HomeMy WebLinkAboutPublic Works Field Operations, Order #003R City ofw Oshkosh August 1, 2016 Mr. Keith Isken Jos, Schmitt &Sons Construction Co., Inc. PO Box 1084 Sheboygan, WI 53082-1084 RE: Change Order No. 3 Contract 15-21 Dear Mr. Isken: Enclosed is an executed copy of Change Order No. 3 between the City of Oshkosh and Jos. Schmitt& Sons Construction Co., Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, mes Rabe, P.E., CPESC Director of Public Works JER/t1t Enclosure: Change Order No. 3 cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) Jon Wallenkamp,Kueny Architects (w/copy) Kevin Uhen, Public Works Field Operations Manager (w/copy) File (w/original) l:\Fngineering\2015CONTRAC751J5.21PWFieldOpsFacilityPhlllyProjectlnlormationkCcntract Page 1 of 1 lydo\Change Orders\15-21 Executed CO#3 Ur_8-1-1&docx City Nall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1130 hitp://www.cl.oshkosh.wi.us AIA Document G701 - 2001 asae� Change Order PROJECT(Brame and address): CHANGE ORDER NUMBER:0038 OWNER:❑ Public Works Field Operations Facility- DATE:6/15/2016 ARCHITECT:❑ Phase I❑ 639 Witzel Avenue CONTRACTOR:❑ Oshkosh,IV]54902 TO CONTRACTOR(Alcune and address): ARCHITECT'S PROJECT NUMBER; FIELD:El Jos.Schmitt&Sons Construction CONTRACT DATE:3/30/2015 OTHER:❑ Company,Inc CONTRACT FOR:General Construction PO Box 1084 2014 Union Avenue Sheboygan,W153082-1084 THE CONTRACT IS CHANGED AS FOLLOWS: (Inchrde,where applicable,any undisprrled amount attributable to previously erecuteel Construction Change Directives) The original Contract Sum was $ 2,889,000.00 The net change by previously authorized Change Orders $ -629,501.35 The Contract Sum prior to this Change Order was $ 2,259,498.65 The Contract Sum will be increased by this Change Order in the amount of $ 15,928.96 The new Contract Sum including this Change Order will be $ 2,275,427.61 The Contract Time will be increased by Zero(0)days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE:This Change Order does not include changes in the Contract Suitt,Contract'l'ime or Guaranteed Maxitnnm Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in iv hick case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Kueny Architects,LLC Jos. Schmitt&Sons Construction City of Oshkosh Company hhc ARCHITECT(Finn name) CONTRACTOR(Firm name) OWNER(Firm name) 10515 Corporate Drive Suite 100 2104 Union Avenue 215 Church Avenue emnnt P airie,W153158 PO Box 1084 Oshkosh,Wl 5 4903-110 Shebo n,1,VI 3Q 2- 84 AD E ADDRE KESS S &w— L= Pox A ignaler e) BY( ter e) BY(Signature) Jon Wallenkamp Keith Is en Janhes babe (7},ped name) (Typed name) (Typed f ame) June 15,2016 L/J�j•"2�1� _ ___ _ DATE DATE v y DATE AIA Document G701 T"—2007.Copyright®1979,1987,2000 and 2001 by The American Institute of Architects.All rights reserved.WARNING:This AIAm Document Is protected by U.S.Copyright Law and International Treaties,Unauthorized reproduction or distribution of this AIA®Document,or any portion of it,may result in severe civil and criminal penslftos,and will be prosecuted to the maximum extent possible undor the law.This documentwas produced by AIA software at 12:08:23 on 06/15/2016 under Order No.5703201110_1 which expires on 0610912017,and is not for resale. User N otos: (1265002546) uo CL ..—o 0 0 tA In 0 0 aj W - Q Y O 1 , 0 C C 0 r-1 3: N 4 O r 00 O ++ C L m C -0QJ 0 H ro O R C -0 4 U U M an U j, O - on j co W 'ri >; 0 is N C ,� •� L m ro 'L QJ ro O U E 0 U L al -041 R ai @ V�j SC7 N N � �_ +' aJ of C 5= L Sw I- � aJ � U 4 $ U 0 0- ro " 0 L +� 0 Lnd ro p O a1 d o C d w _ -0 Un C N a) ro O Q O — m ol QD s N Sn U •40 C U CS x a 0 w S2 v t m 0L C "� m w L3 fD U A Q C CL ro m an ro 0 •3 its � j m 0 '� '� 0 sv sa ro to Oaj IR O O 0 4-1 Q flC f1 0. rZ a1 LD mal 0 0 0 O O O )O O co G tri 4 r `O O tri OH 01 koQ O co d O t� N m Lr O• c 1 r i m lN0 t[ c* �/} Q i/} yr tn I il? V)- in- I tr} O O � N r-1 U I -V� 0 0 0 0 0 0 0 O 0 0 0 O 0 0 0 0 O tri 4r-� o o tri r o ao H 0 M � p N rr Lr It m vi -a ri fi m �o a ri ri T-i m Q ire in <n -Ln 4.4 -kn vT v?1 1 trr c' -O _0 _0 "O '0 •6 -0 "a -0 �Qa OWWW m m w a o w aJ liD 0 0 O d t 10•0 0• Q aJ 0 L L CU ya 0. Q a. a ro Q Q S1 !z 'a vz a o. 0- a s m 0 a� v Q Q o a ¢ a a a a ¢ a m wo to 0 H � � C Ln H H H m . 0 0 0 0 o d o d a 3n •S � Ln 1�� t� 7 (fin .a .moi �r-1 H H � Hr-ir-I i��!it V) n n N _ � ���A o c`r nor s Signed for and in behalf of the City of Oshkosh Mark A. Rohloff, City Manager Lan, 0a ,. Pamela R. Ubrig, City Clerk 'A X4, UkAYL, Lynn L renson, t At oiney jmv,, Aq , OT\, Trena Larson, i ector of Finance I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. IA