HomeMy WebLinkAboutJames Peterson Sons,Inc., & Oshkosh/ Change order #2, 15-01 -55 City �fArof Oshkosh October 11, 2016 Mr. Ryan Peterson James Peterson Sons, Inc. N2251 Gibson Drive Medford, WI 54451 RE: Change Order No. 2 (Final) Contract 15-01 Dear Mr, Peterson: Enclosed is an executed copy of Change Order No. 2 (Final) between the City of Oshkosh and James Peterson Sons, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, J es Rabe, P.E., CPESC irector of Public Works JF,R/Ht Enclosure: Change Order No. 2 (Final) cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) TA Engineering\2015 CONTRACTS\15-0141h&Washburn Area Uel Basin Page 1 Of 1 Const\Project_InformationlContract info\Change Orders\15-01 Executed CO#2 Lir_10-11-16.doa City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1130 htiP://www.Cl.oshkosh.wl.us TO: JAMES PETERSON SONS,INC. CHANGE ORDER 92(FINAL) UTILITY DIVISION DATE:AUGUST 30,2016 N2251 GIBSON DRIVE MEDFORD,WI 54451 Your present contract with the City of Oshkosh,Contract No.15.01,awarded July 14,2015,is hereby amended and changed as follows: NET INCREASE TO: SECTION I-PAVING $0.00 NET INCREASE TO; SECTION 11-STORM SEWER $44,630.49 NET INCREASE TO: SECTION Ill-SANITARY SEWER $0.00 NET INCREASE TO: SECTION IV-WATER MAIN , $0.00 NET INCREASE TO CONTRACT $44,630.49 SECTION I SECTION Il SECTION III SECTION IV (PAVING) (STORM) (SANITARY) (WATER) TOTALS BID TOTAL $292,765.50 $2,142,702.50 $5,000.00 $88,324.00 $2,528,792,00 CO#1 $33,318.43 ($74,391.91) $553.00 $37,927.60 ($2,592 88) CO 12 $0.00 $44,630.49 $0.00 $0.00 $44,630.49.. CONTRACT TOTAI. $326,083.93 $2,112,9.41x18 $5x553.00 $126,251;60 $2,570,829.61' CITY OF OSHKOSH BY: �,-- City Manager — <.... D City Clerk Approved and acc Contractor �•�.,�� I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,under the within Change Order, Comptroller Approved as t 'nn; City AlLrneo CONTRACT 75.01 CHANGE ORDER 12(FINAL) SECTION I-PAVING ITEM DESCRIPTION UNIT CONTRACT INSTALM) NET NET UNIT INCREA$E1N DECREASE IN NUAIREk QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Removing pavement; Square 1100 complete asspecified Yards 3,339.50 3,339.50 $3.45 Removing concrete and asphalt sldewalk and driveway;complete as Square 1120 Specified Feet 1,613.30 1,613.30 $5.00 7'concrete pavement;with 5" CABC and grading;complete mare 1301 ass ecified Yards 1,297.00 1,297.00 $68.00 8"concrete pavement;Willi 6" CABC and grading complete Square 1311 ass eciffed Yards 951.00 951.00 $71.75 Pavement ties;complete as 1350 specified Each 339.00 339.00 $8.00 Adjust manholes and Inlets; 1360 complete asspecified Each 11.00 11,00 $519.00 Turf restoration;complete as Square 1370 specified Yards 2,699.90 2,699.90 $1.10 18"curb and gutter;7"1 with 5"CABC and grading; Linear 1420 complete as secified Feel 1 548.80 548.80 $26.50 30"curb and gutter;8";With 6"CABC and grading; Linear 1442 complete as scified Feet 570.50 570.50 $28.75 4"concrete sidewalk with 3" CAAC and grading;complete Square 1500 asspecified Feet 872,70 872.70 $5.90 6"concrete sidewalk/ driveway/ramp with 3" CAEC and grading;complete Square 1510 asspecified Feet 534.49 534.49 $7.90 Curb ramp detectable warning field(natural/non- painted);complete as Square 1540 specified Feet 32.00 32.00 $30.00 No.4 reinforcing rods- deformed;epoxycoated; Linear 1550 complete asspecified Feet 351.00 351.00 $1.10 Drilled No.4 sidewalk tie bars•deformed;epoxy- 1560 coated;complete ass eciffed Each 28.00 28.00 $5.00 Sawing existing pavement; Linear 1700 complete asspecified Feet 1,547.00 1,547.00 $2.25 4"asphaltic pavement with 10"CABC and grading; Square 1` complete as secified Yards 1 806.60 806.60 $46.75 Page t of a CONTRACT 15.01 CHANGE ORDER 92(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTAU.ED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE pavement markings; Lump 