Loading...
HomeMy WebLinkAboutAECOM, Proposal No. OPP-542187 AECOM 920.235.0270 tO ASCOM 558 North Main street 920,2360321 fax Oshkosh,Wisconsin 54901 September 8, 2016 jqVJ,,IJC WDRK1,�1 Mr. James Rabe, PE, CPESC W1sc,0W;1N Director of Public Works City of Oshkosh 216 Church Avenue Oshkosh,Wisconsin 54903-1130 Subject, Proposal for Construction Monitoring and Documentation Services Related:to the Construction of City of Oshkosh Contract 16-22-Marion Road Water Tower Replacement, Oshkosh, Wisconsin —AECOM Proposal No. OPP-542187 Dear Mr. Rabe: AECOM Technical Services, Inc. (AECOM) is pleased to present this proposal to the City of Oshkosh (City) for Construction Monitoring Documentation Services in support of CH2M Hill related to the construction of City Contract 16-22 Marion Road Water Tower Replacement, located in Oshkosh, Wisconsin, AECOM will provide local staff to assist with the construction management of this project. AECOM and CH2M Hill have previously successfully provided similar services to the City on other projects. Further, AECOM will partner during construction with CI-12M HILL and will provide the following services under direct contract with the City of Oshkosh: • Collaborate with CH2M on review of foundation design shop drawings. • Manage documentation associated with loading, hauling and disposal of impacted soil. • Review and provide feedback on the Contractor's provisions for impacted groundwater management for conformance with City requirements. • Collaborate with CH2M on review of Contractor's Existing Tower Demolition Plan; confirm Demolition Plan conformance with state demolition requirement. • Provide the following services during the excavation, foundation construction, and existing tower demolition phases of the project: • Construction inspection services; • Participate in monthly progress meetings; and • Maintain record of field activities. • Provide select field and laboratory testing services. This document includes proprietary data that shall not be duplicated,used or disclosed outside City of Oshkosh for any purpose other than to evatuale this document.This restriction does not limit City of Oshkosh's right to use information contained In this document if it is obtained from another source without restriction. 0 PP-5421 83—D RAFT Marion Road Water Tower CM final docx AECOM 2 Protect Challenges Design and construction of this project has taken into consideration the following: • Subsurface geotechnical conditions related to deep foundation requirements; • Subsurface environmental issues related to site grading and construction; • Shallow groundwater is impacted with petroleum and/or volatile organic compounds, • Existing water tower is painted with lead-based paint; and • Close proximity of neighboring industrial, commercial and apartment buildings. Proposal Assumptions • AECOM will assist CH2M HILL (Engineer of Record) with specific tasks of construction management and documentation as summarized in this proposal. • CH2M HILL will provide final input on submittals as required to conform to project intent and contract documents. AECOM will initially review the selected submittals and provide review comments for CH2M HILL and the City's consideration. Prosect Understanding The Marion Road Water Tower Replacement project consists of a new 750,000 gallon elevated water storage tank, valve vault, telecommunication equipment shelters and site improvements which will be constructed in close proximity to the existing water tower. Once the new water tower is in operation, the existing water tower will be demolished. AECOM has previously been involved with this project working directly for the City and as a subcontractor for CH2M Hill. We provided the geotechnical and environmental subsurface evaluation during the design phase of the project. In addition, AECOM has been involved with the Marion/Pearl Redevelopment Area since the conceptual design phase. Our local staff has extensive experience with geotechnical and environmental' issues related to this site and surrounding area. This proposal presents our understanding of the project, proposed scope of work for Construction Monitoring and Documentation Services and fees estimated for these services. Scope of Work The proposed scope of work includes submittal review assistance, construction oversight, construction testing and documentation during the following activities: • Foundation installation Subsurface excavation • Dewatering activities • Impacted soil and groundwater management • Material testing of cast-in-place concrete Use or disclosure of data contained on this shoat is subject to the restriction on the