Loading...
HomeMy WebLinkAbout12. 17-361 JULY 25, 2017 17-361 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD SID FOR PUBLIC WORKS CONTRACT NO. 17-19 VINTON CONSTRUCTION COMPANY, INC. FOR AVIATION BUSINESS PARK WATER MAIN LOOP ($1,598,113.98) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for improvements for Aviation Business Park Water Main Loop; and WHEREAS,upon the opening and tabulation of bids,it appears that the following is the most advantageous bid: VINTON CONSTRUCTION COMPANY, INC. PO Box 1987 Manitowoc, WI 54221-1987 Total Bid: $1,598,113.98 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same,all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 541-1810-1799-00000 Water Utility— Construction in Progress 317-0410-7480-03303 Special Assessments Fund —Water 551-1910-1799-00000 Sewer Utility— Construction in Progress City of� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the ComxilM Council FROM: James Rabe, Director of Public Works DATE: July 20, 2017 RE: Award Bid for Public Works Contract No. 17-19 Aviation Business Park Water Main Loop Vinton Construction Company, Inc. / ($1,598,113.98) BACKGROUND The purpose of this project is to install specific segments of water main along the project route. A sanitary sewer crossing of Interstate Highway 41 will also be constructed as a part of this project. ANALYSIS Engineering staff reviewed the nine bids received. The low bid was received from Vinton Construction Company, Inc. of Manitowoc, Wisconsin. The total bid amount is $1,598,113.98. FISCAL IMPACT Funding for the Water Main portion of the project is included in the 2016 Capital Improvement Program (CIP). The sanitary sewer funds are from projects in the 2017 CIP that came in under budget. Following is a summary of the available funds and the construction costs, including engineering fees. Special assessments will be levied to adjoining property owners per the City's Special Assessment Policy. CIP Section CIP Funds Budgeted Construction Costs with Engr Sanitary Sewer $126,500 $126,496 Water Main $1,650,000 $1,618,836 Totals $1,776,500 $1,745,333 RECOMMENDATIONS I recommend award to the low bidder, Vinton Construction Company, Inc. in the amount of $1,598,113.98. Approved: Mark A. Rohloff City Manager JER/tlt I: \ Engineering\ 2017 CONTRACTS \ 17-19 Aviation W tr Mn \ Project -Information \ Correspondence \ Memo \ 17-19 Memo for Bid Award_7-20-17.docx Contract 17-19 - Aviation Business Park Water Main Loop (#5217311) Owner: Oshkosh, City of Solicitor: Oshkosh, City of Bid Opening: 07/18/201710:00 AM CDT Page 1 of 9 7/18/2017 Vinton Construction Company David Tenor Corporation PFS Contractors, Inc Advance Construction Inc. PO Box 1987 Manitowoc, WI 54221.1987 Section Title Item Code Item Description U01M Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Section 1 $1,598,113.98 $1,598,880.30 $1,644,907.40 $1,649,090.02 Clearing: complete as 1010 specified Stations 3.80 $986.00 $3,746.80 $750.00 $2,850.00 $1,450.00 $5,510.00 $600.00 $2,280.00 Grubbing; complete as 1020 1 specified Stations 3.80 $986.00 $3,746.80 $750.00 $2,850.00 $1,450.00 $5,510.00 $600.00 $2,280.00 Removing pavement, 1100 complete as specified ware Yards 790.00 $2.50 $1,975.00 $3.00 $2,370.00 $3.50 $2,765.00 $5.00 $3,950.00 Removing concrete and asphalt sidewalk and driveway; complete as 1120 specified Square Feet 240.00 $0.80 $192.00 $0.50 $120.00 $2.30 $552.00 $0.80 $192.00 Unclassified excavation; 1200 complete asspecified Cubic Yards 219.00 $16.50 $3,613.50 $12.00 $2,628.00 $11.60 $2,540.40 $9.00 $1,971.00 Restore gravel driveway/apron; complete as 1372 specified #are Yards 150.00 $4.00 %00.00 $18.00 $2,700.00 $8.20 $1,230.00 $7.00 $1,050.00 Sawing existing pavement; 1700 complete as specified Linear Feet 905.00 $3.00 $2,715.00 $2.00 $1,810.00 $1.78 $1,610.90 $2.00 $1,810.00 Tack coal-, complete as 1900 specified Gallons 56.00 $5.05 $282.80 $3.00 $168.00 $5.10 $285.60 $5.00 $280.00 5" asphaltic pavement with 10" CABC and grading: 1905 complete as specified Square Yards 790.00 $44.65 $35,273.50 $41.20 $32,548.00 $45.00 $35,550.00 $46.25 $36,537.50 4" asphaltic surface with 6" CABC and grading; complete 1916 asspecified uare Yards 240.00 $48.14 $11,553.60 $41.20 $9,888.00 $48.50 $11,640.00 $48.00 $11,52000 Furnish and install 10" storm 2002 sewer; complete as specified Linear Feet 25.00 $44.50 $1,112.50 $50.00 $1,250.00 $56.50 $1,412.50 $60.00 $1,5110.00 Furnish and install 12" storm 2003 sewer,, complete as specified Linear Feet 85.00 $46.50 $3,952.50 $50.00 $4,250.00 $50.60 $4,301.00 $60.00 $5,100.00 Furnish and install 15" storm 2006 sewer; complete as specified Furnish; install,, maintain, and Linear Feet 35.00 $48.50 $1,697.50 $50.00 $1,750.00 $52.00 $1,820.00 $62.00 $2,170.00 remove Type D modified inlet protection; complete as 2508 specified Each 2.00 $150.00 $300.00 $90.00 $180.00 $148.00 $296.00 $100.00 $200.00 Sediment removal - Type D modified inlet protection; 2510 com tete as specified Each 2.00 $100.00 $200.00 $25.00 $50.00 $51.00 $102.00 $25.00 $50.00 Furnish; install; maintain, and remove stone tracking pad, 2512 complete as specified Each 2.00 $1,500.00 $3,000.00 $1,100.00 $2,200.00 $1,084.00 $2,168.00 $1,000.00 $2,000.00 Furnish; install; maintain; and remove stone bag; complete 2516 as specified Each 10.001 $150.00 $1,500.00 $2.05 $20.50 $20.40 $204.00 $15.00 $150.00 Furnish; install; maintain, and remove 12" diameter sediment 2518 logs; complete as specified Linear Feet 40.00 $10.00 $400.00 $7.20 $288.00 $7.20 $288 00 $750 $30000 Furnish; install; maintain; and remove ditch check; complete 2522 as specified Each 77.00 $250.00 $19,250.00 $105.(Hl $8,085.00 $101.00 $7,777.00 $100.00 $7,700.00 Page 1 of 9 7/18/2017 Contract 17-19 - Aviation Business Park Water Main Loop (95217311) Owner: Oshkosh, City of Solicitor: Oshkosh, City of Bid Opening: 07/18/201710:00 AM CDT Page 2 of 9 7/18/2017 Vinton Construction Company David Tenor Corporation PIS Contractors, Inc Advance Construction Inc. PO Box 1987 Manitowoc, WI 54221.1987 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Install salvaged topsoil 6" 2602 depth; complete as specified Square Yards 9,184.00 $4.00 $36,736.00 $2.00 $18,368.00 $5.40 $49,593.60 $2.00 $18,368.00 Furnish and install native 2610 seeding; complete as specified Square Yards 9,184.00 $1.01 $9,275.84 $1.28 $11,755.52 $1.70 $15,612.80 $0.90 $8,265.60 Furnish and install Class 1; Type A erosion control mat; 2630 complete as specified Square Yards 9,184.00 $1.85 $16,990.40 $1.52 $13,959.68 $1.95 $17,908.80 $1.38 $12,673.92 Furnish and install 8" sanitary sewer (new),, complete as 3030 specified Linear Feet 300.00 $28.20 $8,460.00 $80.00 $24,000.00 $59.50 $17,850.00 $95.00 $28,500.00 Furnish and install standard sanitary sewer manhole (4' diameter); complete as 3100 specified Vertical Feet 14.76 $179.00 $2,642.04 $310.00 $4,575.60 $280.00 $4,132.80 $500.00 $7,380.00 Furnish and install internal sanitary sewer manhole chimney seal, complete as 3118 specified Each 1.00 $382.00 $382.00 $.960.00 $360.00 $605.00 $605.00 $350.00 $350.00 Furnish and install internal sanitary sewer manhole chimney seal extension; 3120 complete as specified Each 1.00 $186.00 $186.00 $250.00 $250.00 $291.00 $291.00 $150.00 $150.00 Core into existing manhole, 3332 complete as specified Each 1.00 $990.00 $990.00 $1,200.00 $1,200.00 $1,813.00 $1,813.00 $1,500.00 $1,500.00 Trendiless 18" sanitary sewer casing pipe, complete as 3500 specified Linear Feet 240.00 $370.00 $88,800.00 $350.00 $84,000.00 $477.00 $114,480.00 $353.00 $84,720.00 Closed circuit televising; 3700 complete as specified Linear Feet 300.00 $3.00 $900.00 $5.00 $1,500.00 $5.00 $1,500.00 $4.84 $1,452.00 Furnish and install new 6" ductile iron water main with polywrap, complete as 4020 specified Linear Feet 132.00 $45.70 $6,032.40 $48.00 $6,336.00 $68.00 $8,976.00 $55.00 $7,260.00 Furnish and install new 16" ductile iron water main with polywrap; complete as 4028 specified Linear Feet 10,990.00 $83.42 $916,785.80 $83.00 $912,170.00 $84.00 $923,160.00 $90.00 $989,100.00 Furnish and install new 16" ductile iron water main with polywrap and TR Flex restrained joints, complete as 4029 specified Linear Feet 380.00 $78.80 $29,944.0(1 $102.00 $38,760.00 $73.00 $27,740.00 $98.00 $37,240.00 Furnish and install connections to existing 16" water main, complete as 4066 specified Each 2.00 $1,679.00 $3,358.00 $1,925.00 $3,850.00 $1,912.00 $3,824.00 $4,000.00 $8,00(1.00 Furnish and install 16" x 6" water main tee; complete as 4137 specified Each 14.00 $1,481.00 $20,734.00 $1,375.00 $19,250.00 $1,270.00 $17,780.00 $11150.00 $16,100.00 Furnish and install 6"45 degree water main bend; 4236 complete ass specified Each 28.00 $321.00 $8,988.00 $250.00 $7,000.00 $292.00 $8,176.00 $210.00 $5,880. W Page 2 of 9 7/18/2017 Contract 17-19 - Aviation Business Park Water Main Loop (45217311) Owner: Oshkosh, City of Solicitor: Oshkosh, City of Bid Opening: 07/18/201710:00 AM CDT -.�rw"^+a�xmrmrvn�crs�n.n�wm, waw��ny.�._u.m„caw.� w.�v.isaane_�asn Page 3 of 9 7na2ov Vinton Construction Company David Tenor Corporation PTS Contractors, Inc Advance Construction Inc. PO Box 1987 Manitowoc, WI 54221-1987 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Furnish and install 16" 45 degree water main bend; 4240 com Tete as specified Each 14.00 $1,371.00 $19,194.00 $1,335.00 $18,690.00 $1,235.00 $17,290.00 $1,150.00 $16,100.00 Furnish and install 6" water main gate valve; complete as 4401 specified Each 14.00 $1,086.00 $15,204.00 $1,125.00 $15,750.00 $1,114.00 $15,596.00 $1,050.00 $14,700.00 Furnish and install 16" water main gate valve; complete as 4405 specified Each 14.00 $7,006.00 $98,084.00 $7,350.00 $102,900.00 $7,061.00 $98,854.00 $6,925.00 $96,950.00 Furnish and install 16" x 16" tapping valve and sleeve; 4459 complete as specified Each 1.00 $13,788.00 $13,788.00 $15,600.00 $15,600.00 $16,672.00 $16,672.00 $14,5011.00 $14,500.00 Furnish and install hydrant; 4500 complete as specified Each 14.00 $3,362.00 $47,068.00 $3,550.00 $49,700.00 $3,385.00 $47,390.00 $3,700.00 $51,800.00 Jack and bore 30" steel water main casing pipe; complete as Base Bid Total: 4704 specified Linear Feet 380.00 $417.00 $158,460.00 $1,598,113.98 $455.00 $172,900.00 $1,598,880.30 $395.00 $150,100.00 $1,644,907.40 $387.00 $147,060.00 $1,649,090.02 -.