HomeMy WebLinkAboutDorner, Inc., & Oshkosh/ Change Order No. 2, Contract 14-10 f City of Oshkosh October 11, 2016 Mr, Todd Dorner Dorner, Inc. PO Box 129 Luxemburg, WI 54217 RE: Change Order No. 2 (Final) Contract 14-10 Dear Mr. Dorner: Enclosed is an executed copy of Change Order No. 2 (Final) between the City of Oshkosh and Dorner, Inc. regarding the abovementioned project. If you have any questions,please call our office at(920)236-5065. Sincerely, Pmes Rabe, P.E,,"CPESC Director of Public Works JRR/t1t Enclosure: Change Order No. 2 (Final) cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) I:\Enginceringk2014 COUTPAC75%14-10 SW Ind Prk Exp(TID B23)Ph 3&4 Util\Project 1n(onnaiion\Contract Wo%Change Orders\14-10 Executed CO 02(Final)Ltr 10-11-16.docx Page I OE I City Hall,215 Church Avenue P.O.Box 1 130 Oshkosh,W1 54903-1130 http://www.ci,oshkosh.wi.us TO: DORMER, INC. CHANGE;ORDER#2(FINAL) PO BOX 129 DATE: AUGUST 15,2016 LUXEMBURG,WI 54217 Your present contract with the City of Oshkosh, Contract No. 14-10,awarded October 14,2014, is hereby amended and changed as follows: NET INCREASE TO: SECTION 1-PAVING $0.00 NET INCREASE TO: SECTION 11-STORM SEWER $16,124.71 NIST INCREASE TO: SECTION III -SANITARY SEWER $0.00 NET INCREASE TO: SECTION IV-WATER MAIN $0.00 NET INCREASE TO CONTRACT $16,124.71 SECTION I SECTION Il SECTION III SECTION IV (PAVING) (STORM) (SANITARY) (WATER) TOTALS BID TOTAL $170,955.70 $2,709,645.76 $147,679.26 $378,864.00 CO#1 $10,949.11 $50,924,17 ($1,116.33) ($2,770.00),sti = . CO#2 $0.00 $16,124.71 $0.00 $0.00 ;CO 7# 47. O1'AL1=` :. . 8('904:$1 Z`776:B9 84 =$946562192: .71iS'08. g'4: .`>'; 3=481=256 : N............:.....:r..._.._,....:.,n..:.. 7..... ,:,_,._..1....4 .. ,.... . .. ,._, . ... ..,.,..,.. .. . _.. .., . .. CITY OF OSHKOSH €3Y: 70 City Mana er City Clerk Ap r ved and a pted: Co raclor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within Change Order. Comptroller Approved as form: City A CONTRACT 14-10 CHANGE ORDER 02(FINAL) SECTION I-PAVING ITEM DESCRIPTION UNIT CONIRACr INSTALLED NFT NET UNIT IA'CRFASEIN DECRl1SEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE- CONTRACTPRICE Removing pavement, square 1100 com lets asspecified Yards 113.89 113.80 $5.00 36"mountable curb and gutter,8",w[ih 6"CABG and grading,complete as Llnear 1450 sec€Fled Foot 169.10 169.10 $60.10 Saying existing pavement, Linear 1700 cam late asspecified Feel 178.90 178,90 $2.00 Base aggregate dense,I X", 1801 complete asspecified Tons 13,782.23 13 782,23 $10.71 Tack coat,complete as 1900 specified Gallons 20.00 20.00 $10.10 HMA pavement Type E-3.0, 1903 1 complete ass ecified Tons 168.72 168.72 1 $136.35 SECTION I-(BID ITEMS 1100.1903)-SUBTOTAL $0,00 $0,00 NET INCREASE TO: SECTION 1 $0.00 SECTION II-STORM SEWER ITE1f DESCRIPTION UNIT CONTRACT INSTALLED N3r NET UNIT INCREAS.EIN DI;CRI=ASEIN NUMBER QUANTITY QUANTITIES INCRFASf~ DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Mobilization,comploie as Lump 2000 specified Sum 1.00 1.00 $183,316,00 Strip and stockpile topsoil, Square 2002 complete as specified Yards 586,500.00 586,500.00 $0.25 Clear frees,complete as lump 2006 s eciried Sum 1.00 1.00 $6,565,00 Clear shrubs,complete as Lump 2008 specified Sum 1.00 1.00 $2,525,00 Grub stumps,complele as Lump 2012 specified Sum 1.00 1.00 $13,635.00 General excavation, lump 2020 complete asspecified Sum 1.00 1.00 $1,212,000.00 Construct clay finer,complete