HomeMy WebLinkAboutPublic Works Field Operations, Order #003R City
ofw
Oshkosh
August 1, 2016
Mr. Keith Isken
Jos, Schmitt &Sons Construction Co., Inc.
PO Box 1084
Sheboygan, WI 53082-1084
RE: Change Order No. 3
Contract 15-21
Dear Mr. Isken:
Enclosed is an executed copy of Change Order No. 3 between the City of Oshkosh and Jos.
Schmitt& Sons Construction Co., Inc. regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
mes Rabe, P.E., CPESC
Director of Public Works
JER/t1t
Enclosure: Change Order No. 3
cc: Pam Ubrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director (w/copy)
Jon Wallenkamp,Kueny Architects (w/copy)
Kevin Uhen, Public Works Field Operations Manager (w/copy)
File (w/original)
l:\Fngineering\2015CONTRAC751J5.21PWFieldOpsFacilityPhlllyProjectlnlormationkCcntract Page 1 of 1
lydo\Change Orders\15-21 Executed CO#3 Ur_8-1-1&docx
City Nall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1130 hitp://www.cl.oshkosh.wi.us
AIA
Document G701 - 2001
asae�
Change Order
PROJECT(Brame and address): CHANGE ORDER NUMBER:0038 OWNER:❑
Public Works Field Operations Facility- DATE:6/15/2016 ARCHITECT:❑
Phase I❑
639 Witzel Avenue CONTRACTOR:❑
Oshkosh,IV]54902
TO CONTRACTOR(Alcune and address): ARCHITECT'S PROJECT NUMBER; FIELD:El
Jos.Schmitt&Sons Construction CONTRACT DATE:3/30/2015 OTHER:❑
Company,Inc CONTRACT FOR:General Construction
PO Box 1084
2014 Union Avenue
Sheboygan,W153082-1084
THE CONTRACT IS CHANGED AS FOLLOWS:
(Inchrde,where applicable,any undisprrled amount attributable to previously erecuteel Construction Change Directives)
The original Contract Sum was $ 2,889,000.00
The net change by previously authorized Change Orders $ -629,501.35
The Contract Sum prior to this Change Order was $ 2,259,498.65
The Contract Sum will be increased by this Change Order in the amount of $ 15,928.96
The new Contract Sum including this Change Order will be $ 2,275,427.61
The Contract Time will be increased by Zero(0)days.
The date of Substantial Completion as of the date of this Change Order therefore is
NOTE:This Change Order does not include changes in the Contract Suitt,Contract'l'ime or Guaranteed Maxitnnm Price which have
been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor,in iv hick case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Kueny Architects,LLC Jos. Schmitt&Sons Construction City of Oshkosh
Company hhc
ARCHITECT(Finn name) CONTRACTOR(Firm name) OWNER(Firm name)
10515 Corporate Drive Suite 100 2104 Union Avenue 215 Church Avenue
emnnt P airie,W153158 PO Box 1084 Oshkosh,Wl 5 4903-110
Shebo n,1,VI 3Q 2- 84
AD E ADDRE KESS
S &w— L= Pox A
ignaler e) BY( ter e) BY(Signature)
Jon Wallenkamp Keith Is en Janhes babe
(7},ped name) (Typed name) (Typed f ame)
June 15,2016 L/J�j•"2�1� _ ___ _
DATE DATE v y DATE
AIA Document G701 T"—2007.Copyright®1979,1987,2000 and 2001 by The American Institute of Architects.All rights reserved.WARNING:This AIAm
Document Is protected by U.S.Copyright Law and International Treaties,Unauthorized reproduction or distribution of this AIA®Document,or any
portion of it,may result in severe civil and criminal penslftos,and will be prosecuted to the maximum extent possible undor the law.This documentwas
produced by AIA software at 12:08:23 on 06/15/2016 under Order No.5703201110_1 which expires on 0610912017,and is not for resale.
User N otos: (1265002546)
uo
CL
..—o
0
0
tA In
0 0
aj W -
Q Y
O 1 , 0
C C 0 r-1 3: N
4 O
r 00
O ++
C L m C -0QJ 0 H ro O R
C -0 4 U U M an U j,
O - on j co W
'ri >; 0 is N
C ,� •� L m ro 'L
QJ ro O U E 0
U L
al -041
R
ai
@ V�j SC7 N N � �_ +' aJ
of C 5= L Sw I- � aJ �
U 4
$ U
0 0- ro " 0 L +�
0 Lnd
ro p O a1 d o C
d w _ -0 Un C N a) ro
O Q O — m ol
QD
s
N Sn U •40
C U CS
x a 0 w S2 v t m
0L C "� m w L3 fD U A
Q C
CL ro m an ro 0 •3
its � j m
0 '� '� 0 sv sa ro to
Oaj IR O O 0 4-1 Q
flC f1 0. rZ a1
LD
mal 0 0 0 O O O )O O co
G tri 4 r `O O tri OH 01
koQ
O co d O t� N m Lr
O• c 1 r i m lN0 t[ c* �/}
Q i/} yr tn I il? V)- in- I tr}
O
O
� N
r-1
U I -V�
0 0 0 0 0 0 0 O
0 0 0 O 0 0 0 0 O
tri 4r-� o o tri r o ao H
0 M � p N rr Lr It m
vi -a ri fi m �o a ri ri T-i
m Q ire in <n -Ln 4.4 -kn vT v?1 1 trr
c' -O _0 _0 "O '0 •6 -0 "a -0
�Qa OWWW m m w a o w aJ
liD
0 0 O d t 10•0
0• Q aJ 0 L L
CU ya 0. Q a. a ro Q Q S1 !z
'a vz a o. 0- a s m 0 a� v Q Q
o a ¢ a a a a ¢ a
m
wo
to 0 H � � C Ln H H H m
. 0 0 0 0 o d o d a 3n •S �
Ln
1�� t� 7 (fin
.a .moi �r-1 H H � Hr-ir-I i��!it
V) n n N
_
� ���A o
c`r nor s
Signed for and in behalf of the City of Oshkosh
Mark A. Rohloff, City Manager
Lan, 0a ,.
Pamela R. Ubrig, City Clerk
'A X4, UkAYL,
Lynn L renson, t At oiney
jmv,, Aq , OT\,
Trena Larson, i ector of Finance
I hereby certify that the necessary provisions
have been made to pay the liability which will
accrue under this contract.
IA