�rw"^+a�xmrmrvn�crs�n.n�wm, waw��ny.�._u.m„caw.� w.�v.isaane_�asn Page 3 of 9 7na2ov Contract 17.19 - Aviation Business Park Water Main Loop (45217311) Owner: Oshkosh, City of Solicitor: Oshkosh, City of Bid Opening: 07/18/201710:00 AM CDT Page 4 of 9 7118,7017 Domer Inc. Kruesek Construction Inc. Don Hietpas and Sons Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Section 1 $1,840,329.55 $1,848,848.48 $1,889,989.50 Clearing; complete as 1010 specified Stations 3.80 $615.00 $2,337.00 $1,000.00 $3,800.00 $1,025.00 $3,895.00 Grubbing; complete as 1020 specified Stations 3.80 $615.00 $2,337.00 $1,000.00 $3,800.00 $1,025.00 $3,895.00 Removing pavement, 1100 complete as specified care Yards 790.00 $6.00 $4,740.00 $3.00 $2,370.00 $4.00 $3,160.00 Removing concrete and asphalt sidewalk and driveway, complete as 1120 specified care Feet 240.00 $1.50 $360.00 $2.00 $480.00 $2.75 $660.00 Unclassified excavation, 1200 complete as specified Cubic Yards 219.00 $15.00 $3,285.00 $14.00 $3,066.00 $12.00 $2,628.00 Restore gravel driveway/apron, complete as 1372 specffied Square Yards 150.00 $15.00 $2,250.00 $10.00 $1,500.00 $20.00 $3,000.00 Sawing existing pavement; 1700 complete as specified Linear Feet 905.00 $2.55 $2,307.75 $2.25 $2,036.25 $3.00 $2,715.00 Tack coat, complete as 1900 specified Gallons 56.00 $5.10 $285.60 $10.00 $560.00 $5.00 $280.00 5" asphaltic pavement with 10" CABC and grading; 1905 1 complete as specified Square, Yards 790.00 $51.00 $40,290.00 $46.50 $36,735.00 $38.50 $30,415.00 4" asphaltic surface with 6" CABC and grading; complete 1916 as specifiedSquare Yards 240.00 $55.00 $13,200.00 $55.00 $13,200.00 $44.50 $10,680.00 Furnish and install 10" storm 2002 sewer, com tete as specified Linear Feet 25.00 $42.00 $1,050.00 $48.00 $1,200.00 $5600 $140000 Furnish and instal 12" storm 2003 sewer; complete as specified Linear Feet 85.00 $44.00 $3,740.00 $49.00 $4,165.00 $58.00 $4,930.00 Furnish and install 15" storm 2006 sewer; complete as specified Linear Feet 35.00 $45.00 $1,575.00 $50.00 $1,750.00 $60.00 $2,100.00 Furnish; install; maintain; and remove Type D modified inlet protection; complete as 2508 s cified Each 2.00 $150.00 $300.00 $100.00 $200.00 $100.00 $200.00 Sediment removal - Type D modified Wet protection; 2510 complete as specified Each 2.00 $50.00 $100.00 $100.00 $200.00 $100.00 $200.00 Furnish; install, maintain, and remove stone tracking pad; 2512 complete as specified Each 2.00 $1,000.00 $2,000.00 $1,500.00 $3,000.00 $1,800.00 $3,600.00 Furnish; instal,, maintain; and remove stone bag: complete 2516 as specified Each 10.00 $21.00 $210.00 $15.00 $150.00 $25.00 $250.00 Furnish; install; maintain; and remove 12" diameter sediment 2518 logs, complete as specified Linear Feet 40.00 $7.25 $290.00 $15.00 $600.00 $15.00 $600.00 Furnish; install; maintain; and remove ditch check; complete 2522 as specified Each 77.00 $105.00 $8,085.00 $200.00 $15,400.00 $20.00 $1,540.00 Page 4 of 9 7118,7017 Contract 17-19 - Aviation Business Park Water Main Loop (95217311) Owner: Oshkosh, City of Solicitor: Oshkosh, City of Bid Opening: 071181201710:00 AM CDT eye p...m�mnmxexwrn�rravw.sm,we w,�e.y.e_o-w...mnun,.n o-a�rraymr eJ �w�� Page 5 of 9 7//82017 Domer Inc. Kruczek Construction Inc. Don Hietpas and