Lump 2024 ass eoirred Sum 1.00 1.00 $121,200.00 Excavation belowsubgrade- Pub[lo Improvomants, Cubic 2025A com Zeta asspecified Yards 946.00 946.00 $4.04 Excavation below subgrade- Non-Public lmprovemerite, Cubic 2026E com plate asspecified Yards 0.00 0.00 1 $4.04 Furnish and Install 16"ROP Class III storm sewer, Llnear 2044 complete asspecified Foot 479.90 479.90 $26.00 Furnish and Install 18"RCP Class III storm sewer, Linear 2050 Com late asspecified Foot 94.80 900 $28.00 Furnish and Install 24"RCP Class III storms ower, Linear 2062 complete asspecified Feet 2,449.90 2,449.90 $32,00 Furnish and Install 30"RCP Class 111 storm sewer, Linear 2074 1 complete ass eC€fled Feet 634.60 1 534.60 $43,00 Page 1 016 CONTRACT 14.10 CHANGE ORDER 02(FINAL) ITEM DESCRIPPON UNI,- 001IT11ACT 1MMIE11 NET NEr MY INCREASEIN DECH94SEIN NUMBER QUANTIFY QUANTITIES INCREASE DECREME PRICE CONTRAOTPRICR CONTRACTPRICE Furnish and install 36"RCP Class fit storm sewer, Linear 2080 complete ass eeiffad Feet 541.30 601.30 $52.00 Furnish and Install 42"RCP Class Ill storm sewer, Linear 2086 complete ass eclfied Feet 588.40 588.40 $70.00 Furnish and Install 48"RCP Class llI storm sewer, Linear 2092 complete asspecified Feat 1,489.60 1 1,489.00 $82.00 Furnish and Instal[15"RCP Class Ill apron endwall with joint ties,complete as 2302 specified Each 2.00 2.00 $947.00 Furnish and Install 18"RCP Class III apron endwall with joint ties,complete as 2304 specified Each 1.00 1.00 $1,014.00 Furnish and Install 24"RCP Class III apron endvrall with Joint ties,complete as 2308 specified Each 4.00 4.00 $1234.00 Furnish and install 48"RCP Class III apron endwaliwIth joint ties,complete as 2318 specified Each 2.00 2.00 $2,328.00 Furnish and install standard storm sewer manhole(4' dlametor),complete as Vertical 2532 specified Feat 31.14 31.14 $314.00 Furnish and Install standard storm sewer manhole(5' diameter),complete as Vertical 2534 specified Feet 87.81 87.81 $387.00 Furnish and install standard storm sewer manhole(6' diameter),complete as Vertical 2536 specified Feet 1$.56 18.55 $551.00 f=urnish and install standard storm sevrer manhole(7' diameter),complale as Veritcal 2538 specified Feat 23.03 1 23.03 $683.00 Furnish and Install standard storm sower manhole(6'x 6 Vertical 26648 box),complete ass ocifsod Feet 12.34 12.34 $863.00 Furnish and Install standard storm sewer Intel manhole(4' dlameter),complete as Vortical 2556 specified Feet 4.09 4.00 $354.00 Furnish and install standard storm sewer inlet manhole(7' dlaniater),complete as Vertical 2562 specified Feet 6.91 5.91 $774.00' Furnish and install standard storm sewer Inlet manhole(6' x 6'box),complete as Vertical 2572 s ecifled Feet 0,00 0.00 $842.00 Furnish and Install storm sewer outlet structure, 2582A I complete ass ecified Each 1.00 1 1.00 $4,404.00 Page 2 of 6 CONTRACT 14-10 CHANGE ORDER 02(FINAL) ITEM DESCR1P710N 10)r CONTRACT INSTALLED NET NET UNIT INCREASE IN DECRU'ASrsIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICI; CONTRACTPRICE Furnish and install storm sewer outlet siructure, 25828 complete asspecified t=act) 1.00 1.00 84,549.00 Furnish and Instal[storm sewer outlet structure, 25820 complete asspecified Each 1.00 1.00 $4,4201.00 Furnish and Install Type 3 Inlet(with 18"sump), 2614 complete ass eclfled Each 33.00 33.00 $1,157.00 Furnish,install,maintain,and ramove,Type D modifled inlet protection,complete as 2858 specified