HomeMy WebLinkAboutContract 15-06, Al Dix Change Order No.2 2017 r,A CityF, of Oshkosh September 19, 2016 Mr. Al Dix Al Dix Concrete, Inc. 500 Draper Street Kaukauna, WI 54130 Subject: Change Order No. 2 Contract 15-06 Dear Mr. Dix: Enclosed is an executed copy of Change Order No. 2 between the City of Oshkosh and Al Dix Concrete, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, aures Rabe, P.E., CPFSC Director of Public Works JER/t1t Enclosure: Change Order No. 2 cc: Pam Uhrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) 1:\Engineering\2015 COINTRAMw\15-06 Conc5ldeivalk(Na &Rehab)\Project—Inform ation\Contra ct Info\Change Orders\15-06 Executed CO 02 Ltr-9-19-16.docx Page I of I UyHaR,215 Church Avenue P.O.Box I130 Oshkosh,W154903-1130 http://www.cl.05hkosh.wi.us TO: AL DIX CONCRETE, INC. CHANGE ORDER#2 500 DRAPER STREET DATE: SEPTEMBER 7,,2016 KAUKAUNA, WI 54130 Your present contract with the,City of Oshkosh, Contract No. 15-06, awarded April 28. 2015, is hereby amended and changed as follows: NET DECREASE TO: SECTION I - PAVING ($301.50) NET INCREASE TO: SECTION 11 - STORM SEWER $0,00 NET DECREASE TO CONTRACT ($301,50) SECTION I SECTION II (PAVING) (STORM) 'TOTALS BID TOTAL $927,390.00 $10,000.00 $937,390.00 CO 41 $125,154,26 $12,400.00 $137,654,26 Co#1 ($301.50) $0.00 ($301.50) CONTRACT TOTAL i $1,062,242.76 $22,400.00 $li074,642.79— CITY OF OSHKOSH BY: C�!,�,,M ager City Clerk Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ALM Comptroller Approved 1. �as o orm: City Attqrq4 CONTRACT 15-06 CHANGE ORDER#2 SECTION I-PAVING ITEM DESCRIPTION UNIT CONTRACT I INSTALLED NET NET UNIT INCREASE IN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTPACTPRICE Removing curb and gutter, Linear 1110 complete as specified Feet 336,60 335.50 $4.50 Removing concrete and asphalt sidewalk and driveway,complete as Square 1120 specifled Feet 136,869.86 136,812.36. -57.50 31.10 $63.25) Removing concrete and asphalt sidewalk and driveway,Washington Monument,complete as Square 11208 Ispecified Feet 1,880.00 1,880.00 $1.10 7"concrete pavement removal and replacement, including sawing,pavement ties, integral curb and grading,excavating,6" CABC,terracing, and traffic control,complete as Square 1308 specified Yards 165.18 165.18 $50.00 8"concrete pavement removal and replacement, including sawing,pavement ties,integral curb and grading,excavating,6" CABC,terracing,and traffic control,complete as Square 1318 specified Yards 1,366.37 1,366.37 $55.00 8"concrete pavement HES removal and replacement, including sawing, pavement ties,integral curb and grading,excavating,6" CABC,terracing, and traffic control,complete as Square 1319 specified Yards 1,035.77 11.035.77 $60.00 Adjust manholes and inlets, 1360cam 2Each 3.00 3.00 $300.00 �leteas specified Turf restoration,complete as Square 1370 specifled Yards 265.99 265.99 $8.00 Turf restoration,Washington Monument,complete as Square 1370B specified Yards 0,00 0X0 $10.00 12"radius curb with 6"CABC and grading,complete as Linear 1410 specified Feet 0.00 0.00 $8.00 30"curb and gutter,7"with 5" CABC and grading.complete Linear 1440 ass2ecified Feet 509.80 509.80 $26.00 Sidewalk curb,complete as --D-near - 1460 .specil'ied Feet 121.90 121.90 $25,00 4"concrete sidewalk with 3" CABC and grading,complete Square 1500 as specified Feet 103.844.50 103,847.001 2.50 $3.50 $8.76 4"concrete sidewalk with 3" CABC and grading, Square 1500E Washington Monument, Feet 1.880.00 1,880.00 $4.00 4"concrete sidewalk with 3" CABC and grading,water department locations, Square 1502 ,complete asspecifled Feet 4,459.89 4,459.89 $6.25 Page 1 of 3 CONTRACT 15-06 