first page of this document. KAPROPOSAL1Cfty of 0shkosMOPP-542183—marion Road Water Tower MOPP-542183_DRAFT Marion Road Water Tower CM final docx AECOM 3 0 Material testing of backfill * Demolition Construction Documentation AECOM will provide Project Representative Services on a day-to-day basis during specific portions of construction of the project as outlined above. AECOM has based our fee estimate on an overall construction period of 18 total weeks during 2016,2017 and 2018. AECOM will provide on-site documentation and testing staff as needed during the project. Field and Laboratory testing will be provided as identified in this scope of work to document compliance with project plans and specifications. In addition, we will work with CH21VI HILL, the City and Contractor on contract administration issues. A summary of tasks is provided below. 0 Provide a full-time on site Project Field Representative (based on project need) during the construction period (18 weeks) • Assist CH2M Hill with review of the Contractor's progress, submittals/submissions and'consult with the City concerning their completeness and acceptance. We estimate 15-20 submittals will be reviewed by AECOM. The balance of the submittals will be reviewed by others. 0 Conduct site observations of the work in progress, determine if the work is generally proceeding in accordance with the contract documents and that completed work appears to conform to the contract documents. 0 Maintain reports for the construction contract recording weather conditions when on the job site; data relative to questions of extras or deductions; list of daily activities; decisions, observations in general; and specific observations in more detail as in the case of observing test procedures. • Report to the CH21M HILL and the City whenever the Project Representative believes that any work is unsatisfactory, faulty or defective, or does not conform to the Contract Documents and advise if work should be corrected or rejected. 6 Notwithstanding that it is the Contractor's sole responsibility for job site safety, AECOM will report immediately to CH2M, HILL and the City the occurrence of any accident. • Provide laboratory material testing to document conformance with plans and specifications. At this time we anticipate soil testing to include determination of dry density and material gradation. We also anticipate testing will include pavement and compressive strength for concrete materials placed. 0 Provide field testing to document conformance with plans and specifications. Record horizontal and vertical coordinates of individual test so as to allow later identification and inclusion in the project construction documents. Testing to include: Nuclear density compaction testing for soils and bituminous pavement and cast-in-place concrete placement monitoring. • Provide photo documentation throughout the construction period that AECOM is on site. • Provide vehicles, necessary equipment and material for inspection. Use or disclosure of data contained on this sheet is suhject to the restriction on the first page of this document. K:1PROPOSAL\Gi1y of Oshkosh\OPP-542183—Marion Road Water Tower CIVIOPP-5421 B3—DHAFT Marion Road Water Tower CM iinal.docx AECOM 4 • Before issuance of the "Certificate of Substantial Completion," AECOM will assist CH2M Hill in preparing and submitting to the contractor a list of observed items requiring completion or correction. • Conduct a final inspection in the company of CH2�M HILL, the City and contractor, and prepare a final list of items to be completed or corrected. • Provide site visits by Engineering (as identified below) during construction to verify design criteria as required by permit conditions. Agency Agreement Authority to Act as Agent for Company Pursuant to the terms and conditions of the Master Service Agreement for Services provided by AECOM Technical Services, Inc. (hereinafter"CONTRACTOR") for the City of Oshkosh (hereinafter "COMPANY"), dated April 2009, (hereinafter referred to as the "Agreement"or the "MSA"), which Agreement is incorporated herein by this reference between CONTRACTOR and COMPANY. COMPANY hereby authorizes CONTRACTOR to act as its agent for the purpose of arranging for the transport and/or disposal of waste ("Services") encountered while providing the services described in CONTRACTOR'S proposal number OPP-542183, dated August 30, 2016, when the DESCRIPTION OF WORK of a specific Request for Services ("RFS") so states. COMPANY shall defend, indemnify and hold CONTRACTOR, its employees, agents and subcontractors harmless against any claim, actions, causes of action, liability,judgments, fines, penalties