Rich 36.00 36.00 $91.00 SedlmenI removal-Type D modified Inlet protection, 2860 complete ass ecified Each 30100 36.00 $68.68 Furnish,install,maintain,and remove stone tracking pad, 2862 corn plate asspecified Each 1.00 1.00 $1,010.00 Furnish,Install,maintain,and remove sill:fence,complete Linear 2864 asspecified Feel 18,004.40 18 004.40 $1.44 Furnish,Install,maintain,and remove stone bag,complete 2866 ass eelfted Each 20.00 20.00 $7.58 Furnish,install,maintain,and remove ditch check, 2872 complete asspecified Each 1 62.40 1 62.00 $70.70 Install salvaged topsoil 6" Square 2902 depth,complete as specified Yards 559,667,05 551,667.95 $0.40 Install salvaged topsoil 12" Square 2906 depth,complete as specified Yards 4,700.00 4,700. $0.71 Furnish and Install wetland Square 2908 plups,complete,ass ecifled Yards 4,665.61 4,665.51 $4.04 Furnish and install native seeding(Sldeslope), Square 2910 complete ass ecifled Yards 42 294.60 42,508.80 219.20 $0.85 $182.07 Furnish and Install native seeding(Shoreline), Square 2912 cornlata ass ecifled Yards 3,382.44 3,382A4 $0.76 Furnish and Install WDOT Seed Mixture#10,complete Square 2921 ass ecifled Yards 501,485.95 501,616.25 130.30 $0,22 $28.67 Furnish and Install no-maw fescue,complete as speclfled Square 2922 Yards 41,680.92 41,835,12 154.20 $0.26 $40.09 Furnish and install Class I, Type A erosion control mat, Square 2930 complete ass ecifled Yards 90,839.42 94,338.12 498.70 $0.86 1 $428.88 Furnish and Install turf reinforcement mat system, Square 2938 com late ass ecifled Yards 4,462.24 4,482.28 $7.88 Furflish and Install medium rip-rap wish Mier fabric, square 2948 complete asspecified Yards 1 190.28 190.28 $35.35 Peg43of6 CONTRACT 14-110 CHANGE ORDER 42(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NFT NFT UNIT INCREASFIN DFOREASI~IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICI; CONTRACTPRICI= Furnish and fnslalf heavy dp- rap with filter fabric,complete Square 2948 asspecified Yards 101.95 101.95 $35.36 SECTION Il-(BID ITEMS 2000-2948)-SUBTOTAL $670.71 $0.00 SECTION 11-ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE UECRE4SE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install standard storm sewer Inlet manhole(6' diameter),complete as Vertical 12660 specified Feat 8.84 8.84 $600.00 Excavation below subg rade and restoration swale; Square 20000 complete asspecified Yards 1,400.00 1,400.00 $2,00 Excavation below subgrade and restoraffon sump pits; Square 20007 !complete asspecified Yards 278.00 278.00 1 $2.00 Cover crop;complete as Square 20002 specified Yards 160,018.00 160 018.00 $0.19 LABS soft areas,hauled off Cubic 20003 site;complete asspecified Yards 105.50 105.50 $14.35 Replace gravel In EBS areas; 20004 complete as s ecifled Tons 121.80 121.80 $17.25 Filterfabrio;complete as Square 20005 s ecifled Yards 1,456.50 1,456.50 $5.75 Furnish and Install heavy rip rap with fabric;complete as Square 20006 specified Yards 0100 293.90 293,90550.00 $14,895.00 Mobilization;complote as 20007 s eciflod Each 0.00 1.00 1.00 $750.00 $750.00 SECTION 111-(ADDITIONAL WORK REQUIRED; CO#1-(ITEMS 112560-20007)-SUBTOTAL $15,445.00 $9.00 NET INCREASE;TO: SECTION II $16,1124.71 SECTION(Il-SANITARY SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREgSE PRICE CONTRAC7PRICE CONTRACTPRICE Furnish and Install 12" sanitary sewer(new), Linear 3034 complete asspecified Feet 3,026.30 3,025,30 $28.00 Furnish and install