Sons Inc. Section Title Item Code Item Desaiption UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Install salvaged topsoil 6" 2602 depth; complete as specified uare Yards 9,184.00 $2.50 $22,960.00 $2.75 $25,256.00 $3.75 $34,440.00 Furnish and install native 2610 seedim complete as specified Square Yards 9,184.001 $1.30 $11,939.20 $1.00 $9,184.00 $3.50 $32,144.00 Furnish and install Class I; Type A erosion control mat; 2630 complete as specified uare Yards 9,184.00 $1.50 $13,776.00 $1.25 $11,480.00 $5.25 $48,216.00 Furnish and install 8" sanitary sewer (new); complete as 3030 specified Linear Feet 300.00 $109.00 $32,700.00 $88.00 $26,400.00 $100.00 $30,000.00 Furnish and install standard sanitary sewer manhole (4' diameter); complete as 3100 specified Vertical Feet 14.76 $425.00 $6,273.00 $170.00 $2,509.20 $475.00 $7,011.00 Furnish and install internal sanitary sewer manhole chimney seal; complete as 3118 specified Each 1.00 $500.00 $500.00 $350.00 $350.00 $375.00 $375.00 Furnish and install internal sanitary sewer manhole chimney seal extension; 3120 complete as specified Each 1.00 $200.00 $200.00 $235.00 $235.00 $325.00 $325.00 Core into existing manhole; 3332 complete as specified Each 1.00 $2,500.00 $2,500.00 $500.00 $500.00 $1,500.00 $1,500.00 Trenchless 18" sanitary sewer casing pipe; complete as 3500 spedfied Linear Feet 240.00 $585.00 $140,400.00 $455.00 $109,200.00 $500.00 $120,000.00 Closed circuit televising; 3700 complete as specified Linear Feet 300.00 $5.00 $1500.00 $5,00 $1,500.00 $2.00 $60000 Furnish and install new 6" ductile iron water main with polywrap; complete as 4020 spedficd Linear Feet 132.00 $57.00 $7,524.00 $90.00 $11,880.00 $95.00 $12,540.00 Furnish and install new 16" ductile iron water main with polywrap; complete as 4028 specified Linear Feet 10,990.00 $90.00 $989,100.00 $99.00 $1,088,010.00 $91.95 $1,010,530.50 Furnish and install new 16" ductile von water main with polywrap and TR Flex restrained joints, complete as 4029 specified Furnish and install Linear Feet 380.00 $97.00 $36,860.00 $109.00 $41,420.00 $95.00 1 $36,100.00 connections to existing 16" water main, complete as 4066 specified Each 2.00 $5,0(10.00 $10,000.00 $3,800.00 $7,600.00 $4,500.00 $9,000.00 Furnish and install 16"x 6" water main tee; complete as 4137 specified Each 14.00 $1,800.00 $25,200.00 $1,570.00 $21,980.00 $1,500.00 $21,000.00 Furnish and install 6"45 degree water main bend; 4236 complete as s afled Each 28.00 $300.00 $8,400.00 $360,00 $10,080.00 $500.00 $14,000.00 eye p...m�mnmxexwrn�rravw.sm,we w,�e.y.e_o-w...mnun,.n o-a�rraymr eJ �w�� Page 5 of 9 7//82017 Contract 17-19 - Aviation Business Park Water Main Loop 05217311) Owner: Oshkosh, City of Solicitor: Oshkosh, City of Bid Opening: 07/18/201710:00 AM CDT i.�n�.a,mncrnvnw�n�rr.vwa.umwo- wnr,y.,._ew.wen�o-,,. u+e,n.vaurr,_i.un Page 6 of 9 7ns(tav Domer Inc. Kruaek Construction Inc. Don Hietpas and Sons Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Furnish and install 16"45 degree water main bend; 4240 complete as specified Each 14.00 $1,600.00 $22,400.00 $1,650.00 $23,100.00 $2,000.00 $28,000.00 Furnish and install 6" water main gate valve; complete as 4401 specified Each 14.00 $1,200.00 $16,800.00 $1,225.00 $17,150.00 $1,200.00 $16,800.00 Furnish and install 16" water main gate valve; complete as 4405 specified Each 14.10 $7,700.00 $107,800.00 $8,425.00 $117,950.00 $7,040.00 $98,560.00 Furnish and install 16"x 16" tapping valve and sleeve; 4459 complete as specified Each 1.00 $16,000.00 $16,000.00 $18,452.03 $18,452.03 $19,500.00 $19,500.00 Furnish and install hydrant; 4500 complete as specified Each 14.00 $3,625.00 $50,750.00 $3,900.00 $54,600.00 $3,5W.00 $49,000.00 Jack and bore 30" steel water main casing pipe; complete as 4704 4704 specified Linear Feet 380.00 $600.00 $228,000.00 $410.00 $155,800.00 $590.00 $224,200.00 Base Bid Total: $1,848,848.48 $109,989.50 i.