Loading...
HomeMy WebLinkAboutAECOM Proposal No. OPP-497084 /y.i����� AECOM 920.235.0270 tel �i558 North Main Street 920.235.0321 fax Oshkosh,Wisconsin 54901 JUN - 3 2016 June 1, 2016 I)MI[["1pp')701° ipp'}�.1131_g,1`C( 4�V7pthp Mr. James Rabe, PE, CPESC A Director of Public Works City of Oshkosh 215 Church Avenue Oshkosh, Wisconsin 54901 Subject: Proposal for 2016 Leak Detection Services in Oshkosh,Wisconsin AECOM Proposal No. OPP-497084 Dear Mr. Rabe; AECOM Technical Services, Inc. (AECOM) is pleased to submit this proposal to the City of Oshkosh (City)to conduct a Leak Detection Survey on approximately 100 miles of water main in the City's water distribution system in 2016. The proposed services represent the third phase of investigation activities to be completed on the City of Oshkosh Municipal Water Supply which consists of approximately 100 miles of water main piping. Historically the City has completed the total comprehensive City wide leak detection survey over a three(3)year period (i.e, 100, miles per year). The first and second phase of this program was completed by AECOM in 2014 and 2015. This proposal has been prepare for the third phase of those services and is intended for the remaining approximate 100 miles of municipal system outside the 2014 and 2015 survey areas. The purpose of the annual surveys is to identify specific points of leakage such that system rehabilitation can be undertaken and lost water reduced. The remainder of this proposal discusses the scope of services to be completed, schedule, information/assistance required from client, and compensation. Scope of Services Services to be provided for the Project are as follows. • Meet with City to review existing water distribution systems maps, pertinent water system reports, and the schedule for conducting the leak detection field services. • Conduct a leak detection and location survey with sonic detection and computer correlation equipment on approximately 100 miles of the water distribution system. Physical contact will be made with the system at exposed valves and fire hydrants. After the initial sonic leak survey of a portion of the system is completed, indications of leaks will be verified a second time, after which leaks will be located with a computer programmed leak correlator designed to pinpoint leak locations without drill holes or excavations. Where leakage into a storm or sanitary sewer is suspected, a visual examination of the appropriate sewer will be conducted. All equipment used will be non-intrusive. Valves and hydrants will not normally require This document Indudes proprietary data that shall not be dupftated,used or disclosed outside City of Oshkosh for any purpose other than to evaluate this document.This restriction does not limit City of Oshkosh's right to use information contained in this document if it is obtained from another source without restriction. OPP-497084_2016 Leak Detection Services Proposal.doex AECOM 2 operation during the survey and pinpointing operations.This survey will be conducted primarily during normal working hours,with additional leak detection being conducted during late evening and/or early morning hours in areas of high traffic volume. • Prepare an inventory of defective system components such as valves, hydrants, meters, and curb stops,which are noted in the course of carrying out field activities. • AECOM will furnish a fully equipped vehicle, including all sonic leak detection equipment, tools, and safety equipment for the duration of the project. Our Fluid Conservation System computer leak correlators will be utilized to pinpoint leaks. • Prepare a yearly final report and Submit five(5)copies of the report showing the results of the investigations. The report shall include a summary of the project and a list of leakage located by type, location, and estimated quantity of leakage. The final report will contain recommendations for future work based on the results of this survey. Schedule • Leak Detection Phase:4-5 weeks • Final Report: 2-4 weeks after field work City Responsibilities Client, at its expense, shall do the following in a timely manner so as not to delay the Services: • Furnish AECOM the following informationlreportslassistance, all of which AECOM may rely upon without independent verification in performing the Services. • All available street maps and water distribution system maps. • One(1)experienced person with a good working knowledge of the water distribution system to assist on a part-time basis in field activities such as location of system components. • Access to valves and curb stops by uncovering and cleaning valves and curb boxes,where required, prior to initiation of field activities. The City agrees to hold harmless and indemnify AECOM against any liability arising out of the items above for which the City is responsible. City Representative Designate a representative for the Project who shall have the authority to transmit instructions, receive information, interpret and define City's policies, and make decisions with respect to the Services. K TROPOSAUCity of OshkoshlOPP-497084_2016 Leak Detection ServiceakOPP-497084_2016 Leak Detection Services Proposai.docx AECOM 3 Compensation APCOM propose to perform the above described scope of work on a lump sum bases for a fee of $19,750.00. A breakdown of the estimated fees is provided below. Please note lump sure fee will be adjusted if segment length is reduced or increased. The above described scope of services will be performed in accordance with the negotiated City of Oshkosh Terms and Conditions dated April 2009, Municipal System Area Outside the 2014 and 2015 Survey Areas (100 miles) $18,250.00 Preparation 1 Project Management 1 Report $1,500.00 Total $19,750.00 We appreciate this opportunity to provide services to the City of Oshkosh. If you desire to proceed with these services please sign the attached Authorization Form and return one signed copy to Paul Timm. If you have any questions concerning the information contained herein, please feel free to contact us. Sincerely, 7 Tim Wolf Thomas J. Holtan, PE ,`�,,, Project Eng Senior Project Manager Attachment; Authorization Form K TROPOSAL1City of OshkoWOPP-497484_2016 Leak Detection Services\OPP-497084_2016 Leak Detection Services Ptoposal.docx �� AECOM 920.235.0270 tel ASC558 North Main Street 920.235.0321 fax Oshkosh,Wisconsin 54901 Authorization June 1, 2016 1 hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. hereby authorize AECOM to proceed with the scope of work for the 2016 Leak Detection Services as described in AECOM's proposal number OPP-497084 dated June 1, 2016,with a budget authorization of$19,750 under the general terms and conditions specified in the proposal. Sign ture Date Mark A Rohloff Print Name City Manager Title/Organization Signatur tt p Date fig; a VPS Printe City CIerV1 - TitiOrganization Zo Sig atu Date Lynn A. Lorenson; Print Name City Attorney Title/Organization (Yin( -4\Cv- : j 15P y Signature Date Trena Larson Print Name Director of Finance Title/Organization KTROPOSAUCity of Oshkosh\OPP-497084-2016 Leak Detection SeMceMOPP•497084_2016 Leak Detection Services Proposal.docx AECOM 5 1 agree to accept invoices from AECOM via e-mail and not postal mail: Yes Signature: E-mail address: Recipient Mr./Ms: Return to: Name: Paul Timm 558 North Main Street Address: Oshkosh, WI 54901 Email: paul.timm@aecom.com Phone: 920.236.6718 K\PROPOSAUCity of 0shkosh\0PP-497084_2016 Leak Detedon SefvIcesWP-497084_2016 Leak Detention Services Proposal.docx