and costs reasonably incurred which arise out of CONTRACTOR's actions within the scope of its authorization as agent for COMPANY for Services in accordance with the MSA, except to the extent such claims, actions, causes of action, liability, judgments, fines, penalties and costs arise out of CONTRACTOR's negligence, breach of contract, or willful misconduct which in whole or in part caused the damage, injury or loss. CONTRACTOR shall defend, indemnify and hold COMPANY, its officers, directors and employees harmless against any claims, actions, causes of action, liability,judgments, fines, penalties and costs reasonably incurred which arise out of CONTRACTOR's negligence, breach of contract or willful misconduct. For transport and disposal activities undertaken by CONTRACTOR in accordance with this Agreement, it is agreed that CONTRACTOR shall under no circumstances be considered the generator of any Waste from the project site pursuant to any environmental or other law or regulation. It is further agreed that nothing in this authorization is intended to transfer or convey ownership of such Waste to CONTRACTOR Project Team AECOM proposes a team comprised of Paul Timm, Project Manager, Thomas Bishop, Project Representative, and Jeremy Thomas, P.E., Geotechnical Engineer. The proposed team has been selected to provide AECOM staff that understand client expectations, have previous project involvement, have been involved with similar projects, understand respective project responsibilities, and provide a reasonable cost approach with sensitivity to overall project. Use or disclosure of data contained on this sheet is subject to the restriction on the first page of this document. KAPROPOSALkCity of Oshkosh\OPP-542183—Marion Road Water Tower GM\OP P-542183D RAFT Marion Road Water Tower GM final.docx AECOMi 5 Estimated Fees The estimated fee for construction oversight, documentation, construction testing, and engineering services is $79,590 as Summarized in the table below. A detailed breakdown including level of effort per assigned staff is attached. AECOM will only charge for actual incurred costs. If the project is completed outside of the assumptions AECOM may request to reduce or increase the budget accordingly. Task Estimated Fee Task 1 — Pre-Construction, Submittal Review, Meetings and Project Management $15,040 Task 2 - Foundation Field Work/Project Management (includes Field and $47,705 Laboratory Testing/Expenses) Task 3— Demolition Documentation $16,845 Total Estimated Fees $79,590 If services to be provided under this proposal require the agents, employees, or contractors of AECOM to enter onto the Project site, Client shall provide right-of-access to the site to AECOM, its employees, agents, and contractors, to conduct the planned field observations or services. The services described in this proposal will be provided on a time and materials basis. Based upon the above scope of services the estimated budget for these services is $79,590. The services provided will be performed in accordance with the negotiated 2016 Fee Schedule and the conditions of the 2009 City of Oshkosh Negotiated General Conditions of Service, which are expressly incorporated into, and are an integral part of, our contract for professional services. AECOM can begin providing these services immediately upon receipt of the signed Authorization Form (attached). We appreciate the opportunity to provide these services to the City of Oshkosh. If you have any questions regarding the proposed project approach or corresponding costs, please contact us at your convenience. If you have any questions or need to clarify a point, please call Paul Timm at 920-236-6718, Sincerely, AEC Technical Services, Inc. L a a ul F. �imm I kin L. Brehm, P.E. Account Manager Associate Vice President & Attachments: Authorization Form Project Fee Estimate Use or disclosure of data contained on this sheet is subject to the restriction on the first page of fts document. K:1PR0P0SAL\Qty of OshkoshkOPP-542183—Marion Road Water Tower CM\0PP-542M_DRAFT Marion Road Water Tower CM final.docx AECOM 920.235.0270 tel A.