1921 complete ass ecified Sum 0.40 0.00 82,500.00 SECTION I-(IIID ITEMS 1100-1921)-SUBTOTAL $0.00 $0.40 SECTION I•ADDITIONAL WORK REQUIRED; CO 11 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 7"concrete pavement;Kase In place and grading;complete Square 11300 asspecified Yards 455.06 455.06 $39.17 8"concrete pavement doweled;with 6"CAIIC and grading;complete as Square 11314A specified Yards 465.20 465.20 $76.70 Replace existing properly monuments;complete as 11652 specified Each 1.00 1.00 $11500.00 111/4'drilled dowel bars; 11999 cont fele asspecified Each 44.00 44.00 $15.40 SECTION I•(ADDITIONAL WORK REQUIRED; CO 91 ITEMS 11300.11999)•SUBTOTAL $0.00 $0.00 NET INCREASE TO: SECTION 1 $0.00 SECTION If-STORM SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASGIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Mobilization;complete as Lump 2000 specified Sutra 1.00 1.00 $105,500.00 Strip and stockpile topsoll; Square 2002 1completeasspecified Yards 47,372.00 47,372.00 $0.45 Clear trees;complete as Lump 2006 Specified Sinn 1.00 1.00 $8,000.00 Clear shrubs;complete as Lump 2008 specified Sum 1.00 1.00 $5.900.00 Grub stumps;complete as Lump 2012 specified Sum 1.00 1.00 $5,000.00 General excavation;complete Lump 2020 asspecified Sum SAO 1.00 $1,015,000.00 Import clay material; Cubic 2022 com leteas specified Yards 0.00 0.00 $8.27 Construct clay liner;complete Lump 2024 asspecified Sum 1.00 1.00 $123,000.00 Excavation below subgrade- Detention Basin complete as Cubic 2026 Ispecified Yards 96.30 j 96.30 $10.00 Furnish and install backflow preventer;complete as 2035 specified Each 5.00 5.00 #2,500.00 Page 2 of CONTRACT 15.01 CHANGE ORDER 12(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTAUED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREME DECREASE PRICE CONTRACTFRXE CONTRACTPRfCE Furnish and install 12"storm Linear 2036 sewer;Coco tete as specified Feet 426.00 426.00 $45.60 Furnish and Instal 124"storm Linear 2060 sewer;com lete as specified Feet 730.50 730.50 1 $118.00 Furnish and Instal 148"storm Linear 20" sewer;complete as spedfled Feet 32.00 32.00 $208.00 Furnish and Install 60"slorm Liniear 2102 sewer;com tete as specified Feet 392.00 392.00 $254.00 Furnish and Instal 5'x 8'box culvert storm sewer, Linear 2188 complete as specified Feet F 260,00 260.00 $517.50 Furnish and Install 12"RCP Class til apron endwall With Joint lies;complete as 2300 specified Bach 5.00 5.00 $957.00 Furnish and Install 24"RCP Class III apron end►valt Willi joint lies;complete as 2308 specified Each 1.00 1.00 $2,070.00 Furnish and Install 5'x 8'box culvert end section with joint 2376 ties;complete asspecified Gach 1.00 1.00 $40,000.00 Furnish and Install standard storm sewer manhole(4' diameter);complete as Vertical 2532 specified Feet 19.42 19.42 $276.00 Furnish and install standard storm sewer manhole(5' diameter);complete as Vertical 2534 specified Feet 19.00 19.00 $428.00 Furnish and Install standard storm sewer manhole(7' diameter);complete as Vertical 2538 specified Feet 6.75 6.75 $710.00 Furnish and install standard storm sewer manhole(8' diameter);complete as Vertical 2540 specified Feet 14.87 14.87 $886.40 Furnish and install standard storm sewer manhole(9' diameter);complete as Vertical 2542 specified Feet 6.67 6.67 $1,514.00 Furnish and Install standard storm sewer inlet manhole(4' diameter);complete as Vertical 2556 specified Feet 10.10 10.10 $482.00 Furnish and install storm sewer junction chamber; 2580 complete asspecified Each 1.00 1.00 $34,265.00 Furnish and install storm sewer outlet structure, 2582 complete as specified Each 1.00 1.00 $17,700.06 Furnish and Install Type i 2612 inlet,complete ass ecified Each 5.00 5.00 $1,493.00 Page 3 of 8 CONTRACT 15-01 CHANGE ORDER 12(FINAL) ITEM CONTRACT 1NSTAWD NET NET UNIT INCREASEIN DECK€ASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and