�n�.a,mncrnvnw�n�rr.vwa.umwo- wnr,y.,._ew.wen�o-,,. u+e,n.vaurr,_i.un Page 6 of 9 7ns(tav Contract 17-19 - Aviation Business Park Water Main Loop (05217311) Owner: Oshkosh, City of Solicitor: Oshkosh, City of Bid Opening: 07/18/201710:00 AM CDT 1:ie p..ei�mv cvxnwrnur.vwa.vmwo- w�,v,y..._ix�.wncau..a ma,n-wmr.eJ ian Page 7,4 9 7/182017 Carl Bowers & Sons Const Co. Inc. Wood Sewer & Excavating, Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1 $1,922,701.00 $2,492,379.00 Clearing: complete as 1010 specified Stations 3.80 $250.00 $950.00 $1,100.00 $4,180.00 Grubbing complete as 1020 specified Stations 3.80 $250.00 1 $950.00 $1,100.00 $4,180.00 Removing pavement, 1100 complete as specified care Yards 790.00 $8.00 $6,320.00 $6.00 $4,740.00 Removing concrete and asphalt sidewalk and driveway; complete as 1120 specified uare Feet 240.00 $2.00 $480.00 $3.00 $720.00 Unclassified excavation; 1200 complete as specified Cubic Yards 219.00 $12.00 $2,628.00 $22.00 $4,818.00 Restore gravel driveway/apron; complete as 1372 specified Square Yards 150.00 $15.00 $2,250.00 $3.00 $450.00 Sawing existing pavement; 1700 complete as specified Linear Feet 905.00 $4.00 $3,620.00 $4.00 $3,620.00 Tack coat; complete as 1900 specified Gallons %.00 $5.00 $280.00 $5.00 $280.00 5" asphaltic pavement with 10" CABC and grading 1905 complete as specified Square Yards 790.00 $45.00 $35,550.00 $42.00 $33,180.00 4" asphaltic surface with 6" CABC and grading complete 1916 asspecified Squan, Yards 240.00 $51.00 $12,240.00 $48.00 $11,520.00 Furnish and install 10" storm 2002 sewer; complete as specified Linear Feet 25.00 $50.00 $1,250.00 $19.00 $475.00 Furnish and install 12" storm 2003 sewer; complete as specified Linear Feet 85.00 $55.00 $4,675.00 $19.00 $1,615.00 Furnish and install 15" storm 2006 sewer; complete as specified Linear Feet 35.00 $60.00 $2,100.00 $21.00 $735.00 Furnish; install; maintain; and remove Type D modified inlet protection; complete as 2508 specified Each 2.00 $100.00 $200.00 $150.00 $300.00 Sediment removal - Type D modified inlet protection; 2510 complete as specified Each 2.00 $10.00 $20.00 $100.00 $200.00 Furnish; install; maintain; and remove stone tracking pad; 2512 complete as specified Each 2.00 $1,200.00 $2,400.00 $900.00 $1,800.00 Furnish; install; maintain; and remove stone bag complete 2516 as specified Each 100) $15.00 $150.00 $30.00 $300,00 Furnish; install; maintain; and remove 12" diameter sediment 2518 logs; complete as specified Linear Feet 40.00 $10.00 $400.00 $8.00 $320.00 Furnish; install, maintain, and remove ditch check, complete 2522 Jas specified I Each 1 77.001 $100.00 $7,700.10 $110.00 $8,470.00 1:ie p..ei�mv cvxnwrnur.vwa.vmwo- w�,v,y..._ix�.wncau..a ma,n-wmr.eJ ian Page 7,4 9 7/182017 Contract 17-19 - Aviation Business Park Water Main Loop (05217311) Owner: Oshkosh, City of Solicitor: Oshkosh, City of Bid Opening: 07/18/201710:00 