CHANGE ORDER#2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 6"concrete sidewalk/ driveway/ramp with 3"CABC and grading,complete as Square 1510 specified Feet 48,238.27 48,178.27 -60.00 $3.85 ($231,00) 6"concrete sidewalk/ driveway/ramp with 3"CABG and grading,water department locations, Square 1512 complete as specified Feet 2,010.66 2,010.65 $7.00 8"concrete sidewalk/ driveway/ramp,with 3"CABG and grading,complete as Square 1520 specified Feet 1,794.38 1,794.38 $6.00 Curb ramp detectable warning field(naturaVnon- painted),complete as Square 1540 specified Feet 180.00 180-00 $26.00 No,4 reinforcing rods- deformed,epoxy-coated, Linear 1550_complete ass ecified Feet 1,944,00 1,944.00 $1,10 Drilled No.4 sidewalk tie bars -deformed,epoxy-coated, 1560 complete as specified Each 12,108,00 12,104,00 -4.00 $4.00 ($16.00) Cold weather covering (sidewalk)-single visquine, Square 1680_complete ass ecified Feet 0.00 0.00 $0.05 Cold weather covering (sidewalk)-double visquine, Square 1582 complete as specified Feet 0.00 0.00 $0.05 Cold weather covering (sidewalk)-double visquine with 6"hay, complete as Square 1584 specified Feet 0.00 0.00 $0.05 Up-charge for late season concrete sidewalk,driveway, or ramps,complete as Square 1590 specified Feet OM 0.00 $1.00 Up-charge for late season concrete pavement,complete Square 1591 asspecified Yards 470.08 470.08 $5.00 Sawing existing pavement, Linear 1700 complete ass ecified Feet 3,935.00 3,935.00 $2.50 Profile saw cut concrete curb, Linear 1720 complete asspecified Feet 0.00 0.00 $40.00 Base aggregate dense,114", 1800 complete asspecified Tons 0.00 0.00 $14.00 Re-grade existing gravel driveways, complete as 1820 specified Tons 0.00 0.00 $20.00 4"asphaltic pavement with 10"CABG and grading, Square 1906 complete asspecified Yards 235.62 235.62 $65.00 Page 2 of 3 CONTRACT 16-06 CHANGE ORDER#2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASEIN NUMBER QUANTITYQUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 2"asphaltic pavement, Square 1920 cam fete asspecified Yards 14.10 14.10 $50.00 SECTION I-(BID ITEMS 1110-192.0) SUBTOTAL $8.76 ($310.25) SECTION I-ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASIm IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE' PRICE CONTRACTPRICE CONTRACTPRICE Turf restoration,Washington Monument,complete as Lump 1370B specified Sum 1.00 1.00 $9,000.00 Additional negotiated cost for 4"&6"sidewalk installation at.Algoma Park(1,740 square feet @$0.50/square Lump 10000 foot);com lets asspecified Sum 1.00 1.00 $870.00 Additional negotiated cost for 4"&6"sidewalk installation at Teichmiller Park(3,331.8 square feet @$0.50/square Lump 10001 foot);complete as specified Sum 1.00 1.00 $1,665.90 Additional work on West 20th Avenue and West South Park Avenue,per Proposal dated ,July 10,2015;complete as Lump 10002 Ispecified Sum 1 1.00 1.00 $19,500.00 Additional work for High Avenue Crossing at UW Oshkosh's Sage Hall(to be reimbursed by UW Oshkosh); Lump 10003 complete as specified Sum 1.00 1,00 $9,621.16 SECTION I-(ADDITIONAL WORK REQUIRED:. CO#1 ITEMS 13706.10003)-SUBTOTAL $0.00 $0.00 NET INCREASE TO: SECTION l ($301.50) SECTION II-STORM SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish, install,maintain,and remove Type D inlet protection,complete as 2856 specified Each 112.0^0 1 112.00 $200.00 Furnish and install Class I, Square 2932 Urban,Type A erosion Yards 0.00 J-0-00 $6.00 SECTION II-(BID ITEMS 2856-2932)-SUBTOTAL $0.00 $0.00 NET DEGREASE TO: SECTION Il $0.00 NET INCREASE TO SECTIONS I&[I: $8.76 NET DECREASE TO SECTION'S I&II: ($310.25) NET INCREASE TO CONTRACT: ($301.50) Page 3of3