September 19, 2016
Mr. Al Dix
Al Dix Concrete, Inc.
500 Draper Street
Kaukauna, WI 54130
Subject: Change Order No. 2
Contract 15-06
Dear Mr. Dix:
Enclosed is an executed copy of Change Order No. 2 between the City of Oshkosh and Al Dix
Concrete, Inc. regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
aures Rabe, P.E., CPFSC
Director of Public Works
JER/t1t
Enclosure: Change Order No. 2
cc: Pam Uhrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director (w/copy)
File (w/original)
1:\Engineering\2015 COINTRAMw\15-06 Conc5ldeivalk(Na &Rehab)\Project—Inform ation\Contra ct
Info\Change Orders\15-06 Executed CO 02 Ltr-9-19-16.docx Page I of I
UyHaR,215 Church Avenue P.O.Box I130 Oshkosh,W154903-1130 http://www.cl.05hkosh.wi.us
TO: AL DIX CONCRETE, INC. CHANGE ORDER#2
500 DRAPER STREET DATE: SEPTEMBER 7,,2016
KAUKAUNA, WI 54130
Your present contract with the,City of Oshkosh, Contract No. 15-06, awarded April 28. 2015, is hereby
amended and changed as follows:
NET DECREASE TO: SECTION I - PAVING ($301.50)
NET INCREASE TO: SECTION 11 - STORM SEWER $0,00
NET DECREASE TO CONTRACT ($301,50)
SECTION I SECTION II
(PAVING) (STORM) 'TOTALS
BID TOTAL $927,390.00 $10,000.00 $937,390.00
CO 41 $125,154,26 $12,400.00 $137,654,26
Co#1 ($301.50) $0.00 ($301.50)
CONTRACT TOTAL i $1,062,242.76 $22,400.00 $li074,642.79—
CITY OF OSHKOSH
BY:
C�!,�,,M ager
City Clerk
Approved and accepted:
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
ALM
Comptroller
Approved 1. �as o orm:
City Attqrq4
CONTRACT 15-06 CHANGE ORDER#2
SECTION I-PAVING
ITEM DESCRIPTION UNIT CONTRACT I INSTALLED NET NET UNIT INCREASE IN DECREASEIN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTPACTPRICE
Removing curb and gutter, Linear
1110 complete as specified Feet 336,60 335.50 $4.50
Removing concrete and
asphalt sidewalk and
driveway,complete as Square
1120 specifled Feet 136,869.86 136,812.36. -57.50 31.10 $63.25)
Removing concrete and
asphalt sidewalk and
driveway,Washington
Monument,complete as Square
11208 Ispecified Feet 1,880.00 1,880.00 $1.10
7"concrete pavement
removal and replacement,
including sawing,pavement
ties, integral curb and
grading,excavating,6"
CABC,terracing, and traffic
control,complete as Square
1308 specified Yards 165.18 165.18 $50.00
8"concrete pavement
removal and replacement,
including sawing,pavement
ties,integral curb and
grading,excavating,6"
CABC,terracing,and traffic
control,complete as Square
1318 specified Yards 1,366.37 1,366.37 $55.00
8"concrete pavement HES
removal and replacement,
including sawing, pavement
ties,integral curb and
grading,excavating,6"
CABC,terracing, and traffic
control,complete as Square
1319 specified Yards 1,035.77 11.035.77 $60.00
Adjust manholes and inlets,
1360cam
2Each 3.00 3.00 $300.00
�leteas specified
Turf restoration,complete as Square
1370 specifled Yards 265.99 265.99 $8.00
Turf restoration,Washington
Monument,complete as Square
1370B specified Yards 0,00 0X0 $10.00
12"radius curb with 6"CABC
and grading,complete as Linear
1410 specified Feet 0.00 0.00 $8.00
30"curb and gutter,7"with 5"
CABC and grading.complete Linear
1440 ass2ecified Feet 509.80 509.80 $26.00
Sidewalk curb,complete as --D-near -
1460 .specil'ied Feet 121.90 121.90 $25,00
4"concrete sidewalk with 3"
CABC and grading,complete Square
1500 as specified Feet 103.844.50 103,847.001 2.50 $3.50 $8.76
4"concrete sidewalk with 3"
CABC and grading, Square
1500E Washington Monument, Feet 1.880.00 1,880.00 $4.00
4"concrete sidewalk with 3"
CABC and grading,water
department locations, Square
1502 ,complete asspecifled Feet 4,459.89 4,459.89 $6.25
Page 1 of 3
CONTRACT 15-06 CHANGE ORDER#2