AM CDT NP 8 of 9 7/18/2017 Carl Bowers & Sons Const Co. Inc. Wood Sewer & Excavating, Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Install salvaged topsoil 6" 2602 depth; complete as specified Square Yards 9,184.00 $7.00 $64,288.00 $3.00 $27,552.00 Furnish and install native 2610 seedim complete as specified Square Yards 9,184.00 $2.00 1 $18,368.00 $2.00 $18,368.00 Furnish and install Class 1; Type A erosion control mat; 2630 complete as specified uare Yards 9,184.00 $2.00 $18,368.00 $2.00 $18,368.00 Furnish and install 8" sanitary sewer (new); complete as 3030 specified Linear Feet 300.00 $110.00 $33,000.00 $86.00 $25,800.00 Furnish and install standard sanitary sewer manhole (4' diameter); complete as 3100 specified Vertical Feet 14.76 $400.00 $5,904.00 $400.00 $5,904.00 Furnish and install internal sanitary sewer manhole chimney seal, complete as 3118 specified Each 1.00 $400.00 $400.00 $600d0 $600.00 Furnish and install internal sanitary sewer manhole chimney seal extension, 3120 complete as specified Each 1.00 $300.00 $300.00 $600.00 $600.00 Core into existing manhole; 3332 complete as specified Each 1.00 $1,500.00 $1,500.00 $1,000.00 $1,000.00 Trenchless 18" sanitary sewer casing pipe; complete as 3500 specified Linear Feet 240.00 $575.00 $138,000.00 $495.00 $118,800.00 Closed circuit televising 3700 complete as specified Linear Feet 300.00 $2.00 $600.00 $2.60 $780.00 Furnish and install new 6" ductile iron water main with polywrap; complete as 4020 specified Linear Feet 132.00 $100.00 $13,200.00 $62.00 $8,184.00 Furnish and install new 16" ductile iron water main with polywrap; complete as 4028 specified Linear Feet 10,990.001 $93.00 $1,022,070.00 $148.00 $1,626,520.00 Furnish and install new 16" ductile iron water main with polywrap and TR Flex restrained joints; complete as 4029 specified Linear Feet 380.00 $118.00 $44,840.00 $192.00 $72,960.00 Furnish and install connections to existing 16" water main; complete as 4066 specified Each 2.00 $1,800.00 $3,600.00 $4,400.00 $8,800.00 Furnish and install 16" x 6" water main tee; complete as 4137 specified Each 14.00 $1,500.00 $21,000.00 $1,800.00 $25,200.00 Furnish and install 6" 45 degree water main bend, 4236 complete as specified Each 28.00 $3..00 $8,400.00 1330.. $9,240.00 NP 8 of 9 7/18/2017 Contract 17-19 - Aviation Business Park Water Main Loop (05217311) Owner: Oshkosh, City of Solicitor: Oshkosh, City of Bid Opening: 07/18/201710:00 AM CDT .ePg. 9of9 7/18/2017 Carl Bowers & Sons Const Co. Inc. Wood Sewer & Excavating, Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install 16"45 degree water main bend, 4240 complete as specified Each 14.00 $1,500.00 $21,000.00 $1,700.00 $23,800.00 Furnish and install 6" water main gate valve; complete as 4401 specified Each 14.00 $1,300.00 $18,200.00 $1,800.00 $25,200.00 Furnish and install 16" water main gate valve; complete as 4405 specified Each 14.00 $8,000.00 $112,000.00 $8,200.00 $114,800.00 Furnish and install 16' x 16" tapping valve and sleeve; 4459 complete as specified Each 1.00 $19,000.00 $19,000.00 $21,000.00 $21,000.00 Furnish and install hydrant; 4500 corn lete as specified Each 14.00 $4,000.00 $56,000.00 $3,700.00 $51,800.00 Jack and bore 30" steel water main casing pipe; complete as 4704 specified Linear Feet 380.00 $575.00 $218,500.00 $540.00 $205,200.00 Base Bid Total: $1,922,701.00 $2,492,379.00 .ePg. 9of9 7/18/2017