=COM 558 North Marin Street 920.235.0321 fax Oshkosh,Wisconsin 54901 Authorization September 8, 2016 I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. I hereby authorize AECOM to proceed with the scope of work for the Construction Monitoring and Documentation Services Related to the Construction of City of Oshkosh Contract 16-22— Marion Road Water Tower Replacement, Oshkosh,Wisconsin as described in AECOM's proposal number OPP-542183 dated September 8, 2-16, with a budget authorization of$79,590 under the general terms and conditions specified in the proposal. Sign6ture Date Mark A Rohloff Print Name City Manager Title/Organization Signature Date Pamela R. Ubrig; Print Name City Clerk Title/Organization 8 re Date Lynn A. Lorenson; Print Name City Attorney Title/Organization AM A', Signature- Date Trena Larson Print Name Director of Finance Title/Organization Use or disclosure of data contained on lhfs sheet is subject to the restriction on the first page of this document. KAPROPOSAMity of Oshkosh\OPP-542183—Marion Road Water Tower GKOPP-542183—DRAFT Marion Road Water Tower CM final .docx AECOM 1 agree to accept invoices from AECOM via e-mail and not postal mail: ❑ Yes Signature: E-mail address: Recipient Mr./Ms: Return to: Name: Paul Timm 558 North Main Street Address: Oshkosh, WI 54901 Fax: 920.235,0321 Phone: 920,236,6718 Use or disclosure of data contained on this sheet is subject to the restriction on the first page of this document. KAPROPOSALkCity of Oshkosh\OPP•542183_Marion Road Water Tower CNOPP-542183—DRAFT Marion Road Water Tower CM final .docx Project Fee Estimate Construction Monitoring and Documentation Services Related to the Construction of City of Oshkosh Contract 16-22-Marion Road Water Tower I AECOM Proposal No.OPP-5421187 Prepared':August 30,2016 Staff/Service Project AssignmentlUnit Total Rate Total August 2016 September 2016 Hours/Units �12 19 26 2 9 16 23 3 Task I -Pre-Construction,Submittal Review,Meetings and Project Management I Timm, Paul Project Manager 1 74 $165.00 $12,210.00 2 2 2 2 8 8 Shlerk,Cliff Project Manager AECOM 10 $115,00 1 $1,150.00 2 — I I Thomas,Jeremy Geotechnical Engineer 12 $140.00 $1,680.00 4 4 4 Task 2 Total $15,040.00 Task 2-Foundation Field Work!Project Management(includes Field and Laboratory Testing/Expen! Field Work Staff Bishop,Tom Senior Field Technician, 360, $1115.00 $41,400.00 I 40 40 40 40 4 Crotteau,Katie Administrative Assistance 18 $75,0:0_ $1,350.00 a 2 2 2 Field and Laboratory Testing/Expenses Concrete Com p Strength/Reserve Per Test 40 $22.00 $880,00 Nuclear Meter Rental Per Day 5 $75,00 $375.00 Truck Rental Per Week 9 $250.00 $2,250.00 1 1 1 1 Miscellaneous Expenses Per Week 9 $50.00 $450.00 1 1 1 1 Subcontract Laboratory Services Each I $1,000.00]_$1,000.60 Task 2 Total $47,705.00 Task 3-Demolition Documentation Timm, Paul Project.ManaSer 42 $165.00 $6,930.00 Shlork,Cliff Project Manager 6 $115.00 $690,00 Crotteau, Kafie Project Manager 15 $75,00 $1.125.00 Bishop,Tom Senior Field Technician 60 $115.00 $6,900,00 Truck Rental Per Week 4 $250,00 $11,000.00 Miscellaneous Expenses Per Week 4 $50.00 $200.00 Task 3 Total UUALU Total Project Estimate $79,590.010 Notes: -Dates are week ending(Friday) -Labor and Unit Rates from 2016 Negotiated Fee Schedule between AECOM Technical Services, Inc and the City of Oshkosh KAPROPOSALkCity of 0shkoshkOPP-542183-Marlon Road Water Tower MOPP-542183-Marion Road Water Tower CM Cost EsfirnateAsx Project Fee Estimate Construction Monitoring and Documentation Services Related to the Construction of City of Oshkosh Contract 16-22-Marion Road Water Tower R, AECOM Proposal No,OPP-542187 Prepared:August 30,2016 Total August 2016. September 2015 Staff/Service Project Assignment/UnitHaursfUnits Rate Total 5 12 19 26 2 9 16 23 130 Task 1 -Pre-Construction,Submittal Review,Meetings and Project Management Timm,Paul Project Manaqor 74 6 Shie k,Cliff Project managerAECOivf 10 $115.00 $1,15210.00 2 8 0.00 2 4 4 4 2 Thomas,JeremyGeotechnical Engine 12 $140.00 $1,680.00 Task 2 Total $15,040,00 Task 2-Foundation Field'Work f Project Management(Includes Field and Laboratory Testing f Expen Field Work,Staff Bishop,Tom Senior Field Technician 360 $115.-0-07 $41,400.00 F4o 40 40 40 40 Crotteau,Katie Administrative Assistance 18 $75.00 $1,350.00 2 2 2 2 2 Field and Laboratory Testing/Expenses Concrete Comp Stren th/Reserve Per Test 40 $22.00 $880.00 Nuclear Meter Rental Per Day 5 $75.00 $375.00 5 Truck Rental Per Week 9 $250,00 1 $2,250.00 1 1 1 1 1 Miscellaneous Expenses Per Week 9 $50.00 $450.00 1 1 1 1 1 Subcontract Laboratory Services Each 1 $1,000m $1,000.00 Task 2 Total $47,705.00 Task 3-Demolition Documentation Timm, Paul Project Manager 42 $165.00 $6,930.00 Shierk,Cliff Project Mana er 6 $115.00 $690.00 Crotteau, Katie Pro'eck Mana er 15 $75,00 $1,125.00 Bishop,Tam Senior Field Technician 60 $115.00 $61900.00 Truck Rental Per Week 4 $250.00 $1,000.00 Miscellaneous Expenses Per Week 4 $50,00 $200.00 Task 3 Total U s4UQ 1 1 f I I Total Project Estimate $79,590.00 Notes: -Dates are week ending(Friday) -Labor and Unit Rates from 2016 Negotiated Fee Schedule between AECOM Technical Services, Inc and the City of Oshkosh