Install Type 3 Inlet(with 18"sump); 2614 complete as Specified Each 6.00 6.00 $1,815.00 Connect to existing storm sewer main;complete as 2800 specified Each 4.00 4.00 $584.00 Abandon 15"and larger storm sewer;complete as Linear 2822 specified Feet 435.00 435.00 $43.00 Remove 30"and smaller storm sewer)complete as Linear 2824 specified Feet 23.00 23.00 $10.00 Remove storm sewer manholes and Inlets, 2832 complete asspecified Each 2.00 2.00 $500.00 Furnish;install;maintain; And remove Type D modified Inlet protection;complete as 2858 specified Each 25.00 25.00 $150.00 Sediment removal-Type D modified Inlet protection; 2860 complete ass ecified Each 0.00 0.00 $25.00 Furnish;install;maintain; and remove stone tracking 2862 ad;complete ass ecified Each 3.00 3.00 $3,500.00 Furnish;install;maintain; and remove silt fence; Linear 2864 complete as specified Feet 3,763.00 3,763.00 $2.00 Furnish;install;maintain; and remove ditch check; 2872 complete as specified Tach 7.00 7.00 $250.00 Install salvaged topsoil G Squate 2402 depth,complete asspecified Yards 35,275.31 35,275.31 $0.50 Install salvaged topsoil 12" Square 2906 de lh;complete asspecified Yards 2,513.40 2,513.40 $1.50 Furnish and Install Welland Square 29M plugs;complete asspecified Yards 0.00 3,257.70 3,257.70 1 $13.70 $44,630.49 Furnish and install native seeding;complele as Square 2910 specified Yards 13,994.50 13,994.50 $1.25 Furnish and Install native seeding;complete as Square 2912 specified Yards 11,980.75 11,980.75 $1.25 Furnish and install no-mow Square 2922 fescue;complete asspecified Yards 8,555.76 8,555.76 $0.60 Furnish and install bees; 2926 complete as specified Each 8.00 8.00 $595.00 Furnish and Install shrubs; 2928 com lele asspecified Each 65.00 65.00 $250.00 Furnish and install Class 1; Type A erosion control mat; Square 2930 1complele as specified Yards 1 34,530.99 1 34,530.99 1 1 $1.00 Page 4of8 CONTRACT 15.01 CHANGE ORDER 12(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install turf reinforcement mat system; Square 2438 complete as s ecified Yards 0.00 0.00 $17.00 Furnish and install medium rip-tap with filler fabric; Square 2946 complete asspecified Yards 218.50 218.50 $3350 Furnish and install heavy rip- rap with filter fabric; Square 2948 complete asspecified Yards 239.50 239.50 $37.50 Haut and stockpile clay at Aviation Business Park, Leunp A-2025 complete asspecified Sum 1.00 1.00 $35,000.00 SECTION II-(BID ITEMS 2000•A•2025)-SUBTOTAL $44,630.49 $0.00 SECTION 11.ADDITIONAL WORK REQUIRED; CO 11 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUAIBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRfCE CONTRACTPRICE Furnish and install 6'storm sewer lateral;complete as Linear 12280 specified Feet 86.00 86.00 $94.40 Furnish and Install storm sewer marker balls;complete 12284 asspecified Each 5.00 5.00 $50.00 Furnish and Install storm sewer clay dams;complete as 12286 specified Each 1 2.00 2.00 1 $750.00 Connect to existing storm sewer main;complete as 128W specified rich 2.00 2.00 $760.00 Connect to existing storm sewer lateral;complete as 12802 specified Each 1.00 1.00 $276.00 Furnish and install annual cover crop;complete as Square 12924 specified Yards 48,328.32 48,328.32 $0.13 Furnish and install box of biodegradable stakes(C.D. 12996 17),complete ass ecified Each 17.00 17.00 $114.35 Connect to inlet structure; 12997 complete asspecified Each 1.00 1.00 r$2,45:210,51101Furnish and install cocouuut fiber-reinforced matting; Square 12998 com lefeass ecified Yards 824.10 824.10 .5 Page 5 of 8 CONTRACT 15.01 CHANGE ORDER 12(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPluce CONTRACT!'RICE Concrete eaplwater stop outlet structure$-I;complete 12999 ass cified Each 1.00 1.00 $1,419A8 SECTION Il-(ADDITIONAL WORK REQUIRED. CO 11-(ITEMS 12280-12999)-SUBTOTAL $9.00 $0.00 NET INCREASE TO: SECTION 11 $44,630.49 SECTION III-SANITARY SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPI?fCE Furnish and install 4'16" sanitary server lateral(relay); Linear 3234 complete as s eeif[ed Feet 27.50 27.50 $60.00 Furnish And install sanitary sewer lateral lnartcer balls; 3236 complete as secified Each 4.00 4,00 $50.00 Furnish and Install clay 3238 dams;complete as specified Each 1.00 1.00 $750.00 Furnish and Install connection to existing 10" 3302 mains;com tele ass cified Each 0,00 0.00 $750.00 Furnish and Install 10" sans la ry sewer open tte casing pipes,complete as Linear 3404 specified reet 20.00 20.00 $100.00 SECTION III-(BID ITEMS 3234-3404)-SUBTOTAL $0.00 $0.00 SECTION Ili-ADDITIONAL WORK REQUIRED; CO 01 iTEl1i DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT 1YCREA$EIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACrPRICE CaVTRACTPRICE Furnish and Install external sanitary sewer manhole chimney seal:complete as 13114 specified Each 1 2.00 1 2.00 1 1 1 $476.50 SECTION III-(ADDITIONAL WORK REQUIRED: CO 91+ITEMS 30000-30003)-SUBTOTAL $0.00 $0.00 NET INCREASE TO. SECTION 111 $0,00 SECTION IV-WATER MAIN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEW NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and Install 8"ductile lron water main(relay)with pofywrap;complete as Linear 4004 specified Feet 67,00 1 67.00 1 1 1 $124.00 Page 6 of 8 CONTRACT 15.01 CHANGE ORDER 82(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREAS£IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRfCE CONTRACTPRICE Furnish and install 16" ductile iron water main (relay)with polywrap; Linear 4010 complete as scified Feet 30.00 30.00 $243.00 Furnish and Install 2"water service(relay);complete as Linear 4040 specified Feet 153.00 153.00 $123.00 Furnish and Install water service clay dams;complete 4055 as specified Each 3.00 3.00 $750.00 Furnish and install connections to existing 8" water main;complete as 4060 specified Each 2.00 2.00 $1,983.00 Furnish and install connections to existing 10" water main;complete as 4062 specified Each 0.00 0.00 $2,089.00 Furnish and Install connections to existing 16" Water main;complete as 4066 specified Each 2.00 2.00 $3,247.00 Furnish and install 8"45 degree water main bend; 4237 complete as scified Each 5.00 5.00 $290.00 Furnish And Install 16"45 degree water main mend; 4240 complete a$6 C)fled Each 4.00 4.W $1,320.00 Furnish and Install 16"open right ductile line stops; 4499 cam fete as Specified Each 2.00 2.00 $19,358.00 SECTION IV•(BID ITEMS 4004.4499)•SUBTOTAL $0.00 $0.00 SECTION]V•ADDITIONAL WORK REQUIRED; CO 01 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT 1NCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTNUCE Furnish and Install 1-1/4" corporation and stop box; 14050 complete ass cified Each 4.00 4.00 $680.00 Furnish and Install 8"x 6' water main tee;complete as 14130 specified Each 1.00 1.00 $605.00 Cut and cap existing 8"water 14354 main;coni tete asspecified Each 1.00 1.00 $630.W Furnish and Install 6"water 14401 main;complete ass ecified Each 1.00 1.00 $1,953.00 Furnish and install 8"water main gate valve;complete as 14402 s ecified Each 1.00 ].QD $2,530.00 page 7 of s CONTRACTIS•01 C14ANGE ORDER 02(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTACUED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE; PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install W water main gate valve;complete as 14405 specified Each 2.00 2.00 $8,764.30 Furnish and install hydrant; 14500 complete asspecified Each ].00 I.00 $7,712.00 SECTION IV•(ADDITIONAL WORI<REQUIRED; CO 81 ITEMS 14050.14500)•SUBTOTAL $0.00 $0.00 NETINCREASETOt SECTION IV $0.00 NET INCREASE TO SECTIONS 1,11,III,&IV $44,630.49 NET DECREASE TO SECTIONS L 11,III,&IV $0.00 NRT INCREASE TO CONTRACTi $44,630.99 page 8 of 8