.00 295.70 -114.30 $17.95 ($2,051.69)
4"asphaltic surface with 6"
CABC and grading;complete Square
A2-1916 asspecified Yards 1,250.00 1,120.50 -129.50 $27.59 ($3,572.91)
Fumish;install;maintain;
and remove Type D inlet
protection;complete as
A2-2506 specified Each 4.00 0.00 -4.00 $80.00 ($320.00)
Furnish;install;maintain;
and remove stone tracking
A2-2512 ad;com Tete asspecified Each 1.00 0.00 -1.00 $0.01 ($0.01)
Furnish;install;maintain;
and remove silt fence; Linear
A2-2514 complete asspecified Feet 700.00 412.00 -288.00 $1.50 ($432.00)
Furnish and install topsoil 6"
depth;complete as specified Square
A2-2600 Yards 2,500.00 865.05 -1,634.95 $4.40 ($7,193.78)
Furnish and install turf grass; quare
A2-2620 1comolete asspecified Yards 2,500.00 865.05 -1,634.95 $0.18 ($294.29)
Furnish and install annual
cover crop,complete as Square
A2-2624 specified Yards 2,500.00 0.00 -2,500.00 $0.14 ($350.00)
Furnish and install Class 1,
Urban;Type A erosion
control mat;complete as Square
A2-2632 ]specified Yards 2,500.00 865.05 -1,634.95 $1.05 ($1,716.70)
SECTION I-(BID ITEMS 1023-A2-2632)-SUBTOTAL $55,911.24 ($60,868.14)
SECTION I-ADDITIONAL WORK REQUIRED; CO#1
ITEM CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN
NUMBER DESCRIPTION UNIT QUANTITY CONTRACT
Q QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACT PRICE
Furnish and install dumpster
enclosure;complete as Lump
1-1250 specified Sum 0.00 1.00 1.00 $5,150.00 $51150.00
Adjust manholes and inlets
1-1360 (CB-3);complete as specified Each 0.00 6.00 6.00 $450.00 $2,700.00
Drilled No.4 sidewalk tie-
bars-deformed,epoxy coated
1-1560 (CB-8);complete as specified Each 0.00 11.00 11.00 $11.00 $121.00
Grubbing(CB-4);complete as Inch
1-2910 specified Diameter 0.00 144.00 144.00
$6.50 $936.00
Page 5 of 7
CON'T'RACT 16-16 CHANGE ORDER#1(FINAL)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CO,NFRACT CONTRACT PRICE
PRICE
Furnish and install sanitary
sewer external manhole
chimney seal(CB-3);
1-3114 complete asspecified Each 0.00 1 1.00 1.00 $550.00 $550.00
Furnish and install sanitary
sewer external chimney
extension seal(CB-3);
1-3116 complete as specified Each 0.00 1.00 1.00 $450.00 $450.00
Furnish/install PAVEDRAIN
Permeable Pavement System
(includes 24"width
reinforced concrete perimeter
beam and pavement base
geogrid)-Construction
Bulletin#1(CB-1);complete Lump
1-10000 as specified Sum 0.00 1.00 1.00 $40,746.24 $40,746.24
Furnish and install sanitary
manhole cleanout casting(CI3 Lump
1-10001 3);complete as specified Sum 0.00 0.84 0.84 $995.00 $835.80
Common dxcavation
(includes removal of existing
pavement;base materials;
and soils to proposed design
elevations for all areas)(CB- Cubic
1-A3-1201 2);complete as specified Yards 0,00 157.80 157.80 $17.95 $2,832.51
4"asphaltic surface with 6"
CABC and grading(CB-2); Square
1-A3-1916 complete asspecified Yards 0.00 473.30 473.30 $27.59 $13,058.35
Furnish;install;maintain,
and remove Type D inlet
protection(CB-2);complete
1-A3-2506 asspecified Each 0.00 0.00 $80.00
Furnish;install;maintain;
and remove stone tracking
pad(CB-2);complete as
1-A3-2512 specified Each 0.00 0.00 1 $0.01
Furnish;install;maintain;
and remove 20"diameter
sediment logs(CB-2); Linear
1-A3-2520 complete asspecified Feet 0.00 192.00 192.00 $13.31 $2,555.52
Furnish and install topsoil 6"
depth(CB-2);complete as Square
1-A3-2600 Ispecified Yards 0.00 1 472.00 472.00 $4.40 $2,076.80
Furnish and install turf grass Square
1-A3-2620 (CB-2),complete as specified Yards 0.00 472.00 472.00 $0.18 $84.96
Furnish and install annual
cover crop(C13-2);complete Square
1-A3-2624 asspecified Yards 0.00 0.00 $0.14
Page 6 of 7
------ --------------
-- -- -
CONTRACT 16-16 CHANGE ORDER 91(FINAL)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT
QUANTITY QUANTITIES INCREASE DECREASE PRICE CON7RACTPRICE
PRICE
Fumish and install Class 1;
Urban;Type A erosion
control mat(C13-2);complete Square
1-A3-2632 as s ecified Yards 1 0.00 1 472,00 472.00 $1.05 $495.60
Mobilization(CB-2); Lump
1-A3-2900 complete ass ecified Sum 0.00 1.00 1.00
$2,800,00 $2,800.00
SECTION I-(ADDITIONAL WORK REQUIRED; CO ill ITEMS 1250-A3-2900)-SUBTOTAL $75,392.78 $0.00
NET INCREASE TO: SECTION I $70,435.88
NET INCREASE TO SECTION 1 $131,304.02
NET DECREASE TO SECTION 1 ($60,869.14)
NET INCREASE TO CONTRACT: $70,435.88
Page 7 of 7