standard sanitary sewer manhole(4` diameter),complete as Vertical 3100 s ecirled Feet 177.14 177.14 $227.00 Furnish and install external sanitary sewer manhole chimney seal,complete as 3114 s eciFled Eacli 8,00 8.00 $358.00 Remnsi(uct sanitary sewer manhole(4'dfamotor), Vertical 3122 complete asspecified Feet 27.19 27.19 $502.00 Furnish and Install sanitary sawer lateral marker balls, 3236 1 complete as seclfled j Each 11.00 1.00 $30,00 Core Into existing manhole, 3332 1 com late asspecified Fach 0.00 0.00 $2,048.00 Page 4 or 6 CONTRACT 14-14 CHANGE ORDER 42(VINAL) ITEM DESCRlPrlON UNIT CONTI ICT INSTALLED NET NET UNIT INCRFASEIN QF.CREASr1:,V NUPMBER QUANTITY QUANTI TITS INCREASE DWREASE' PRICE CONTRACTPRICE CONTRACT PRICE Closed circuit televising, linear 3700 complete as s ecifled Feet 3,026.30 3,026.30 SECTION III-(BID ITEMS 3034-3700)-SUBTOTAL $0.00 SECTION III-ADDITIONAL WORK REQUIRED: CO 41 ITEMpBSCRIPTlON UNIT CONTRACT INSTALLED NET NET UNIT INCRrASUIN 0IPCREA80•IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACrPRICE CONTRACTPRIC;r Furnish and Install 20" sanitary sewer open out casing pipes,complete as linear 13411 Ispeolfled Feet 1 20.00 1 20.00 $126.00 SECTION III-(ADDITIONAL WORK REQUIRED, CO#1-ITEM 13411)-SUBTOTAL $0.00 $0.00 NET DECREASE TO: SECTION Ill $0.00 SECTION IV-WATER.MAIN ITEM DESCRIPTION llNlr CONTRACY INSTALLED NET NET UNIT INCREASEIN DECRWaIN NUMBER QUANTITY QUANTITIES INCREASE 0F.'CRr4Sr PRICE CONrRACTPRICE CONTRACTPRICr Furnish and Install new 6" ductile iron Prater mala evith polywrap,complete as llnear 4020 s eclfled Feet 235.50 1 235.60 $34.00 Furnish and install new 10" ductile iron water main wilh polywrap,complete as Linear 4024 specified Feet 5,177.50 6,1177,50 $40.00 Furnish and Install . connections to existing 10" water mato,complete as 4062 specified Each 1.00 1,00 $1,210.00 Furnish and install 10'x 6" water maln tee,complete as 4119 specified Each 13.00 13.00 $536.00 Furnish and Install 10"11%' water main bend,complete 4220 ass ecifled Each 17.00 l 17,00 $351.00 Furnlsh and install 10"22/2' watermaln bend,complete 4229 ass ecifled Each 7,00 7.00 $343.00 Furnish and Install 611460 water maln bend,complete 4236 ass eelAed Each 22.00 22.00 $174.00 Furnish and install 10"45° water main bend,complete 4238 asspecified Each 8.00 8.00 $348.00 Furnish and install 10"x 6" water main reducer,complete 4256 ass ecifled Each 1.00 1.00 $236.00 Furnlsh and Install 6"water main gate valve,complete as 4401 s aoifled Each 14.00 14.00 $1082,00 Furnish and Install 10°water main gate valve,complete as 4403 specifled Each 13.00 13.00 $2157.00 Furnish and Insfall hydrant, 4500 complete ass eclfled Each 13.00 13.00 $3 467.00 Pag©5 are CONTRACT 14-10 CHANGE~ORDER#2(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCRFASFIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DEGRUASC: PRICE CONTRACTPRICE CONTRACTPRICE Relocate existing hydrant, 4601 complete ass eclRed Each 1.00 1.00 $633.00 Jack and bare 24"stool water main casing pips,camplete Linear 4702 ass ec€Iied Feet '111.00 111.00 $340.00 Furnish and install 24"steel wafer matt]casing pipe. Linear 4730 1 complete asspecified Feet 1 133.00 1 133.00 1 5120.00 SECTION 1V-(BID ITEMS 4020.4730)-SUBTOTAL $0.00 $0,00 NET DECREASE TO; SECTION IV $0.00 NET INCREASE;TO SECTIONS I,11,111,&IV $16,124.71 NET DECREASE TO SECTIONS 1,11,111,&IV $4.00 NET INCREASE TO CONTRACT: $16,124.71 Page 6 DIG