Loading...
HomeMy WebLinkAboutPTS Contractors, Inc., & Oshkosh/Change Order #1,16-05 lz6s 4- City of Oshkosh October 11, 2016 Mr. Mark Schleis PTS Contractors, Inc. 4075 Eaton Road Green Bay, WI 54311 RE: Change Order No. 1 Contract 16-05 Dear Mr. Schleis: Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and PTS Contractors, Inc. regarding the abovementioned project. If you have any questions, please call our office at(920)236-5065. Sincerely, J es Rabe, P.E., CPESC / `i irector of Public Works JER/tlt Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) IA Engineering`2016 CONTRACT5116-05 Conc Paving&Util\Pro)ect_InformationI Contract Info\Change gage 1 Of 7 OrdersM-05 Executed CO N1 Ltr 10-11.16.dm City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1130 http://www.cl,oshkosh.wi.us r , TO: PTS CONTRACTORS, INC, CHANGE ORDER#1 4075 EATON ROAD DATE: SEPTEMBER 15,2016 GREEN BAY,WI 54311 Your present contract with the City of Oshkosh, Contract No. 16-05, awarded March 22, 2016, is hereby amended and changed as follows: NET INCREASE TO: SECTION I- PAVING $7,808.00 NET INCREASE TO: SECTION 11 -STORM SEWER $15,410.09 NET INCREASE TO CONTRACT $23,218.09 SECTION I SECTION II SECTION III SECTION IV (PAVING) (STORM) (SANITARY) (WATER) TOTALS SID TOTAL $1,113,058.55 $559,917.11 $595,669.04 $477,223,00 $2,745,867.70 CO#1 $7,808.00 $15,410.09 $23,218.09 CONTRACT TOTAL $1,120,866.55 $575,327.20 $595,669.04 $477,223.00 $2,769,085.79 CITY OF OSHKOSH BY: 00, City Manager [B` City Clerk ✓////F Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within Change Order. Comptroller Approved as o orm: City ktom4yj CONTRACT 1605 CHANGE ORDER#1 SECTION I-ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Removing pavement; Square 1-1100 complete asspecified Yards 0,00 110.00 110.00 $15.00 $1,650.00 Sawing existing pavement; Linear 1-1700 !Complete asSpecified Feet 1 0.00 400.00 400.00 $0.01 $4,00 Took coat;complete as 1-1900 specified Gallons 0.00 8.00 8.00 $13.00 $104,00 6"asphaltic pavement with 10E CABG and grading; Square 1-1905 complete asspecified Yards 0.00 110.00 110.00 $55.00 $6,050.00 SECTION I-(ADDITIONAL WORK REQUIRED: CO#1 ITEMS 1-1100.1-1906)•SUBTOTAL $7,808.00 $0.00 NET INCREASE TO; SECTION 1 $7,808.00 SECTION fl-ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and inslalf 15"storm Linear 1-2006 sewer;complete as specified Feel 0.00 165.00 165.00 $70.00 $11,550.00 Furnish;install;maintain;and remove Type D mondiried inlet protection;complete as 1-2508 specified Each 0.00 9.00 9.00 $40.00 $360.00 Sediment removal-Type D modified inlet protection; 1-2810 complete as specified Each 0,00 9.00 9.00 $0.01 $0.09 Connect to existing storm sewer manhole;complete as 1-2856 specified Each 0,00 2,00 2.00 $250.00 $500.00 Mobilization;complete as 1-2900 specified Each 0.00 1.00 1.00 $3,000.00 1 $3,000,00 SECTION 11-(ADDITIONAL WORK REQUIRED: CO 41 -(ITEMS 1-2006-1-2900)•SUBTOTAL $18,410.09 $0.00 NET INCREASE TO: SECTION II $16,410.09 NET INCREASE TO SECTIONS I,&II $23,218.09 NET INCREASE TO CONTRACT: $23,218.09 Page i or 1