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASEIN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
6"concrete sidewalk/
driveway/ramp with 3"CABC
and grading,complete as Square
1510 specified Feet 48,238.27 48,178.27 -60.00 $3.85 ($231,00)
6"concrete sidewalk/
driveway/ramp with 3"CABG
and grading,water
department locations, Square
1512 complete as specified Feet 2,010.66 2,010.65 $7.00
8"concrete sidewalk/
driveway/ramp,with 3"CABG
and grading,complete as Square
1520 specified Feet 1,794.38 1,794.38 $6.00
Curb ramp detectable
warning field(naturaVnon-
painted),complete as Square
1540 specified Feet 180.00 180-00 $26.00
No,4 reinforcing rods-
deformed,epoxy-coated, Linear
1550_complete ass ecified Feet 1,944,00 1,944.00 $1,10
Drilled No.4 sidewalk tie bars
-deformed,epoxy-coated,
1560 complete as specified Each 12,108,00 12,104,00 -4.00 $4.00 ($16.00)
Cold weather covering
(sidewalk)-single visquine, Square
1680_complete ass ecified Feet 0.00 0.00 $0.05
Cold weather covering
(sidewalk)-double visquine, Square
1582 complete as specified Feet 0.00 0.00 $0.05
Cold weather covering
(sidewalk)-double visquine
with 6"hay, complete as Square
1584 specified Feet 0.00 0.00 $0.05
Up-charge for late season
concrete sidewalk,driveway,
or ramps,complete as Square
1590 specified Feet OM 0.00 $1.00
Up-charge for late season
concrete pavement,complete Square
1591 asspecified Yards 470.08 470.08 $5.00
Sawing existing pavement, Linear
1700 complete ass ecified Feet 3,935.00 3,935.00 $2.50
Profile saw cut concrete curb, Linear
1720 complete asspecified Feet 0.00 0.00 $40.00
Base aggregate dense,114",
1800 complete asspecified Tons 0.00 0.00 $14.00
Re-grade existing gravel
driveways, complete as
1820 specified Tons 0.00 0.00 $20.00
4"asphaltic pavement with
10"CABG and grading, Square
1906 complete asspecified Yards 235.62 235.62 $65.00
Page 2 of 3
CONTRACT 16-06 CHANGE ORDER#2
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASEIN
NUMBER QUANTITYQUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
2"asphaltic pavement, Square
1920 cam fete asspecified Yards 14.10 14.10 $50.00
SECTION I-(BID ITEMS 1110-192.0) SUBTOTAL $8.76 ($310.25)
SECTION I-ADDITIONAL WORK REQUIRED: CO#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASIm IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE' PRICE CONTRACTPRICE CONTRACTPRICE
Turf restoration,Washington
Monument,complete as Lump
1370B specified Sum 1.00 1.00 $9,000.00
Additional negotiated cost for
4"&6"sidewalk installation
at.Algoma Park(1,740
square feet @$0.50/square Lump
10000 foot);com lets asspecified Sum 1.00 1.00 $870.00
Additional negotiated cost for
4"&6"sidewalk installation
at Teichmiller Park(3,331.8
square feet @$0.50/square Lump
10001 foot);complete as specified Sum 1.00 1.00 $1,665.90
Additional work on West 20th
Avenue and West South Park
Avenue,per Proposal dated
,July 10,2015;complete as Lump
10002 Ispecified Sum 1 1.00 1.00 $19,500.00
Additional work for High
Avenue Crossing at UW
Oshkosh's Sage Hall(to be
reimbursed by UW Oshkosh); Lump
10003 complete as specified Sum 1.00 1,00 $9,621.16
SECTION I-(ADDITIONAL WORK REQUIRED:. CO#1 ITEMS 13706.10003)-SUBTOTAL $0.00 $0.00
NET INCREASE TO: SECTION l ($301.50)
SECTION II-STORM SEWER
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
Furnish, install,maintain,and
remove Type D inlet
protection,complete as
2856 specified Each 112.0^0 1 112.00 $200.00
Furnish and install Class I, Square
2932 Urban,Type A erosion Yards 0.00 J-0-00 $6.00
SECTION II-(BID ITEMS 2856-2932)-SUBTOTAL $0.00 $0.00
NET DEGREASE TO: SECTION Il $0.00
NET INCREASE TO SECTIONS I&[I: $8.76
NET DECREASE TO SECTION'S I&II: ($310.25)
NET INCREASE TO CONTRACT: ($301.50)
Page 3of3